ML20080B017
| ML20080B017 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 01/26/1984 |
| From: | Quamme D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Hierzer G BECHTEL GROUP, INC. |
| References | |
| CSC-7230, NUDOCS 8402060427 | |
| Download: ML20080B017 (1) | |
Text
I CORStimBIS I
POWBr Site Manager 0&h0Of Midland Project Midland Project: PO Box 1963. Midland. MI 48640 (517) 631-8650 ED 91 R LNCIPAL STAFF 3g s-Anne j/HA
~ ' E January 26, 1984 Ays;
'.s t y RC
[.5. A s
V h
jil'S PAO 3_GA
,il Mr G A Hierzer
!NF
[Fi10 Me Bechtel Power Corporation P O Box 2167 Midland, MI 48640 MIDLAND ENERGY CENTER GWO 7020 BECHTEL FIELD PROCEDURES AND INSTRUCTIONS File: '0456, 0655, Bl.l.7 UFI: 99*08, 53*50*04, 12*50 Serial: CSC-7230 Please put CIO on controlled distribution for the index to Bechtel Field Procedures and Instructions.
Distribution should be made to J. J. Ridge, SWEC-CIO.
(D '
'2 L A%C DLQ/DDJ/ kip cc:
JGKeppler, NRC Region III JJHarrison, NRC Region III RJCook, NRC Site RAWells, MPQAD JEKarr, S&W NIReichel, MEC DDJohnson, MEC G402060427 840126 PDR ADOCK 05000329
^
PDR FEB 21984 M0'qo