I STONE & WEBSTER MICHIGAN, INC.

P.O. box 2325. BOSTON. M ASSACHUSETTS 02107 -, PRiflCIPAL STAFF MV _ tane JPxP D/n? ][

A/HA y. .is c

j. "'}1h R:A g 90 $y_ y3 '93

-* rito q,c, Mr. J. J. Harrison January 27, 1984 Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

DOCKET NO. 50-329/330 MIDLAND NUCLEAR C0 GENERATION PLANT RESUMES AND AFFIDAVITS FOR CIO STAFF MEMBERS SERIAL NO. SWMCP-022 Attached is the signed affidavit and resume for Mr. A. J. Benecchi.

Mr. Benecchi has been assigned to assist in headquarters' support of CIO activities.

/

Ncd.

CIOE. Karr Manager Program Enclosures JJR/nl cc: CIO General Files 8402060230 840127 PDR ADOCK 05000329 A PDR

\

\

Fijl, \

o UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 OM CONSUMERS POWER COMPANY 50-330 OM (Midland Plant, Units 1 and 2) Docket No. 50-329 OL 50-330 OL AFFIDAVIT OF Alan J. Berecchi My name is Alan J. Benecchi. I am employed by Stone & Webster Michigan, Inc. as Administrative Assistant.

I am currently assigned to the team which is proposed to conduct a Third Party Construction Implementation Overview at the Midland Nuclear Plant site. Prior to being given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task for or on behalf of Consumers Power Company or Bechtel relating to issues that I will be reviewing. Work that I have previously participated in is attached. I have never been employed by Consumers Power Company or Bechtel. I do not own any shares of Consumers Power Company or Bechtel stock. Mutual funds or other funds in which I may have a beneficial interest, but over which I have no control, may own shares of Consumers Power Company or Bechtel stock, of which I am unaware. A list of such funds in which I have an interest are attached. I have no relatives which are or have been employed by Consumers Power Company or Bechtel.

Signed: bw

  • l Suffolk, ss Commonwealth of Massachusetts l Sworn and Subscribed Before Me This 22nd Day of November 1983.

1 lNY Af$hu

'f' NOTARY PUBLfC /

I My Commission Expires: [//,/% ,,I //, /ffd

, v- ,-

r-I PREVIOUS WORK ASSOCIATED WITH MIDLAND PROJECT Consumers Power Company - Midland Spare Parts Determination Project -

-February 1980.

Provided evaluation and assistance in implementing the SWEC QA Program on the Spare Parts Determination Project.

LIST OF FUNDS Stone & Webster Employee Investment Plan Stone & Webster Employee Stock Ownership Plan Fidelity Cash Reserves Money Market Fund Patriot Money Market Account

'I h

Novambar, 1983 BENECCHI, ALAN J. ENGINEERING ASSURANCE ENGINEER ENGINEERING ASSURANCE DIVISION EDUCATION Tufts University - Bachelor or Science, Electrical Engineering 1970 University of New Haven - Master of Engineering 1977 LICENSES AND REGISTRATIONS Mr. Benecchi has 12 years experience in the engineering industry. Currently as Engineering Assurance Engineer in the Engineering Assurance Project Support Group assigned to the Operations Services Division, he provides guidance on and assists in the implementation of the Stone & Webster Engineering Corporation Quality Assurance Program as it applies to engineering and design activities.

Since joining Stone & Webster Engineering Corporation (SWEC) in December 1977, he has been assigned to the Engineering Assurance Division Procurement Control Procedures Group as an Engineer. Special assignments have included review of Beaver Valley Unit 2 ASME III Component Design Specifications for compliance to ASME III requirements; Member of the SWEC team at Clinton Power Station evaluating construction, quality assurance and engineering / design activities; Engineering Department Coordinator for engineering assurance and quality assurance matters for the Independent Design Review of Shoreham; Engineering Department Coordinator for NRC inspections of SWEC; the historical development of the Engineering Assurance Program as it specifically affects pipe stress / supports for Beaver Valley Unit 1; auditor for a Pipe Stress / Supports Reevaluation Task Force.

Prior to joining SWEC, Mr. Benecchi was a Senior Engineer with General Dynamics 1

Corporation Electric Boat Division. He gained broad design and procurement experience while involved with the development of the TRIDENT nuclear submarine.

PROFESSIONAL AFFILIATIONS I

i American Society for Quality Control - Member l Institute of Electrical and Electronics Engineers - Member

DETAILED EXPERIENCE RECORD BENECCHI, ALAN J. 05645 STONE & WEBSTER ENGINEERING CORPORATION, BOSTON, MA (Dec 1977 to Present)

Appointments:

Engineering Assurance Engineer - Feb 1980 -

Engineer - Dec 1977 Engineering Assurance Division Project Support Group (Dec 1979 to Present)

As ENGINEERING ASSURANCE ENGINEER, assigned to the Operations Services Division (OSD) Headquarters and Special Projects, responsible for:

Coordinating engineering assurance activities and services for OSD Headquarters and Special Projects.

Monitoring and evaluating OSD and project engineering and design activities and providing suggestions for problem resolution.

Assisting OSD and project personnel with proper interpretation of Engineering Department procedures, and assisting in the preparation of requests for deviations from Engineering Department procedurcs.

Ensuring that project activities and instructions are compatible with client and SWEC QA Programs for engineering and design activities.

Reviewing OSD and project procedures for compliance and consistency with Engineering Department, Corporate, and other industry or government standards.

Providing informal training, and scheduling formal training classes with Engineering Assurance Continuing Education Group.

Assisting in the preparation of responses to audit findings related to engineering and design activities.

Additional special assignments include:

Special review of Beaver Valley Unit 2 ASME III component design specifications to assess whether they comply with the requirements of ASME III.

Member of the SWEC evaluation team at Clinton Power Station. Specific responsibilities included:

o Coordination of SWEC engineering involvement in the Overinspection Program.

o Development of a design completion control program.

o Evaluation of site control of supplier documents.

1

.- - -. . . - - _ - , ~_ . ... ~_

l l

AJB 1

Engineering Department Coordinator for Engineering Assurance and Quality  ;

Assurance matters for the Independent Design Review of Shoreham by Teledyne Engineering Services.

An Engineering Department Coordinator for NRC inspections of SWEC.

1 Historical development .of the Engineering Assurance Program as it  :

specifically affects pipe stress and supports for Beaver Valley Unit 1 and Engineering bepartment Coordinator for an evaluation of the Beaver Valley Unit 1 design and analysis of piping by O'Donnell & Associates, Inc. for Duquesne Light Company.

Certified as Quality . Engineer by the American Society of Quality Control (December 1979).

Special Task Force for Pipe Stress / Supports Reevaluation (Mar 1979 - Dec 1979)

As ENGINEER assigned to the Special Task Force for Pipe Stress / Supports i Reevaluation for Beaver Valley Unit 1, Surry Units 1 and 2, James A. FitzPatrick, and Maine Yankee Power Stations; responsibilities included the following:-

Performing technical and programmatic audits of manual and computerized calculations generated during the Pipe Stress / Supports Reevaluation.

j Procedure development for controlling the quality of the engineering and design effort for the task.

Certified as Lead Auditor - Engineering Assurance Division (September 1979).

Engineering Assurance Division, Procurement Control Procedures Group i,.

(Dec 1977 - Mar 1979) i As DIVISION COORDINATOR (Apr 1978 - Mar 1979) for the Engineering Department

) Policies and "rocedures (EDPP) Program, responsible for:

i The coordination of Division activities for the preparation and development i of EDPPs.

l Assistance in scheduling work, assignment of manpower for EDPP preparation, and establishing priority levels for EDPP development.

Input to, review, and comment on EDPPs during and after preparation to ensure consistency with Quality Assurance requirements and Engineering Department goals and objectives.

j Preparation of EDPPs as required.

Participation in comment resolution meetings for EDPPs reviewed by Engineering Management.

I L

2 l

1 l

. AJB As ENGINEER (Dec 1977 - Apr 1978) under direction of the Supervisor, responsibilities included:

Preparation, review, and revision of Engineering Assurance Procedures and the Specification Preparation Manual.

Handling of project. and divisional requests for interpretation of a deviation from Engineering Assurance Procedures.

Study and implementation of SWEC Quality Assurance procedures and Code of Federal Regulations 10CFR50 Quality Assurance criteria.

Development of method for documcutation of comments and changes to NSSS supplier drawings and a method for changing subvendor drawings.

GENERAL DYNAMICS CORPORATION / ELECTRIC BOAT DIVISION, GROTON, CT (Mar 1971 - Oct 1977)

TRIDENT Design Project (Feb 1975 - Oct 1977)

As SENIOR ENGINEER, responsible for coordination and development of subvendor equipment. Included preparation of specifications and review of equipment test procedures and results to ensure conformance with specifications and delivery schedules.

is LEAD ENGINEER, responsible for installation and system interconnection of reactor plant equipment at the TRIDENT Training Facility in Bangor, Washington.

As COGNIZANT ENGINEER, responsible for development of both reactor plant and 4

secondary plant instrumentation, monitoring, and indication systems.

Responsible for review of reactor plant equipment specifications and functional requirements, system signal integration, and technical support to draf ting for preparation of final system interconnection drawings.

S5W and Commissioned Vessels Design Project (Nov 1971 - Feb 1975)

Appointed as nuclear PROJECT ENGINEER, responsible for updating reactor plant systems with new design modifications. Included development of system requirements and directions for modifying equipment.

l Member of the Electrical / Electronic Installations Cornittee. Responsible for establishing standards for installation of equipment onboard submarines.

Nuclear Test (Mar 1971 - Nov 1971)

Appointed as TEST ENGINEER (Mar 1971)

As TEST ENGINEER, responsible for testing reactor plant systems after completion of the construction phase.

3

_ _ - - . _