ML20079S311

From kanterella
Jump to navigation Jump to search
RO 370/83-90:on 831223,onsite Power Distribution Requirements Not Met.Investigation of Incident & Preparation of Rept Incomplete.Rept Will Be Submitted by 840203
ML20079S311
Person / Time
Site: Mcguire
Issue date: 01/20/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-370-83-90, NUDOCS 8402030287
Download: ML20079S311 (1)


Text

- -

_..g . . .. . . . ..

3 I

e .

)

- ,a pe N. . .

5 ', DUKE POWER Goxrwxy P.O. DOx 33180 CIIARLOTTE, N.O. 28242 HALB. TUCKER t TELEPHONE

==

g , , g Jg@ drh 20, 1984 (704) o7xmi Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II

-101 -Marietta Street NW,' Suite 2900 Atlanta, Georgia 30303

Subject:

McGuire Nuclear Station Unit 2 Docket No. 50-370 LER/RO-370/83-90

Dear Mr. O'Reilly:

Reportable Occurrence Report R0-370/83-90 was to have been submitted by January 20, 1984. This 30 day Reportable Occurrence (pursuant to T.S. 6.9.1.11) concerns oa ite power distribution (T.S. 3.8.3.1) requirements which were not met on December 23, 1983. At this tiue investigation of the incident and preparation

-of the report are not-yet complete. The report will be submitted by February  ;

3.-1984. l

'Very truly yours,

'fB. 6d /d/

Hal B. Tucker l PBN:jfw cc: Document Control Desk Mr. W. T. Orders U. S. Nuclear Regulatory Commission NRC Resident Inspector Washington, D. C. 20555 McGuire Nuclear Station Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339' OFFICIAL COPY

[ddl I 8402030287 840120 /0 PDR ADOCK 05000370 PM g