RECEIVED tmc Arizona Public Service Company PHOENIX, ARIZONA 85036 g P.O. Box 21666 e January 12, 1934 ANPP-28608-BS1t7EES V Z
-U. S. Nuclear Regulatory Commission Region V Creekside-Oaks Office Park 1450 Maria Lane - Suite 210 Wa hut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 82-76 A 50.55(e) Potentially Reportable Deficiency Relating To Target Rock Valves Do Not Meet Specification / Test Requirements.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and G. Duckworth
.on November 24, 1982 (B) ANPP-22590, dated December 23, 1982 (Interim Report)
(C) ANPP-23223, dated March 10, 1983 (Time Extension)
(D) ANPP-23641, dated May 3, 1983 (Time Extension)
-(E) ANPP-27523, dated August 5, 1983 (Time Extension)
(F) ANPP-28247, dated November 17, 1983 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and
. Time Extensions were requested in References (C), (D), (E), and (F). At that. time, it was estimated that a Final Report would be available by L
January 18, 1984 DuetotheextensiveinvestigatSonandevaluationrequired,itisnow expected that this information will be finalized by February 23, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, e
GC 8402030302 840112 DR ADOCK 05000 E. E. Van Brunt, Jr.
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:ru cc: See Page Two Y
l 0 j
f-'.
.k.
- ,4
.,7
~
- p
.Mr.'T. W. Bishop
" DER 82-76 Page Two ec:.
_ Richard DeYoung,-Director Office of Inspection'and Enforcement-U. S. - Nuclear Regulatory Commission
. Washington, D. C. 20555 T. G. Wo od s,. Jr.
J.-A. Roedel
~
-D. B. Fasnacht A. C. Rogers B. S.-Kaplan W. E. Ide J. Vorees J. R.fBynum D. D. Green
.P. P. Klute A. C.~Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. Foster D. R. llawkinson L. E. Vorderbrueggen
-G. A. Fiorelli S. R. Frost i
J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l-t' i
.-