Requests Partial Release of Phase II Mechanical Controlled Documents & Work Prints Allowing Pneumatic Drop Leak Test to Be Performed on MSIVs to Resolve Problem W/Pitting in Packing Areas & Assure No Leakage in Turbine Roll
ML20080A918
Person / Time
Site: Midland
Issue date: 01/30/1984
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
STONE & WEBSTER, INC.
References
CSC-7251, NUDOCS 8402060397
Download: ML20080A918 (3)


Text

{{#Wiki_filter:- CONSUMERS POWER COMPANY MIDLAND ENERGY CENTER @} Transmittal No: CSC-7251 ..;i.

.^.,

Dates. : January.30~r 1984 To:. Stone & Webster P O Box 1963 ~ Midland.. MI:: 4.8640 - - - f : 1 1: ' i -) 1 2 ~: g<!!"' f P A L STAFF /?lNW?5 ! [' ]i- ~ ..nc it Attached Is: Partial Response To ,j g tb Complete Response To - 3 f., y L

4. y For Your Information 5iiG fUia M%

^ ~ X Other

== Description:== We request a partial release of Phase II Mechanical controlled doct'nents and work prints as listed in the attached Bechtel letter BCCC-8962. This will allow a pneumatic drop leak test to be performed on the (MSIV's) to resolve a potentially reportable problem with pitting in the packing areas and assure they will not leak in the upcoming Milestone of Unit 2 Turbine Roll. p/[ Signature:( f cc: 'JGKeppler, NRC Region III. w/a. JJHarrison, NRC Region III w/a RJCook, NRC Site w/a RAWells, MPQAD w/a BHPeck, MEC w/a NIReichel, MEC w/a DDJohnson, MEC w/a 2 N4 8402060397 840130 PDR ADOCK 05000330 -{ {0} S PDR I

1 Bechtel Power Corporation Post Office Box 2167 Midland. Michigan 4864o January 30, 1984 Consumers Power Company P.O. Box 1963 Midland, Michigan 48640 Attention: D. L. Quamme Site Manager Job 7220 Midland Project PNEUMATIC TESTING OF THE MAIN STEAM ISOLATION VALVES BCCC-8962

Dear Mr. Quamme:

Reference:

BEBC - 8157 Bechtel has received notification from Crosby Valve Company that the Midland main steam isolation valves (MSIV's) have a potentially re-portable problem with pitting in the packing areas. Construction has been requested by Project Engineering to perfom a pneumatic drop leak test to assure the MSIV's will not leak and possibly affect the upcoming Unit 2 Turbine Roll. Specifically, the MSIV valve bodies must be pressurized to 100 psig through the valve body drain and then monitored for leakage. Based on the above, we request that a special release of the current mechanical FCR/FCN stop work be granted to pemit the testing as out-lined below: 1) Utilize Construction Work Plan (CWP) No. 16-2ABB-M-2924, which has L been prepared for this work and requires the use of dwgs. 7220-M118A-5-7 and 7220-M118A-10-4 as field work prints.

2) A Field Inspection Record (FIR) and QCIR MP-1.60 will be prepared to cover the necessary QC inspection. This FIR and PQCI/IR re-l quires the following documents to be issued as controlled work j

Drints to MPQAD: a) M342 e) M118-A-10-4 b) M490 f) M632 Sht. 2 c) M480 g) M632 Sht. 3 d) M118-A-5-7 These referenced inspection records will not be closed until the DRR l has been reviewed.-

Bechtel PowerCorporation Page 2 BCCC-8962

3) When the mechanical document register is released, it is our intent to have QC compare the register to the documents listed in 2) above and resolve any discrepancies.

We request your reply on or before February 3, 1984. Very truly yours, Y 0 hy G. A. Hierzer Site Manager GAH/RJM/ajd e e e}}