Arizona Public Service Company PO. BOX 21666. PHOENIX, ARIZONA 85036 Ed July 25,1983 Sj),,,?
ANPP-27399-BSK/RQT U. S. Nuclear Regulatory Commission g // -
Region V
'C
- f,;.O ',.
64 Creekside Oaks Of fice Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Interim Report - DER 83-43 A 50.55(e) Potentially Reportable Deficiency Relating to Improper Crimp Terminations In 12 Unit 1 Cabinets File: 83-019-026; D.4.33.2
Reference:
Telephone Conversation between P. Narbut and R. Tucker on July 8, 1983
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by September 27, 1983, at which time a complete report will be submitted.
Very truly yours, E E.
cu_L N
E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr./RQT:rb Enclosure cc:
See Page Two 8300050359 830725 PDR ADOCK 05000528 g
PDR G
hY
?
U. S. Nuclear Regulatory Commission Page Two ec:, Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 4
l w*.
INTERIM REPORT - DER 83-43 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS' UNIT 1 1.
Potential Problem Preoperational surveillance inspection has revealed that AMP crimp connectors installed on wiring for Auxiliary Relay cabinets ZAA-Col through ZAA-C06 and ZAB-C01 through ZAB-C06 do not meet AMP
' installation acceptance criteria: " Conductor should be flush or protrude through the connector barrel approximately 1/16 of an inch.".The cabinets were supplied by Harlo Corporation.
II.
Approach To and Status Of Proposed Resolution Bechtel engineering is corresponding with Harlo to determine reportability and corrective action required.
III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by September 27, 1983.
.t.