Corrects Forwarding Results of Monitoring Diesel Generator Rocker Arm Lube Oil Temp During Startup Testing Per Sser 4.Installation of Rocker Arm Lube Oil Cooling Sys Not Required.Ltr Issuance Date Corrected to 840202
ML20080C251
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 02/02/1984
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
84-0022, 84-22, NUDOCS 8402080030
Download: ML20080C251 (6)


Text

Pleas] n:t2 that SLNRC 84-0022 was dat:d incorrectly of February 22,1984.))

The c rr:ct date was February 2, 1984. Please replace th3 incorrcct copy

)

g g this on2. Thank you.

./

m ans w e ses m en. w u.et em== nem sy e s ense. chw.y Red Neolas A.Petrick U,hpM80 Emesutin Director February ;2, 1984 SLNRC 84- 0022 FILE: 0278 SUBJ:

Diesel Generator Pocker Arm Lube Oil Temperature Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Docket Nos. STN 50-482 and STN 50-483

References:

1.

SLNRC 81-081, dated August 31, 1981:

NRC Request for Additional Information - Mechanical Section of Power Systems Branch 2.

NRC letter (8. Youngblood) to Kansas Gas & Electric (G. Koester) dated December 19, 1983:

Supplement No. 4 to the Wolf Creek Generating Station, Unit 1 Safety Evaluation Report

Dear Mr. Denton:

Reference 1 modified the response to SNUPPS FSAR Question 430.32 to x.

indicate that diesel generator rocker arm lube oil system temperature will be monitored in the initial test program to confirm proper oper-ation.

This commitment became licensing Confirmatory Issue No. 26 for Callaway Plant and B.26 for Wolf Creek Generating Station.

The NRC Safety Evaluation Reports for the SNUPPS plants, section 9.5.7, state that the test results must be submitted to the NRC staff for evaluation and, if the manufacturer's limits on lube oil temperature are exceeded, a cooling system will be provided.

Enclosed is a report which provides a summary of the results of monitor-ing rocker arm lube oil temperature during the Callaway startup test program.

In accordance with the prior agreement between the SNUPPS Staff and the NRC staff, this test was prototypical and applies to all emergency diesel engines at the SNUPPS plants. Also, per that agree-ment, the bases for considering the test prototypical are described in the report. Based on the test results, the installation of rocker arm lube oil cooling system is not required for the SNUPPS emergency diesels.

8402080030 840202 PDR ADOCK 05000402 E

PDR 4

SLNRC 84- 0022 page 2.

Since Reference 2 converted this issue to an NRC Office of Inspection and Enforcement verification item, the test results are also being provided to IE Regions III and IV.

Ver truly yours, Nic olas A.

etrick v (K MHF/nid8bl&2 Enclosure cc:

D. T. McPhee KCPL G. L. Koester KGE D. F. Schnell UE J. Neisler/B. Little USNRC/ CAL W. Schum/A. Smith USNRC/WC J. Konklin USNRC/RIII

~ - - -

E SNUPPS i

P DIESEL GENERATOR ROCKER ARM LUBE OIL TDiPERATURE TEST REPORT SER Confirmatory Item 26 for Callaway and Item B.26 for Wolf Creek 4

I i

l l

t l.

r r

I February, 1984

1.

PURPOSE I

This report provides the results of testing performed on a diesel generator at Callaway to allow the NRC to close SER confirmatory Item 26 for Callaway

[

and Item B.26 for Wolf Creek.,This item required that the performance of the diesel generator rocker arm lube oil system (RALOS) temperature be monitored to ensure that'it remains below the engine manufacturer's recommended limit.. This requirement was imposed because the RALOS does not include'a heat exchanger to-remove the heat gained while lubricating the rocker arms.. The heat is lost ~to the surrounding atmosphere from the externally located piping and storage tank.

II.

BACKCROUND

-During the NRC review of the diesel 3enerator auxiliary systems, the absence of-a RALOS heat exchanger was questioned. -It was noted that this subsystem is designed to be completely independent of the main lube oil system to preclude contamination of the main lube oil system with water and/or fuel. The NRC was advised that this was a standard design for the Colt-Pielntick engine and that past operating experience has not indicated any_ design inadequacies with respect to the ability to maintain the rocker arm lube oil temperature within the specified 165 F limit.

Since_this issue was raised as a generic concern and the diesel generators, the rooms, the ventilation systems and the environmental conditions are the same, it was determined to.be necessary to test only one diesel generator's RALOS. The 2 diesel generators at both sites are identical and the RALOS is completely contained on the skid. Heat rejected to the room will be the same for each diesel's RALOS, which have identical routings and components.

~

The RALOS piping is located external to the diesel engine block._ The supply and return lines to each cylinder bank is located below the combustion air inlet manifold on the side of the engine. Air is free to flow over the common lines and the individual supply and return lines provided to each cylinder from the common headers. There are no significant heat sources in the vicinity of these lines. The exhaust manifold is located between the two banks of cylinders above the engine centerline and it is insulated.

~ The common supply and return headers from each cylinder bank are combined in the vicinity =of the RALOS~ storage tank and pump, which are located on the north.end of the engine skid. No significant heat sources are located near these components and lines.

-Each diesel generator is located in a separate room having essentially the same dimensions and layouts. The diesel generator rooms are part of the SNUPPS power block design and are the same for both sites. The room layouts are shown on FSAR Figures 1.2-24, through 1.2-28.

As' described in FSAR Section 9.4.7, each diesel generator room is provided with the same ventilation system, which maintains room ambient conditions l

, 4

~_._ _ _.._ _,_._ _ __. -....

  • ^

- g _

below the 122 F upper limit during summer operation. During winter operation, a minimum amount of outside air is brought into the room to provide combustion air for the diesel. The minimum winter room temperature

-during operation will be 60 F.

The ventilation system hardware and controls are designed to maintain these conditions at both Callaway and Wolf Creek.

There are no known parameters which would require more than one diesel's RALOS temperatures to be monitored.

l III. DESCRIPTION OF TEST CONDITIONS AND RECORDED DATA In order to assure that the testing would provide sufficient information to allow the SER item to be closed by the NRC, special test provisions and data collection requirements were specified.

The RALOS test was specified to be conducted during a full load run in concert with the preoperational test program and ensured adequate time for stabilization at the continuous load rating of the engine. To ensure that the room temperature was sufficiently high to provide meaningful results, a minimum room temperature of 100 F was specified. Tha recirculation damper position reaperature controller was to be reset to ensure only the minimum amount of outside air was allowed to enter the room. This was required because of preoperational testing during the winter conditions. The temperature controller was reset to 122 F and was fully operational to ensure that the maximum design room temperature was not exceeded during the test.

The ventilation fan was to be placed in the manual (on position) to ensure its continued operation and circulation of air to enhance uniform temperatures within the room.

Throughout the test period at full load operation, 3 room temperatures were to be recorded. Room temperatures were specified to be taken at the inlet

.to the room recirculation air system, near the diesel generator and at another location not directly in the air flow path or near significant heat sources.

The RALOS temperatures were specified to be taken at four locations and were to be recorded. The common return lines from each of the 2 cylinder banks were to be monitored as were the inlet and outlet lines from the RALOS storage tank.

Test data was taken for a 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> period during the full load preoperational test conducted on Callaway's diesel generator A.

The conditions and prerequisites stated above were met and the data taken was evaluated for acceptability.

l

' l l

' *.- '^

IV.

RESULTS AND

SUMMARY

The test data indicates that the RALOS temperatures stabilized as predicted and were well below the engine manufseturers limit of 165 F.

Tha data also indicates that the RALOS fluid is progressively cooled by the room air as it returns to the storage tank and while in the tank.

The 22 houre of' data is summarized as follows:

Room temperatures near the diesel averaged near 110 12 F throughout the test period (artificially raised by means stated above). The remote room temperature (away from heat sources and active ventilation flow paths) averaged 104 12 F throughout the test. These temperatures are sufficiently close to the 122 F summer limit to allow extrapolation of data to predict the response to the design summer conditions.

The. fluid returned from.the RALOS entering and leaving the storage tank averaged 134 2 F and 132 12 F, respectively. The fluid leaving the tank was consistently 2 F cooler than the inlet.

The RALOS common return line data (from each cylinder bank) also correlates well with the RALOS storage tank and room conditions. The return line from the east cylinder bank was slightly warmer than the common return line.

The return line from the west cylinder bank was cooler than the east cylinder bank return since it was actively cooled by the overnead discharge of recirculation air.

Extrapolation of data to the summer conditions is accomplished by conservatively assuming a IF rise in RALOS temperature for each IF rise in ambient room temperature. This assumption is conservative because the heat input to the lube oil will be less when the lube oil is warmer (lower temperature-difference) and slightly greater heat transfer from the lines at higher temperatures due to increased radiant and convective heat transfer.

Since the room temperature near the diesel averaged 110 F (12 F below the summer design case) the RALOS fluid temperature leaving the storage tank is predicted to increase from 132 F to approximately 144 F when the air next to the diesel is 122 F.

If this methodology were applied while using the cooler. room temperature (remote from heat sources) of 104 F, the RALOS fluid temperature leaving the storage tank would only be 150 F.

Both of these temperatures are well below the 165 F recommended limit.

In summary, the data taken during the 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> full load test fully supports the adequacy of the RALOS design for both summer and winter operation of the diesel generators at both the Ca11 sway and Wolf Creek sites.