Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML17309A6211997-09-29029 September 1997 Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML20036A7091993-05-0303 May 1993 Part 21 Rept Re Three Tufline Plug Valves Discovered W/ Fractured Bolts.Caused by Stress Corrosion Cracking of Valve Cover Bolts.Cover Bolts Replaced W/Sa 564 Type 630 Condition H1150 Matl.Ltr Sent to Customers Encl ML20035E4861993-04-0707 April 1993 Part 21 Rept Re K-400 Circuit Breaker Failed to Meet Certain Rating Requirements Based on ANSI C37.16.Licensees Scheduled Tests on Modified Arc Chutes in Several Different Modes at KEMA-Powertest Lab in Chalfont,Pa ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML13316A0821991-11-15015 November 1991 Part 21 Rept Re Incorrect transmitter-to-bracket Mounting Socket Cap Screws.Cap Screws May Fail Under Seismic Dynamic Tensile & Shear Loads.Ltr Sent to Customers Encl. Weed Instrument Co Notified on 911108 ML13316A0801991-11-12012 November 1991 Part 21 Rept Re Possible Defect in Pressure Transmitter Mounting Brackets Used in Foxboro-type Pressure Transmitters.Caused by Receipt of Wrong Part Number Bolts from Foxboro.Weed Instrument Co,Inc & Foxboro Ltrs Encl ML20081F6091991-04-23023 April 1991 Part 21 Rept Re Edward Controlled Closure Check Valves & Testable Piston Check Valves Dashplate Bolt Failures Due to Rapid Valve Opening or Impulsive Differential Pressure Surge Across Dashplate.Design Changes Recommended ML20246C0881989-06-21021 June 1989 Potential Significant Deficiency Rept Re Possibility That Atmospheric Dump Valves May Fail to Open.Caused by High Bonnet Pressure Not Permitting Actuator to Open Valve.Plug Should Be Reworked to Enlarge Pilot Flow Area ML20246K7401989-04-26026 April 1989 Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves ML20204H1481988-10-14014 October 1988 Final Deficiencty Rept CDR 84-00-13 Re Portions of Control Circuits Not Considered When Evaluating Total Circuit Length for Voltage Drop Calculations.Initially Reported on 840830. Independent Review Confirms Corrective Actions Completed ML20235Y2901987-10-0909 October 1987 Part 21 Rept Re Potential Hazard That Magnet in Class J Industrial Control Relays May Jam When Called to de-energize & Control Circuits May Not Open.Special 120-volt Coil Removed & New Relay Installed ML20214A1361987-05-12012 May 1987 Part 21 Rept Re Capacity of Thermal Compensating Accumulator Being Insufficient to Compensate for Thermal Expansions of Hydraulic Fluid During Full Ambient Temp Transient Required by Customer Specs.Interim & Permanent Mods Identified ML20211P7211987-02-23023 February 1987 Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly ML20207J2111986-11-26026 November 1986 Final Deficiency Rept CDR-86-00-09 Re Ambient Temp Compensation Calibr Shifts in Veritrak Group a Transmitters. Initially Reported on 860912.Existing Transmitters Will Be Replaced W/Rosemount Transmitters ML20214R8981986-09-18018 September 1986 Supplemental Final Deficiency Rept CDR 85-00-13 Re Lining Defects in Svc Water Sys.Piping Spool Insp Will Be Performed Immediately Due to Exceeding Originally Anticipated Insp Interval ML20210F4741986-09-16016 September 1986 Part 21 Rept Re Possible Sticking in Closed or Partially Open Position on Dresser 3050 Diaphragm Valves.Initially Reported on 850118.Disc Caps,Including Chamfers on Outside Diameter,Will Be Modified ML20214Q8661986-09-16016 September 1986 Final Deficiency Rept CDR 85-00-20 Re Failure of Fire Damper to Close Under Design Airflow Conditions.Initially Reported on 851206.Calculations to Determine Which Fire Dampers Could Fail Under Dynamic Flow Conditions Taken ML20210F4081986-09-12012 September 1986 Interim Deficiency Rept (CDR 86-00-09) Re Excessive Calibr in Veritrak/Tobar Transmitters.Initially Reported on 860805. Destructive Exam Testing Underway.Nrc Will Be Informed of Status Upon Completion of Tests ML20214M3181986-09-0404 September 1986 Potential Part 21 Rept Re Contromatics Actuator W/Jackscrew/ Handwheel Emergency Override Operator.Jackscrew/Handwheel Should Be Used for Emergency Manual Operation Only.Encl Ltr Also Sent to Listed Utils/Ae Firms ML20206U1481986-08-21021 August 1986 Final Deficiency Rept (CDR 81-00-10) Re Inconsistency in Electrical Cable Tray Support Bolts Design.Initially Reported on 810727.Required Mods to Conduit & Cable Tray Support Connections Installed & Inspected ML20203M0271986-08-14014 August 1986 Final Deficiency Rept (CDR 86-00-08) Re Failure to Ensure Adequate Torquing of Cable Tray hold-down Clamps.Initially Reported on 860716.Clamps Retorqued & Installation & Insp Criteria Revised ML20212N0651986-07-25025 July 1986 Final Deficiency Rept CDR 84-00-06 Re Components & Component Supports Spanning Expansion Joints.Initially Reported on 840405.Field Walkdown of All Bldgs Performed & Design Changes Issued to Assure Sys & Structure Integrity ML20212C7501986-07-18018 July 1986 Interim Deficiency Rept CDR 86-00-08 Re Cable Tray Hold Down Clamps.Initially Reported on 860716.Program to Retorque All Cable Tray Hold Down Clamps in safety-related Areas Implemented.Next Rept by 860815 ML20204J3131986-07-18018 July 1986 Final Deficiency Rept (CDR-86-00-07) Re Valve Alignment of ECCS During Cold Leg Recirculation Phase of post-LOCA ECCS Operation.Initially Reported on 860606.Low Head Safety Injection Sys Valve Alignment Will Be Used & FSAR Updated ML20206S0841986-06-30030 June 1986 Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires ML20205B3931986-06-30030 June 1986 Final Deficiency Rept CDR-86-00-02 Re Ambient Temp Drift Problem W/Veritrak Pressurizer Pressure Transmitters. Initially Reported on 860307.Tobar Pressurizer Pressure Transmitters Installed ML20212D5191986-06-24024 June 1986 Final Deficiency Rept CDR 86-00-06 Re Westinghouse W-24 Operational Amplifiers.Initially Reported on 860605. Westinghouse Nal Cards Having W-24 Operational Amplifiers W/Dated Code 8101 Replaced ML20211Q2731986-06-16016 June 1986 Final Deficiency Rept CDR 84-00-17 Re Insufficient Fillet Weld Size in Coped Area of Structural Steel I-beams Supplied by Cives Steel.Initially Reported on 841026.Mods Issued & Completed to Ensure Integrity of Structural Member ML20207H4771986-06-13013 June 1986 Final Deficiency Rept CDR-79-00-04 Re Potential Undetectable Failure in P-4 Interlock Circuit of Esfas.Installation of Test Switches & Meters as Recommended by Westinghouse & Procedures for Performing Periodic Testing Completed ML20207H4991986-06-10010 June 1986 Final Deficiency Rept CDR-85-00-18 Re Possible Malfunction of Figure 3050 Diaphragm Valves Supplied by Dresser Industries.Initially Reported on 851023.Caused by Valve Disc Cap Not Allowing Disc to Move.Mods to Disc Guides Complete ML20211H4071986-06-0606 June 1986 Final Deficiency Rept (CDR 85-00-07) Re HVAC Design Defect. Initially Reported on 850409.Fifteen-ton Chiller Unit Added in Equipment Vault Stairways & Electrical Area Above ML20206F0741986-06-0606 June 1986 Final Deficiency Rept (CDR 86-00-03) Re Potential Malfunction of P-10 Permissive.Initially Reported on 860324. Verification That P-10 Permissive Properly Changes State Will Be Made by Observing Bistable Status Lights ML20211H3981986-06-0606 June 1986 Final Deficiency Rept (CDR 85-00-16) Re Gauled Threads on Manual Handwheel Operators on safety-related Dampers Causing Operator & Damper to Seize.Initially Reported on 851017.Mods Recommended by Pacific Air Products Completed ML20211H3841986-06-0505 June 1986 Final Deficiency Rept (CDR 83-00-14) Re Supports for Svc Air Sys & Other Sys Carring non-nuclear Safety Designation. Initially Reported on 830714.Affected Lines Reviewed to Determine If Supports Should Be non-nuclear Seismic (NNS-1) ML20199F5041986-06-0505 June 1986 Interim Deficiency Rept (CDR 86-00-06) Re Excessive Shift of Calibr Trip Setpoints on Westinghouse W-24 Operational Amplifiers.Initially Reported on 860501.Amplifiers Will Be Replaced ML20206F0771986-06-0303 June 1986 Final Deficiency Rept (CDR 86-00-04) Re Potential Malfunction in 25 Kva Inverters Mfg by Elgar Corp Due to Improper Stacking of Cable Lugs.Initially Reported on 860509.Actions Complete for Unit 1 ML20206B8701986-05-28028 May 1986 Final Deficiency Rept (CDR 84-00-13) Re Control Circuit Cable Lengths.Corrective Actions as Specified in Completed.Solutions Involved Rewiring W/Larger Conductors & Reconfiguration of Some Circuits ML20206B7291986-05-28028 May 1986 Final Deficiency & Part 21 Rept (CDR 85-00-17) Re Potential for Gould-supplied Motor Control Starters to Bind or Seize Contact Carrier Assembly.Reinsp Conducted to Ensure That Washers Installed Under Contact Carrier ML20206B8371986-05-20020 May 1986 Final Deficiency Rept (CDR 85-00-04) Re Blocked Air Hose in Vent Lines from safety-related air-operated Actuators. Initially Reported on 850301.Unit 1 Air Hoses Replaced.Unit 2 Hoses Not Yet Installed ML20198N1641986-05-20020 May 1986 Final Deficiency Rept CDR 84-00-05 Re Overstressed Welds That Join Expansion Joint Assemblies to Fuel Transfer Tube. Initially Reported on 840427.Welds Reworked Per ASME III, Code Class 2 Criteria ML20198P3501986-05-20020 May 1986 Final Deficiency Rept CDR 84-00-08 Re Weld Deficiencies on Fisher Controls Valve Operator Bracket Welds.Initially Reported on 840419.Corrective Actions,Including Insp & Repair of Brackets,Completed ML20205R8571986-05-10010 May 1986 Final Deficiency Rept Re Emergency Feedwater Sys Design Flow Requirements.Initially Reported on 860425.Emergency Feedwater Pump Constant Flow Recirculation Line Replaced W/ New Safety Class 3 Recirculation Line for Each Pump ML20215M7181986-05-0909 May 1986 Interim Deficiency Rept (CDR 86-00-04) Re Improper Cable Lug Connections in 25 Kva Inverter.Initially Reported on 860401. Cable Lugs for Dc & Ac Power Supply Connections Will Be Determinated & Properly Reterminated ML20206C2671986-05-0707 May 1986 Interim Deficiency Rept (CDR 86-00-03) Re Potential Malfunction of Reactor Protection Sys Permissive P-10 Function Under Stated Circumstances.Initially Reported on 860324.Corrective Action in Incorporated ML20141H9791986-04-10010 April 1986 Interim Deficiency Rept (CDR 86-00-02) Re Veritrak 76PH2 Pressure Transmitters Calibr Shifts.Initially Reported on 860307.Addl Rept Will Follow Upon Completion of Westinghouse Analysis ML20141E4311986-04-10010 April 1986 Final Deficiency Rept (CRD-85-00-13) Re Failure of Svc Water Sys Spool Linings,Piping Inserts & Valve Liner/Seats. Initially Reported on 850918.At Least One Piping Spool Will Be Removed for Insp of Coating During Each Outage ML20155F3181986-04-0202 April 1986 Final Deficiency Rept (CRD 85-00-11) Re Incorrect Short Time Delay Band Levers on Brown Boveri K-line Circuit Breaker W/ Overcurrent Trip Device.Initially Reported on 850731.Unit 1 Corrective Action Complete.Unit 2 Being Tracked ML20199G4561986-03-31031 March 1986 Interim Deficiency Rept (CDR 85-00-17) Re Binding of Contact Carrier Assembly in Gould Motor Control Starters.Initially Reported on 851118.Affected Starters Will Be Replaced or Modified 1997-09-29
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000443/LER-1999-002, :on 990921,determined That TS 3.8.1.1 Actions Were Not Met.Caused by Personnel Error.Requirements of TS 3.8.1.1.b Were Subsequently Met by Completion of Test Required by TS 4.8.1.1.1a.With1999-10-21021 October 1999
- on 990921,determined That TS 3.8.1.1 Actions Were Not Met.Caused by Personnel Error.Requirements of TS 3.8.1.1.b Were Subsequently Met by Completion of Test Required by TS 4.8.1.1.1a.With
ML20217C8491999-10-0505 October 1999 Safety Evaluation Supporting Amend 64 to License NPF-86 ML20212L1231999-10-0101 October 1999 Safety Evaluation Supporting Amend 63 to License NPF-86 ML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D0841999-09-17017 September 1999 Safety Evaluation Supporting Amend 62 to License NPF-86 ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q1731999-08-12012 August 1999 Safety Evaluation Supporting Amend 61 to License NPF-86 ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20204E3461999-03-12012 March 1999 Safety Evaluation Supporting Amend 60 to License NPF-86 ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20202C2851999-01-21021 January 1999 Safety Evaluation Supporting Amend 59 to License NPF-86 05000443/LER-1998-014-01, :on 981222,on Automatic Reactor Trip Occurred While at 100 Percent Power.Caused by Auxiliary Switch Linkage Pin in Breaker 163,fell Out Preventing Linkage from Actuating Auxiliary Contact.Breaker 163 Switch Reinstalled1999-01-18018 January 1999
- on 981222,on Automatic Reactor Trip Occurred While at 100 Percent Power.Caused by Auxiliary Switch Linkage Pin in Breaker 163,fell Out Preventing Linkage from Actuating Auxiliary Contact.Breaker 163 Switch Reinstalled
ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With 05000443/LER-1998-011, :on 981120,inoperable Containment Penetration Overcurrent Protective Devices Were Noted.Caused by Inadequate Preparation & Review of Design Change.Class 1E Fuses Have Been Installed.With1998-12-21021 December 1998
- on 981120,inoperable Containment Penetration Overcurrent Protective Devices Were Noted.Caused by Inadequate Preparation & Review of Design Change.Class 1E Fuses Have Been Installed.With
05000443/LER-1998-012, :on 981120,unanticipated Isolation of FWIVs Occurred.Caused by Personnel Error.Separate Individual Was Assigned in CR to Perform Oversight Duties During Latest Plant Heatup & Power Ascension.With1998-12-21021 December 1998
- on 981120,unanticipated Isolation of FWIVs Occurred.Caused by Personnel Error.Separate Individual Was Assigned in CR to Perform Oversight Duties During Latest Plant Heatup & Power Ascension.With
05000443/LER-1998-010, :on 981113,plant Placed in Cold Shutdown Condition Due to Degraded Generator step-up Transformer Connection.Visual Insp of Damaged Transformer Connections Performed to Determine Cause of Event.With1998-12-14014 December 1998
- on 981113,plant Placed in Cold Shutdown Condition Due to Degraded Generator step-up Transformer Connection.Visual Insp of Damaged Transformer Connections Performed to Determine Cause of Event.With
ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With 05000443/LER-1998-009, :on 980915,noted Incomplete Digital Channel Operation Tests (Dcots) for CR & Containment on-line Purge (COP) Rms.Caused by Development of Incomplete Sps.Revised COP Dcot Sps to Check Isolation Relays.With1998-10-15015 October 1998
- on 980915,noted Incomplete Digital Channel Operation Tests (Dcots) for CR & Containment on-line Purge (COP) Rms.Caused by Development of Incomplete Sps.Revised COP Dcot Sps to Check Isolation Relays.With
ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station 05000443/LER-1998-007, :on 980619,inoperable PORV Channel Calibration Was Noted.Caused by Procedural Technical Inaccuracies.Porv Channel Calibration Surveillance Test Were Changed & Retested for Issues Identified on 9806191998-07-17017 July 1998
- on 980619,inoperable PORV Channel Calibration Was Noted.Caused by Procedural Technical Inaccuracies.Porv Channel Calibration Surveillance Test Were Changed & Retested for Issues Identified on 980619
05000443/LER-1998-006, :on 980611,plant Was Shutdown Due to Inoperability of Control Room Air Conditioning Subsystem. Caused by Inadequate Design of Subsystem.Assembled Task Force to Review History of Subsystem & Incorporated Mods1998-07-10010 July 1998
- on 980611,plant Was Shutdown Due to Inoperability of Control Room Air Conditioning Subsystem. Caused by Inadequate Design of Subsystem.Assembled Task Force to Review History of Subsystem & Incorporated Mods
ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20249C6421998-06-24024 June 1998 Safety Evaluation Supporting Amend 58 to License NPF-86 ML20249B0601998-06-16016 June 1998 Safety Evaluation Supporting Amend 57 to License NPF-86 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 05000443/LER-1998-005, :on 980501,inoperability of SG Steam Line Pressure Protection Channels Was Noted.Caused by Procedural Deficiencies.Revised Procedures to Ensure Correct & Consistent Interpretation of Record Traces1998-05-29029 May 1998
- on 980501,inoperability of SG Steam Line Pressure Protection Channels Was Noted.Caused by Procedural Deficiencies.Revised Procedures to Ensure Correct & Consistent Interpretation of Record Traces
1999-09-30
[Table view] |
Text
4
.r c PUEBLIC SERVICE SEA M M STA N
- .w A omc Ccmnpanyof New Hempehere 1671 Worcester Rood Fromingham, Massachusetts 01701 (617) - 872 - 8100 Jar.uary 4, 1984 SBN-606 T.F. Q2.2.2 United States Nuclear Regulatory Commission Region I 631 Park Avenue 7.ing of Prussia, PA 19406 Attention:
Mr. Richard W. Starostecki, Director Division of Project and Resident Programs
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) Telecen of February. 16, 1983, A. L. Legendre (YAEC) to J. Wiggins (NRC, Region I)
(c) PSNH Letter, dated March 18,1983, " Interim 10CFR50.35(e)
Report; Westinghouse 7300 Series Process I&C System Cabinets", J. DeVincentis to R. W. Starostecki (d) PSNH Letter, dated May 20, 1983, " Interim 10CFR50.55(e)
Report; Westinghouse 7300 Series Process 1&C System Cabinets", J. DeVincentis to R. W. Starostecki (e) Telecon of June 17, 1983, A. L. Legendre (YAEC) to Eugene Kelly (NRC, Region I)
(f) Westinghouse Letter, dated June 1,1983, E. P. Rahe to R. C. DeYoung j
(g) PSNH Letter, dated July 1,1983, J. DeVincentis to l
R. W. Starostecki
Subject:
Interim 10CFR50.55(e) Report; Vestinghouse 7300 Process Protection System NLP Card Heat Sinks and NTC Card Relays
Dear Sir:
We have further reviewed the two 10CFR50.55(e) deficiencies af fecting the Westinghouse 7300 Series Process Protection System and have determined these i
to be reportable.
Reference (g) describes the deficiencies in detail. The following
(
corrective actions will be taken.
l 8402030305 840104 PDR ADOCK C5000443 d
S PDR A/
fO
~<
. United' States Nuclear Regulatory Commission January 4, 1984 Attention:
R. W. Starostecki, Director Pagc 2 1.
Heat Sinks
-All affected heat sinks will be replaced with a new style heat sink which will correct the problem. The new style heat sink is secured to the printed circuit board using screws and shoulder washers.
This will replace the present method _of securing the heat sink to the printed circuit board by relying on an adhesive bond.
2.
. Mercury Relays A replacement relay is being developed and tested by Westinghouse.
These replacement relays will be installed in all NTC cards at Seabrook subsequent to development and testings.
We'will continue to follow both of these items and notify you when the replacement is complete.
Very truly yours, YANKEE TOMIC ELECTRIC C011PANY Os J. DeVincentis Project Manager cc: Atomic Safety and Licensing Board Service List Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 r
7:; -
~
l
. a:.%
iWilliam S." Jordan,-III, Esquire Brentwood Board of Selectmen
.Harmon 4 Weiss ~
RED Dalton Road 1725 I Street, N.W. Suite-506
- Brentwood, New Hampshire.03833
- Washington;
- DC-20006
.Roy-P. Lessy,~Jr., Esquire.
Office'of the Executive-Legal Director Edward F. Meany JU.S._ Nuclear,hegulatory Commission.
Designated Representative of Washington, DC 20555.
the Town of Rye 155 Washington Road Robert.A. Backus, Esquire LRye, NH 03870' 116 Lowell~ Street P.O. Box 516 Calvin A. Canney Mancehster, NH 03105 City Manager.
City Hall-Philip Ahrens,.. Esquire 126 Daniel Street
.' Assistant Attorney General
'Portsmocth, NH 03801
- Department-of the Attorney General Augusta, ME 04333' Dana Bisbee, Esquire Assistant Attorney General
. Designated Representative-of
~ Office of the Attorney General Mr. John B. Tanzer 208 State House Annex the; Town of Hampton.
Concord, NH 03842 T5 Morningside Drive Hampton,:NH 03842 Anne Verge, Chairperson
. Board of Selectmen Roberta C. Pevear Town Hall Designated Representative of-South Hampton, NH 03842 the Town of Hampton Falls Drinkwater Road -
Patrick J. McKeon
'Hampton Falls, NH 038441 Selectmen's Office 10 Central' Road Mrs.. Sandra Cavutis Rye, NH 03870 s Designated Representative of'
'the' Town of Kensington Carole F. Kagan, Esq.
RFD 1
. Atomic Safety and Licensing Board Panel East Kingston, NH 03827 U.S. Nuclear Regulatory Commission Jo Ann Shotwell, Esquire Assistant: Attorney General Mr. Angie Machiros
. Environmental Protection Bureau Chairman of the Board of Selectmen Department of the Attorney General Town of Newbury
'One A9hburton Place, 19th Floor Newbury, MA 01950 Boston, MA'02108 Town Manager's Office Senator-Gordon J. Humphrey Town Hall - Friend Street
- U.S. Senate Amesbury, Ma.
01913 Washington, DC 20510 (Attn: Tom Burack)
Senator Gordon J. Humphrey 1 Pillsbury Street Diana P. Randall Concord, NH 03301 70 Collins Street SEabrook, 121 03874
. (Attn: Herb Boynton)
Richard E. Sullivan, Mayor Donald E. Chick City Hall l
Town Manager Newburyport, MA 01950 l.
Town of Exeter l
10 Front Street Exeter, NH 03833 I '.
i
'L.