Interim Deficiency Rept DER 83-66 Re Motor Driven Auxiliary Feedwater Pump Internal Problems.Initially Reported on 831011.Due to Extensive Investigation & Evaluation,Final Rept Will Not Be Submitted Until 840329
ML20079S385
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/13/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28615-BSK, DER-83-66, NUDOCS 8402030318
Download: ML20079S385 (2)


Text

-

k EECEWED Imc Arizona Public Service Company Qgg P.O. BOX 21666

  • PHOENIX, ARIZONA 85036 REGanymn Janaury 13, 1984 ANPP-28615-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident ~

Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-66 A 50.55(e) Potentially Reportable Deficiency Relating To Internal Problems In Unit 1 Motor Driven Auxiliary Feedwater Pump.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on October 11, 1983 (B) ANPP-28199 dated, November 8,1983 (Interim Report)

Dear Sir:

a The NRC was notified of a potentially reportabic deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by January 20, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 29, 1984, at I

which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, Q

/\\ L L E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: See Page Two 840203031Bj4M329 ppR ADOCK PDR 1

U

) O ff-J 7 1.

44'-

Mr. T.;W. Bishop DER 83-66 Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods,. Jr.

'J. A. Roedel-D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D._Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 t

Atlanta, GA 30339 I

l l

l l

P l

.