J .i{ '

c NRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE: January 13. 1995 COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 OPERATidG STATUS

1. Unit Name: San Onofre Nuclear Generatino Station. Unit 2
2. Reporting Period: December 1994
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127

, 5. Design Electrical Rating (Net MWe): 1070

6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1070
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 8.760.00 99.697.00
12. Number Of Hours Reactor Was Critical 744.00 8.760.00 76.774.59
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 8.760.00 75.631.34 '
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2.522.349.10 28.803.599.40 247.377.855.84
17. Gross Electrical Energy Generated (MWH) 835.070.00 9.763.711.50 83.851.499.50
18. Net Electrical Energy Generated (MWH) 797.737.00 9.309.396.00 79.564.094.88
19. Unit Service Factor 100.00% 1CL 00% 75.86%
20. Ur.it Availability Factor 100.00% 100.00% 75.86%
21. UnitCapacityFactor(UsinaMDCNet) 100.21% 99.32% 74.58%
27. Unit Capacity Factor (Usin3 DER Net) 100.21% 99.32% 74.58%
23. Unit Forced Outage Rate 0.00% 0.00% 5.50% -
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refuelina Shutdown. Feb;Jary 11. 1995. Duration (64 days)

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1  ;

9501300160 950113 PDR ADOCK 05000'561 R f )R

.l t

.l t

AVERAGE DAILY UNIT POWER LEVEL j DOCKET NO: 50-361  ;

UNIT NAME: SONGS _- 2 ,

DATE: January 13. 1995  !

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: December 1994 _ l I

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) i 1 1078.38 16 1078.17 i 2 1076.00 17 1069.33  !

3 1075.71 18 1077.71 4 1075.33 19 1077.67 i 5 1075.6a 20 1077.88 l

) 6 1075.21 21 1077.29 i 7 1076.25 22 1076.75 j 8 1076.25 23 1076.46 ,_ .

9 1053.75 24 1075.00 I 10 982.04 25 '1075.46  :

11 1077.50 26 1075.88 i i

12 1078.04 27 1075.75 13 1078.83 28 1075.25 14 1070.58 29 1075.29 l l

15 1076.88 30 1075.00 i 31 1073.79  ;

t i

f i

I 2

i

l UNIT SHUTDOWNS AND POWER REDUCTIONS 60tKE! NO: 50-361

, UNIT NAME: SONGS - 2 REPORT MONTH: December 1994 9 ATE: January 13. 1995

. COMPLETED BY: J. L. Darlina l TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration 2

Down LER System Component 5

Action to

  • No. Date Type l (Hours) Reason Reactor' No. Code' Code Prevent Recurrence There were no unit shutdowns or reductions in the Average Daily Power Level of more than 20% this reporting period.

1 F-Forced ' Reason: ' Method: "IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual 5

B-Maintenance or Test 2-Manual Scram. 1EEE Std 803A-1983 C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-0ther (Explain) than 20% from the previous day 6-Other (Explain) 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH ,

DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE: January 13. 1995 '

COMPLETED BY: J. L. Darlina TEl.EPHONE: (714) 368-6223 Date Time Event j December 01 0001 Unit is in Mode 1, 98% reactor power, 1124 MWe, December 09 2030 Commenced Unit load reduction to 80% to perform heat treat of the circulating water system.  !

2229 Unit at 80% reactor power, 878 MWe.

December 10 0700 Commenced Unit load increase following completion of the circulating water system heat treat.

1057 Unit at full load 97.8%, 1120 MWe.

December 14 0027 Main turbine governor valve 20V-2200F failed closed ,

concurrent with a system frequency disturbance.

Unit load decreased to 1050 MWe as a result of closed valve. Reactor power was maintained at full power by the steam bypass control system.

0045 System frequency stabilized at approximately 60 Hz. ,

0127 Main turbine governor valve 2VV-2200F returned to service.

0131 Commenced increasing Unit load to full power.

0230 Unit at full load 1122 MWe.

December 31 2400 Unit is in Mode 1, 97.7% reactor power,1123 MWe.

4

l l

l REFUELING INFORMATION i DOCKET NO: 50-361 UNIT NAME: SONGS - 2 .,

DATE: January 13. 1995 COMPLETED BY: J. L. Darlina

  • TELEPHONE: (714) 368-6223 MONTH: December 1994
1. Scheduled date for next refueling shutdown.

]

Cycle 8 refueling outage is forecast for February 11, 1995.  !

2. Scheduled oste for restart following refueling.

]

Restart from Cycle < cefueling outage is forecast for April 15, 1995.

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes What will these be?

A. A proposed change to the Technical Specifications has been requested which will revise the minimum water level in the refueling cavity with only one train of shutdown cooling operable.

B. A proposed change to the Technical Specifications has been requested to revise the allowed Linear Heat Rate from 13.9 to 13.0 kw/ft.

C. A proposed change to the Final Safety Analysis has been requested to remove the diversity requirement of the pressurizer pressure transmitters ,

providing input to the shutdown cooling open pennissive interlock.

D. Proposed change to the Technical Specifications (PCN 431), revising the ,

automatic reset of the low pressurizer pressure bypass, has been revised  !

to simplify the request. -

E. A proposed change to the Technical Specifications has been requested to i allow a 3.0.4 exception for entering Modes 5 and 6 with the Control Room  ;

Emergency Air Cleanup System inoperable.

I I

(

I REFUELING INFORMATION DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE: January 13. 1995 COMPLETED BY: J. L. Darlina ,

TELEPHONE: (714) 368-6223  !

4. Scheduled date for submitting proposed licensing action and supporting information.

A. Refueling Cavity Water Level Submitted July 28, 1994 B. Linear Heat Rate Submitted September 16, 1994 C. Pressure Instrument Diversity Submitted July 6, 1994  :

D. Low Pressurizer Pressure Bypass Revision submitted September 6, 1994 E. Control Room Air Cleanup System Submitted August 26, 1994

5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None.

6. The number of fuel assemblies. ,

A. In the core. 217 B. In the spent fuel storage pool. 722 Total Fuel Assemblies 592 Unit 2 SDent Fuel Assemblies 60 Unit 2 New Fuel Assemblies 70 Unit 1 SDent Fuel Assemblies C. In the New Fuel Storage Racks 22 Unit 2 New Fuel Assemblies -

7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 2005 (full off-load capability) ,

I 6

. _ - ~ . -

F, NRC MONTHLY OPERATING REPORT SAN ON0FRE NUCLEAR GENERATING STATION, UNIT 3 DOCKET N0: 50-362 UNIT NAME: SONGS - 3 l DATE: January 13. 1995 COMPLETED BY: J. L Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatina Station. Unit 3
2. Reporting Period: December 1994
3. Licensed Thermal Power (MWt): 3390
4. Namepir.te Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1080
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1080
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 8.760.00 94.248.00 '
12. Number Of Hours Reactor Was Critical 744.00 8.760.00 74.686.45 ,
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 8.746.60 73.043.49 >
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 .
16. Gross Thermal Energy Generated (MWH) 2.440.821.97 28.476.256.29 235.148.046.00 l
17. Gross Electrical Energy Generated (MWH) 832.939.50 9.689.269.50 79.832.676.50 1.6. Net Electrical Energy Generated (MWH) 789.637.00 9.177.872.00 75.440.910.94 19, Unit Service Factor 100.00% 99.85% 77.50%
20. Unit Availability Factor 100.00% 99.85% 77.50%

21.. Unit Capacity Factor (Using MDC Net) 98.27% 97.01% 74.12%

22. Unit Capacity Factor (Using DER Net) 98.27% 97.01% 74.12%
23. Unit Forced Ostage Rate 0.00% 0.00% 6.11%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None .

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA t INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION HA NA 1

L

l AVERAGE DAILY UNIT POWER LEVEL DOCKET N0: 50-362 UNIT NAME: SONGS - 3 DATE: January 13. 1995 '

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 <

MONTH: December 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1064.04 16 1062.58 i 2 1062.58 17 1062.21 i 3 1061.46 18 1062.25 l

4 1061.67 19 1061.42 5 1061.79 20 1062.17 6 _

1062.08 21 1061.42 7 1057.71 22 1061.79 8 1062.08 23 1061.25 ,

9 1061.63 24 1049.83  ;

10 1060.63 25 1062.33  !

11 1061.75 26 1061.17 12 1060.83 27 1060.04' ,

13 1061.08 28 1060.46 14 1061.96 29 1061.46 15 1062.88 30 1063.25 I 31 1063.75 i

I i

2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: December 1994 DATE: January 13. 1995' COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason 2 Reactor' No. Code' Code 5 Prevent Recurrente There were no unit shutdowns or reductions in the Average Daily Power Level of more than 20% this reporting period.

3 1F-Forced ' Reason: Method: "IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual S

B-Maintenance or Test 2-Manual Scram. IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) 3

SUM 4ARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET N0:- 50-362 UNIT NAME: SONGS - 3 DATE: January 13. 1995 COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event December 01. 0001 Unit is in Mode 1, 97% reactor power, 1110 Mwe.

December 31 2500 Unit is in Mode 1, 97.1% reactor power, 1110 MWe.

4

I i

REFUELING INFORMATION DOCKET N0: 50-362 UNIT NAME: SONGS - 3 DATE: January 13. 1995 ,

-COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 NONTH: December 1994  !

1. Scheduled date for next refueling shutdown.

Cycle 8 refueling outage is forecast for July 8,1995.  !

2. Scheduled date for restart following refueling.

Restart from Cycle 8 refueling outage is forecast for September 11, 1995. j

3. Will refueling or resumption of operation thereafter require a Technical  !

Specification change or other license amendment?

Unknown et this time for Cycle 8 refueling.  !

What will these be?

NA l

4. Scheduled date for submitting proposed licensing action and supporting )

information.  !

NA i

5. Important licensing considerations associated with refueling, e.g. new or  ;

different fuel design or supplier, unreviewed design or performance analysis i methods, significant changes in fuel design, new operating procedures.

None.

5

4 REFUELING INFORMATION DOCKET N0: 50-362 '

UNIT NAME: SONGS - 3 DATE: January 13. 1995 i COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 l

6. The number of fuel assemblies. t A. In the core. 217 l B. In the spent fuel storage pool. 710 Total Fuel Assemblies  !

592 Unit 3 SDent Fuel Assemblies  :

0 Unit 3 New Fuel Assemblies 118 Ur,it 1 Spent Fuel Assemblies

7. Licensed spent fuel storage capacity. 1542___

t Intended change in spent fuel storage capacity. None  ;

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 2003 (full off-load capability). -