ML20080F198

From kanterella
Jump to navigation Jump to search
Clarifies Commitments Documented in Re HVAC Installation.Records of All Filler Metal (Not Only Weld Rod) Will Be Kept for Matl Traceability Purposes
ML20080F198
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/23/1983
From: Farrar D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20080F187 List:
References
7181N, NUDOCS 8309190218
Download: ML20080F198 (2)


Text

-[' -

CN Commonwealth Edison

[

) One First Nati: nit Ptiza. Chicigo, Illinois iG 7 Address Reply to: Post Office Box 767 (j/ Chicago, Illinois 60690 August 23, 1983 Mr. James G. Keppler, Regional Administrator

- Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Braidwood Generating Station Units 1 and 2 HVAC Installation NRC Docket Nos. 50-456 and 50-457 Reference (a):

August 17, 1983 letter from D. L. Farrar to J. G. Keppler

Dear Mr. Keppler:

This letter is provided to clarify commitments documented in reference (a) regarding HVAC installation work at Braidwood Station.

These clarifications were requested by Mr. Robert Schulz to botter document actions previously agreed upon.

They do not involve any changes to the actions already underway.

Tt.e following comments clarify actions la through ld of reference (a) relative to HVAC contractor procedure changes at Braidwood Station:

la) Records of all filler metal (not only weld rod) will be kept for material traceability purposes.

lb) Weld procedure and weld material will be specified prior to craft welding activities by competent personnel not directly involved in production welding.

In no case will the welder or his foreman be relied upon to select the proced.ure or material.

Ic) The QC surveillance of in-process welding will include inspection of a portion of the welding.

Fitup will be included in these inspections, ld) Before weld metal 11s added to existing welds, the acceptability of those welds will be determined.

The basis for these determinations will be available for NRC review.

8309190218 830914 PDR ADOCK 05000456 0

PDR AU3 2 61963

(__

o.

.~

, Please contact this office if these comments do not fully clarify Commonwealth Edison's commitments.

r Very-uly yours,

_ _4 D. L. Farrar Director of Nuclear Licensing 7181N i