Requests Thorough Investigation of Worker Allegations About Safety,Poor Quality,Intimidation & Falsification of Records. Investigation Should Be Completed Prior to Allowing Low Power Operation
ML20079Q612
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/19/1984
From: Mccorquodale D
CALIFORNIA, STATE OF
To: Palladino N
NRC COMMISSION (OCM)
References
NUDOCS 8402010262
Download: ML20079Q612 (1)


Text

_ _ _ _ _

___y__

R M4 2

/

LL AL VERNMENT.

j SAC 9tAMENTA CA 9841S g,$.eip g,"

CON ?TITUTIONAL AMENDMEM W

VICE-CHAIN 1 Id 44b*104

g%F

"'m&MRL-o

= g y g ::

DEVELOPMENTAL DISASILfTIES.

,=:=:==,

o -

=E :,

A-

$ enate

.m._mm as..m..

m==,.e -

~

,-,A.

NATURAL RESC4JnCES AND WILDLIFE GL Cf u

  • q Galifornia TEcgislature BMnl@? Q::*

I

?

January 19, 1984 DAN McCORQUODALE j

SERVED JAN Si 1984 5'"^'

rwears Disimcr Chairman Nunzio Palladino

'300. #, UTIL FAC. 5. 0....2...',7.5 323 DC0KET NUf'.BER U.

S. Nuclear Regulatory Commission Washington, D.C.

20555 i-t-w

Dear Chairman Palladino:

The history of the Diablo Canyon Nuclear Power Plant is truly remarkable.

Time after time, the same cycle of events is repeated.

First, significant flaws in design and execution are discovered.

These are analyzed and corrected, and a statement issued that now, at last, everything is under control.

But then, it seems, the cycle repeats.

New defects are found, analyzed and corrected, and so on, ad infinitum.

This pattern has produced widespread concern and skepticism about Diablo.

Most recently, scores of new allegations about safety and poor quality have been made by workers at the site.

Some of these employees have even lodged accusations of intimidation, falsification of records and other grave violations of federal law.

Therefore, it would appear that public safety and public confidence require that Diablo not be allowed to operate--even at low power--until these questioned matters are cleared up.

The charges should be looked into by the Office of Investigation of the Nuclear Regulatory Commission and the design thoroughly reviewed bv an independent, broadly based public body.

Co 1 lly

/

/

)

//

/

,y

/

c orq odal Da.

t Senator, 12th

' strict DM:chh B402010262 840119 PDR ADOCK 05000275 7,

U PDR

'\\

cc:

Darrell G.

Eisenhut, Director Division of: Licensing U. S. Nuclear Regulatory Commission

' Washington, D.C.

20555

)

Attorney General John K. Van de Kr_ p Department of Justice

-1515 K Street, Suite 511 Sacramento, CA 95814 l

Governor George Deukmejian Congressman Morris Udall Chair, Subcommittee for Energy and the Environment 1234 Longworth House Office Building Washington, D.C.

20515 5-k b

a. -

3'

=

$7 e

?!n

+

e a

si

=.

l SE s"'

__