Interim Deficiency Rept DER 83-46 Re Borg-Warner Valve 2JCHAHV524 Manually over-torqued During Hydrostatic Testing. Initially Reported on 830715.Final Rept Will Be Delayed Until 830929 Due to Extensive Investigation & Evaluation
ML20080D436
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/12/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-27559-RQT, DER-83-46, NUDOCS 8308300451
Download: ML20080D436 (3)


Text

...,.,

CEGENED MnD Arizona Public Service Company 9

e, p : i

% fI' P O. Box 21666

  • PHOENIX. ARIZON A 85036 August 12, 1983,, _

ANPP-27559 % f/BSK" U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Interim Report - DER 83-46 A 50.55(e) Potentially Reportable Deficiency Relating to Borg-Warner Valve Manually Over-Torqued During Hydrostatic Testing File: 83-019-026 D.4.33.2

Reference:

Telephone Conversation between P. Narbut and R. Tucker on July 15, 1983

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an interim Report is attached. It is now expected that this information will be finalized by September 29, 1983, at which time a complete report will i

be submitted.

I Very truly urs,.

i e

1RA AdC E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/RQT:ske Attachment ec: See Attached Page 2 8308300451 830812 PDR ADOCK 05000528 S

PDR j

..,?

INTERIM REPORT - DER 83-46 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1, 2 AND 3 i

I.

Potential Problem During hydrostatic testing, Borg-Warner Valve 2JCHAHV524 was i

manually closed to the' extent that the 5/16" bolts mounting the actuator to the yoke failed.

1 The valve cannot hold pressure, it leaks past the seat.

Damage to the valve-stem can occur if greater than thirty (30) i pounds of rim pull is applied to the handwheel, as reported by Combustion Engineering in Letter V-CE-20369.

II.

Approach To and Status Of Proposed Resolution CE's initial investigation indicates that the manual handwheel rim pull, specified as forty (40) pounds, is in excess of valve.

design. CE has advised APS to limit manual operation of Valves CH-255 and CH-524 for all three units to twenty-five (25) pounds or less as an interim solution. A long-term solution to this problem is being investigated by Borg-Warner and CE.

Bechtel Engineering is corresponding with CE to provide reportability disposition and technical justification for corrective action.

III. Projected Completion of Corrective' Action and Submittal of'the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by September 29, 1983.

I 2

-~. - -

o o7

  • U.

S.~ Nuclear Regulatory' Commission Attention:

Mr. D. M. Sternberg, Chief ANPP-27559-RQT/BSK August 12, 1983 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees 4

J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant L. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Records Center Institute of~ Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 I

1 e

,u<,.

-~

y-y-

..v--

+

-,..