N s
EECENED
-nn l_
Southern California Edison Company g6 S AN ONOFRE NUCLE A R GENER ATING ST ATION j (
l P.c. sox tas
-T s AN CLEMENTE, C ALIFORNI A 92672 J. G. H A Y N E S January 18, 1984 gg y.< ", regrewome n A r io N. A. A...
in.,..,.,,..
_]
U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. J.
B.
Martin, Regional Administrator
Dear Sir:
E
Subject:
Docket Nos. 50-361 and 50-362 7
30-Day Report, Inoperable Fire Doors San Onofre Nuclear Generating Station, Units 2 and 3 g
Reference:
Letter, J. G. Haynes (SCE) to J. B. Martin (NRC),
7 dated December 15, 1983 2
In accordance with our referenced letter, this submittal provides the 30-day written report, pursuant to Technical Specification
.3 6.9.1.13.b, for fire-rated assemblies (specifically fire doors)
=
found inoperable during routine surveillances.
In addition, in the referenced report for November 1983, the number of doors
-E reported inoperable due to latching mechanism failures was incorrect.
Enclosed please find a corrected attachment.
7 Fire doors found inoperable during the December routine surveillances are identified in the Attachment and include:
-4 25 latching mechanism failures; 16 closu:e mechanicm failures; and 25 doors blocked open typically for construction, startup or maintenance activities.
As each of these deficiencies was identified, compensatory fire watches, pursuant to Technical Specification 3.7.9, Action Statement
'a', were established.
i As reported previously, Design Change Packages (DCP's) are being implamented to upgrade door latches and closure mechanisms into heavier duty hardware and to ensure a constant pressure e
differential across the access doors in the Radwaste and Control Buildings in order to reduce the door closure probicra.
The t
number of inoperable fire doors with these problems is decreasing u
4 as these DCP's are implemented.
As additional instances of door mechanical problems are identified which are not being dealt with by the DCPS's addressed herein, we are documenting these on Nonconformance Reports (NCR's) to assure systematic technical
[
evaluation and appropriate additional corrective action.
J 8402030420 840118
][ > L4)(
PDR ADOCK 05000301 S
\\\\
--. _ m m s w e r w ##. - e m. m. m....,
- - _.,__._ s _.4.,..
i.
Mr. J. B. Mortin January 18, 1984 Since implementation of the Fire Barrier Removal and Reinstallation Request (FBRRR) Procedare, effective December 8, 1983, the number of fire doors incorrectly blocked open has decreased, even with increased traffic due to the recent Unit 2 outage.
Additional training on implementation of the FBRRR Procedure will be provided to appropriate Station personnel.
As long term corrective action, the installation of utility penetrations adjacent to the doors for the routing of temporary cables, conduits and/or hoses to avoid blocking open the fire doors is under consideration.
This monthly follow-up report and those sent previously provide updated information associated with an ongoing condition initially reported in 1983.
Accordingly, we will continue these follow-up reports identifying door status and corrective actions in lieu of providing notification and reports associated with the revised 10 CFR 50.72 and-50.73.
The report covering inoperable doors
. identified in January 1984 will be submitted on February 22, 3
~1984.
If you require any additional information, please so advise.
Sincerely, Sy%
Attachment cc:
A. E. Chaffee (USNRC Resident Inspector, Units 1, 2 and 3)
J. P. Stewart (USNRC Resident Inspector, Units 2 and 3)
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement U. S.
Nuclear Regulatory Commission Division of Technical Information and Document Control Institute of Nuclear Power Operations (INPO) r
ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY INOPERABLE FIRE DOORS FOR THE MONTH OF DECEMBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 I.
Latching Mechanism Failures:
Number of doors failing - 25, as follows:
Door Number
--Inoperable Operable AR-104 12/12 Work Pending AC-106 12/14 Work Pending AC-lll 12/14 12/20 AC-113 12/01 12/27 AC-115 12/08 Work Pending C2-201 12/01 12/12 12/13 12/19 AR-203 12/01 12/04 12/08 Work Pending AC-233 12/04 12/08 AC-306 12/03 12/10 AR-314 12/20 12/21 AR-318 12/01 12/04 1
12/05 12/08 12/12 12/20 AC-331 12/13 12/15 12/16 12/19 12/20 12/21 12/24 Work Pending AC-337 12/03 12/17 AC-338 12/15 12/19 12/21 Work Pending AC-340 12/07 12/08 AC-344 12/07 12/16 12/20 12/31 AC-349 12/04 12/07 12/08 12/10 12/12 Work Pending AC-351 12/09 12/15 C2-403 12/01 Work Fending C3-403 12/05 12/17 12/12 12/19 12/20 Work Pending FH3-403 12/01 Work Pending AC-415 12/01 12/03 12/04 Work Pending A2-501 12/01 12/13 12/28 Work Pending AR-504 12/01 12/09 12/10 12/16 12/17 Work Pending AR-510 12/04 12/07 12/08 12/15 12/29 Work Pending
m..._._._.
ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY INOPERABLE FIRE DOORS FOR THE !!ONTH OF DECEMBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued)
II.
Closure Mechanism Failures:
Number _of' doors failing - 16, as follows:
Door Number Inoperable Operable
^
-FH2-101 12/04 Work Pending AC-117 12/01 12/04
'DG2-204 12/05 12/07 12/21 12/22 12/28 Work Pending FH2-302 12/01 12/08 12/09 12/12 12/13 12/19 12/21 12/23 12/28 Work Pending AC-303 12/01 12/04 FH2-303 12/01 12/05 12/28 Work Pending AC-310 12/23 Work Pending AC-328 12/03 12/10 AC-338 12/04 12/05 12/09 12/12 AC-343 12/04 12/05 12/10 12/16 12/20 Work Pending AC-345 12/04 12/05 12/09 12/10 12/13 12/15 12/23 Work Pending AC-348 12/09 12/15 12/20 Work Pending AC-351 12/04 12/05 12/20 Work Pending C2-401 12/08 12/09 FH2-403 12/12 12/15 12/21-12/29 12/30 Work Pending AR-405 12/28 Work Pending a a.,.,~x c.~, -
. ~.. -. :. ;.... ~. -,,,
It
, e ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY INOPERABLE FIRE DOORS FOR THE MONTH OF DECEMBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET-NOS. 50-361 and 50-362 (Continued)
III.
Doors Blocked Open:
Number of doors failing - 25, as follows:
Door Number Inoperable Operable AR-101 12/31 Work in Progress AR-104 12/16 12/24 AC-105 12/04 12/12 AC-106 12/29 Work in Progresss AC-107 12/29 12/30 AC-111 12/07 12/08 AC-ll2 12/29 12/30 AC-113 12/24 12/27 AC-115 12/01 12/04 12/10 12/12 AC-ll6 12/01 12/08 AC-124 12/07 12/09 AC-125 12/01 Work in Progress AC-127 12/07 12/08 DG3-206 12/01 12/04 AC-236 12/01 12/04 AC-259 12/01 Work in Progress AC-260 12/01 Work in Progress FH2-302 12/08 12/09 AC-306 12/03 12/10 AC-314 12/10 12/17 AC-315 12/03 12/10 AC-442 12/01 Work in Progress AC-445 12/17 12/31 l
AR-501 12/12 12/20 12/21 12/27 i
12/29 12/30 AR-504 12/09 12/10 1833u..
-. -mm..
..------.-------,-..rz--
ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY INOPERABLE FIRE DOORS FOR THE MONTH OF NOVEMBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 I.
Latching Mechanism Failures, Rev. 1:
Number of doors failing - 28, as follows:
Door Number Inoperable Operable AR-104 11/01 11/05 11/06 11/14 11/24 11/27 AC-105 11/01 11/09 11/14 11/17 AC-106 11/01 Work Pending AC-111 11/06 11/09 11/08 11/11 11/14 11/17 11/18 11/21 AC-ll3 11/07 11/26 11/29 11/30 AC-116 11/06 11/11 11/14 11/21 AC-121 11/02 11/08 11/09 11/11 11/15 11/17 11/19 11/21 11/26 11/21 AC-122 11/07 11/08 11/19 11/21 AC-129 11/01 11/11 C2-201 11/21 11/30 AR-203 11/01 11/26 AC-233 11/19 11/21 AC-301 11/01 11/02 AC-303 11/26 11/27 AC-304 11/16 11/18 11/21 11/27 AC-309 11/02 11/04 11/07 11/10 AC-310 11/07 11/08 11/30 Work Pending AC-316 11/07 11/08 11/25 11/27 AC-331 11/19 11/26 AC-339 11/07 11/08 11/30 Work Pending AC-347 11/19 11/22 AC-349 11/18 11/29 AC-351 11/16 11/17 11/29 Work Pending C2-403 11/21 11/25 11/28 Work Pending FH2-403 11/15 11/17 AC-415 11/18 Work Pending AR-501 11/01 Work Pending AR-504 11/01 Work Pending J