hP 1-7 p ". ,! , ,

_! - i

, .  ; )e r*- u s r- 7,

,4 1> x , - , 3 i L. .l. 3 -- i1, 5 5 i i P.O. BOX 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9300 - lLLUMINATING BLOG. - 55 PUBLICSOUARE Semr; The Best Location in the Nation MURRAY R. EDELMAN January 30, 1984 ifiCE PRESIDENT NUCtIAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 (Standby Diesel Generators DSRV16 I Potential Detect Concerning IEEE 383

~Fa11ure in Certain Class 1E Circuits

[RDC 63(82)]

Dear Mr. Keppler:

Our final report to you dated December 22, 1983, concerning the potential defect associated with the IEEE 383_ failure in certain Clas L1 M ir, cult wiring in the standby diesel generst6r~s'ystem supplied by Transamerica Delaval, Inc.~~

~

stated that the installation of the replacement cable would be complete by January 31, 1984. The installation is now scheduled to be completed by March 16, 1984, due to a shipment problem.

Please call if there are any additional questions.

Sincerely, V

[

Murray R. Edelman Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner NRC Site Of fice Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8402060400 840130 PDR ADOCK 05000440 Ih M37

/