- OPERATING DATA REPORT DOCKET NO. 50-369-DATE. 9-15-83 COMPLETED BYC_J. A. Reavis TELEPHONg 704-373-7567
. OPERATING STATUS No tes *NbTE: Name31dteRating
~
- 1. Unit Name:
McGuire thit 1 (Gross MWe) calculated as
- 2. Reporting Period:
August i. 1983 Angrrd 11. 1333.. '
I450.000 MV A x -.90- hower'
- 3. Licensed Thennsl Power talW ):
facter per P. ige iit, 1305*
- 4. Nameplate listing (Grow Siwe t NUREG-0020.
- 5. Design Electrical Rsting'tNei > Neb ll80 s
- 6. Sissimum Dependable Capacity IGross alWe):s 1180
- 7. hissimum Deperdsble Capaeny INcJ.31Wel:
p S. If Changes Occur in cspacity Rating titems Number 3 Through 7)Since Lsd Report.Gise Ressons:
.k'
' 9. Power Level To Which Restricted. lf Any (Nc:.s1W' e).
- 10. Ressons For Restrictions. lf Ati.v:
m This alonth Yr..'c Date Cumulative 744'.0-5 831.0 15 335.0
- 11. Hours In Reporting Period",
'356.5 2 334.6
~~ 9 472.7
- 12. Number Of Hours Rese'tu' Wa(Critical r
'13. Rescror Reserve Shutdown Hour's i.-
~
3A7.4 2 287.2c
' 9 379,4
- 14. Hours Generstor On Line
-T
- 15. Unit Resene Shutdown Hours
- 16. Gross Thernal Ener;y Cinerated i>lWH) 1 129 545 6 ll)3 346 19.605 764',
- 17. Gross Electr es! Energy Genernted olWH) 393 820 z 2 124 815 6 751-406--
IS. Net Electrics: Energy Genersted plWH) 369-d2p_L 1 986 870 6 308 193 19, Unit Service Facros; 46'.7 39.2
- 61. 2
.46.7 39.2 61.2
- 20.~ Unit Ava:Isbility Factor
+
^42.1 28.9 34.9
~
Ol'. Unit Capseity Fsetor (Usit; alDC Nett.
- 22. Unit Capseity Factor (Using DE;. Net) 42.1 28.9 34.9
- 23. Unit Forced Outace" Rate 53.3 27.5 23.7
- 24. Shutdowns Schedukd Oser Nest 6 Stopths (Type.Dste.snt'.Durstion of dachi:
Refueling - March 1, 1984 - 10 Weeks A
~
- 23. If Shut Down At End Of ilepiirt Period. Estimated Date of Startup:
- 26. Units In Test Ststus (Prior io Ci.nuoercial Operationr forecast Achiesed INITI A L C RITICA LI TY INITIA L'l:L EGltici r.
Cost.str.itC1.s L Oi'I.it A f1ON L ~
(*1/ 77 )
_. r309200034 830915 7
PDR ADOCK 05000369 R
~
V a.
),
DOGET 0 369 U-UNIT SilUTDOWNS NI) POWEll it Eli TIONS u,
4 DATE 9-15-83
_ A Reavis J
COMPLETED llY ItEPOllT MONTil August, 1983
- TEl.EPilONE 704-373-7567
.g
~;
$7
.E' Licenser ft,
t Came & Ciotective i
No.
D.iie jg j
j j y.
Event gy
- 9. ]
Attion to s
f5 j~ ;f, p
'ltepost er -
in U 5'
Prevent Itceurtence H
U
,6 o
11 63-08-01 F
6.00 A
CH Relayx Feedwater pump relays tripped.
12 83-08-06 F
39.28 8
1 CB Valvex Attempt to repair leaking primary system valve.
13 83-08-07 F
23.53 A
1 HI
'Valvex Fuses blown on two.S/G bl'owdown valves.
18-p 83-08-09 F
B' HI Valvex Reduce power to work on S/G blowdown l
valve.
14 83-08-12 F
3.77 B
3 HA ZZZZZZ Loss of electric load test 12 F
B CB Valvex Replace. leaking primary system valve..
14A 323.98 J
4 i
i I
.I F: Forced Reason:
Methoil:
Exhibit G - Insirnctions S: St heduled A l'iguipinent Failure (Explain) 1-Manual for Preparation of Data i
Il Maintenance of Test 2 Mannat Serarn.
liniry Stieets for I.icemee
~ C Itefocling 1 Automatic Scram.
Even Report (I. lilt) File INtiltEG-D Itegulatory llest ricilon
-1 Olber (Expl sin) 01611 I?Opeiator Training & Licenso fixamination F Administrative 5
1' G-Opciational lirror (thplain) '
thhibit I Same Soinee
{
P)/77)
Il Other Ilixplain!
e
AV cd Wc U Ad.r c.N1 r ?ChER LEVEL 50-369 OCCKIT NO.
LNIT McGuire Unit 1 9-15-83 04TE COMPLEHD SY J. A. Reavis TELI? HONE 704-373-7567
.\\f0NTri August 1983 DAY AVERacz DAILY POWER LIV ~'
- Y
^VERACE DAILY power LIV L
~
(3twe Neu t.ilbe Nets 672 I-1155 IS
~
1154 3
19 4
1153 20 1095 5
~
o n
23 s
40 24 9
1013 25 25 489 l
1151 1149 869 1151 32 3
I I.
1151
- 9 14 30 1150 1
IS 31 1153 Io INSTRL'CTICNS ed
- ~
~s**
y *,
. 1g*
f "T w.** *.9 j : a r* * = [.,;.;;;.,
4 ee
- ^ * ' * * * * " *
""2 *.d2f tt! S hegg,-,g pg g;.
..; - i 1
r i
l l
e
,-c,
,-n,
o DOCKET NO:
50-369 UNIT:
McGuire 1 DATE:
9-15-83 NARRATIVE SU>SIARY Month:
August, 1983 McGuire Unit one entered the month critical but still offline following a trip due to feedwater pump relays in July. The Unit was online at 6 AM on the first and reached full power the same day. The Unit was shutdown on the 6th. to attempt to repair 1NC-18, D loop cold led RTD return isolation valve.
When re-turning to service the Unit was forced back offline to repair blown fuses on the steam generator blowdown containment isolation valves. The Unit returned to service on the 8th, but had to hold at 50% power on the 9th, for additional work on a steam generator blowdown valve. A Unit trip occurred on the 12th. during the loss of electric load test and an outage for replacement of NC18 was started at that point. The Unit returned to service on August 26 and operated 't full a
power the remainder of the month..
e 9
=
MONTIILY REFUELING INFORMATION REQUEST M Guire Unit 1 1.
Facility name:
2.
Scheduled next refueling shutdown:
March, 1984 3.
Scheduled restart following refueling:
May, 1984 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If yes, what will these be?
Technical Specification changes needed to support transition to optimized fuel.
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
October, 1983 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Optimized fuel to be used.
Improved thermal design procedure used in safety analysis.
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
31 8.
Present licensed fuel pool capacity:
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
DUKE POWER COMPANY Date:
September 15, 1983 I
Name of
Contact:
J. A. Reavis Phone: 704-373-7567
OPERATING DATA REPORT 50-370 DOCKET NO.
DATE 9-15-83 COh!PLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS McGuire Unit 2 Notes: Narneplate Rating
- 1. Unit Name:
- 2. Reporting Period:
Anoust 1. 1983 - August 31, 1983 (Gross Mwe) calculated as
- 3. Licensed Thermal Power ()!wri: 170.
1450.000 MVA x.90 power
- 4. Nameplate Rating (Gross 5tWe): 1305*
factor per page lii, NUREG-0020.
1180
- 5. Design Electrical Rating (Net 31We):
- 6. Staximum Dependable Capacity 8 Gross StWel:
- 7. Staximum Dependable Capacity (Net StWei:
1180 S. If Changes Occur in Capacity Ratings a ttems Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. !f Any (Net StWe):
- 10. Reasons For Restrictions. If Any:
This Stonth Yr..to Date Cumulative
- 11. Hours in Reporting Period
~
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Urut Reserve Shutdown Hours NOT IN COMMERCIAL OPERATION
- 16. Gross Thermal Energy Generated (AlWH)
- 17. Gross Electrical Energy Generated (StWH)
- 18. Net Electrical Energy Generated (SIWH) i
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacicy Factor IUsing StDC Net) l
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 5tonths Type. Date, and Duration of Eachi:
i i
l
- 25. If Shut Down At End Of_ Report Period. Estimated Date of 5::rtup:
~
- 26. Units in Test Status iPrior to Commercial Operation):.
Forecast Aehieved l
INITIAL CRITICA LITY 5/8/83 INITIAL ELECTRICITY 5/23/83 COStatERCIAL OPER ATION 3/84 f
r-
McGUIRE NUCLEAR Station Operating Status Report 1.
Personnel Exposure For the month of July, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body dose for July has been compared with the Technical Specifications annual value of 3 mrem; the total release for July was less than 10 percent.
The total station gaseous release contribution to any organ dose for July has been compared with the Technical Specifications annual value of 15 mrem; the total release for July was less than 10 percent of.this limit.
DUKE PowEn GOMPANY 15.0. ISOX 33180 CIIAHl.OTTE, N.O. 28242
"^I" ";,5),"
September 15, 1983 pZf6""1 mu....mm.
/ Director
(
Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Document Control Desk Re: McGuire Nuclear Station Docket No. 50-369, -370
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of August, 1983.
Very truly yours, d ah Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Washington, D. C.
20555 l
Atlanta, Georgia 30303 Mr. Phil Ross Mr. Bill Lavallee U. S. Nuclear Regulatory Commission Nuclear Safety Analysis Center MNBB-5715 P. O. Box 10412 Washington, D. C.
20555 Palo Alto, California 94303 INPO Records Center Senior Resident Inspector Suite 1500 McGuire Nuclear Station 1100 Circle 75 Parkway Atlanta, Georgia 30339 ZE-$
'js
.-