Interim Deficiency Rept DER 83-61 Re Low Pressure Safety Injection Pump Failure to Start & to Produce Required Head. Initially Reported on 830914.Due to Extensive Investigation, Final Rept Will Be Delayed Until 840223
ML20079S047
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/16/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28627-BSK, DER-83-61, NUDOCS 8402030176
Download: ML20079S047 (2)


Text

1

~

f,ECEIVED SC Arizona Public Service Company P O BOX 21666 + PHOENIX. ARIZONA 85036 ,

January 16,198[

ANPP-28627-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Recident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-61 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 LPSI Punps Failed to Start and Do Not Produce the Required Head.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Johnson and R. Tucker on September 14, 1983.

(B) ANPP-28001 dated, October 13,1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by January 26, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 23, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly ours l CLtt ALLC (

E. E. Van Brunt., Jr.

APS Vice President, Nuclear AhTP Project Director EEVB/TRB:db j

cc: See Page Two l

8402030176 840116 l PDR ADOCK 05000528 S PDR

~7/- J 7 3l O L_

__ . m _ . _ - ..__ _ _

e.

. * $* , t Mr. T. W. Bishop-DER 83 -

Page Two ec: Richard DeYoung, Directar Office of Inspection and Enforcement U.'S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J.-A. Roedel D. B. Fasnacht A. C. Rogers

'B. S. Kaplan W. E. Ide '

J. Vorees J. R. Bynum

.; . P. P. Klute A. C. Gehr W. J. Stubblefield-W. G. Bingham R. L. Patterson R. W. Welcher H. Foster D. R. Hawkinson L. E. Vorderbrueggen i

G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center l Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 i

4

__.,_,.-_ _ __.__ _ _._.._ _ __ _ _ _ _