l Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536-4000 January 24, 1984 LIC-84-022 Mr. James R.
Miller, Chief U.
S.
Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C.
20555
Reference:
Docket No. 50-285
Dear Mr. Miller:
Pressurized Thermal Shock (PTS)
In response to your request dated November 23, 1983 related to reactor vessel fluence associated with current and future core configurations, the District has established with Mr.
E.
G. Tourigny of your staff a scheduled submittal date of May 30, 1984 for the requested information.
This data will include the core power distributions and calculated flux dis-tributions at the vessel wall relative to Cycle 7 for Cycles 8 and 9.
The District will include similar da ta relative to Cycle 10.
The District will also discuss its philosophy of reactor vessel flux reduction for future cycles.
This will include discussions of fuel management and vessel shield in-stallation options at the Fort Calhoun Station.
The District is currently performing a preliminary probabi-listic risk assessment based study of the PTS risk at the Fort Calhoun Station relative to the risks discussed in SECY i
82-465.
If results from this study are available by May, 1984, they will be included in our letter.
AoM 8401310302 040124 1f0 DR ADOCK 050002es PDR l
45 5R4 Employment wim Equal Opportunity Maielremale
't
=
Mr. James R. Miller LIC-84-022 Page Two Because of the scope of the work the Distric'. has undectaken on PTS for the Fort Calhoun Station, we anticipate request-ing a meeting with members of your staff to discuss these studies.
It is expected that this meeting will be requested for shortly before or after submittal of this data.
Sincerely,
<) \\'
y4(80 W.
C. Jones Division) Manager i
Production Operations WCJ/JJF:jmm cc:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 Mr.
E.
G. Tourigny, Project Manager Mr.
L.
A.
Yandell, Senior Resident Inspector s
4 i
h, i
o 1
Y
['
g Q lw-O n
s v
q
.m t
4
_.,,.