Informs NRC That Addl Time Required to Complete Responses to Questions Re Internal Event Analysis of IPE
ML20080B842
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/02/1994
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M74464, TAC-M74465, NUDOCS 9412060308
Download: ML20080B842 (1)


Text

.

,f"iW Southem Califomia Edison Company 23 PARKER STREET IRVINE, CAL 3FORNI A 92718 December 2,1994 mr-wAt ren c. mns.4 MANAOVR OF Nt/Cl E AR F4MaOL ATOf t f AFF A6FtS 1714) 4*ad-440'l U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Additional Information on the Individual Plant Examination (IPE)

(TAC Nos. M74464 and M74465)

San Onofre Nuclear Generating Station Units 2 and 3

References:

1.

August 15, 1994 letter from Mel B. Fields (NRC) to Harold B.

Ray (Edison),

Subject:

Request for Additional Information on the Individual Plant Examination (IPE) for San Onofre Nuclear Generating Station, Units ?. and 3 2.

September 1,1994 letter from Walter C. Marsh (Edison) to the Document Control Desk (NRC),

Subject:

Additional Information on the Individual Plant Examination (IPE), San Onofre Nuclear Generating Station Units 2 and 3 This letter is to inform the NRC that additional time will be required to complete the responses to questions asked in Reference 1 related to the internal event analysis of the Individual Plant Examination (IPE) for San Onofre Units 2 and 3.

Our September 1,1994 letter (Reference 2) requested an extension of tt.e due date for these responses to December 13, 1994. At this time, responses to the questions have been prepared. However, because of the volume of these responses, additional time is required to complete our technical and management review.

An extension of the due date to January 20, 1995 is requested.

Sincerely,

. 'l <C) t s

  • i/

jb d Nam

(

h eC cc:

L. J. Callan, Regional Administrator, NRC Region IV

^

A. B. Beach, Director, Division of Reactor Projects, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV j

J. A. Sloan, NRC Senior Resident Inspector, San Onofre Uni.ts 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 l )6 9412060308 941202 PDR ADOCK 05000361 t