ML20079P593
From kanterella
Jump to navigation
Jump to search
ML20079P593 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 01/20/1984 |
From: | Tucker H DUKE POWER CO. |
To: | Andensam E, Harold Denton Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8401310280 | |
Download: ML20079P593 (831) | |
Similar Documents at Catawba | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999
[Table view]Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments 05000413/LER-1999-009-01, Forwards LER 99-009-01,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits. Commitments Are Contained in Planned Corrective Actions Section of Attached Rept1999-09-15015 September 1999 Forwards LER 99-009-01,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits. Commitments Are Contained in Planned Corrective Actions Section of Attached Rept ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010-01, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000414/LER-1999-004, Forwards LER 99-004-00,re Containment Isolation Valve 2NM-221A Returned to Service Without Testing.Revised Rept Will Be Submitted to Include Addl Details When Rept Is Finalized1999-07-15015 July 1999 Forwards LER 99-004-00,re Containment Isolation Valve 2NM-221A Returned to Service Without Testing.Revised Rept Will Be Submitted to Include Addl Details When Rept Is Finalized 05000414/LER-1999-001-01, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Perfor1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000414/LER-1999-003, Forwards LER 99-003-00,re Unplanned Actuation of Esfa Sys. Supplemental LER Is Expected to Be Submitted by 9908311999-07-0808 July 1999 Forwards LER 99-003-00,re Unplanned Actuation of Esfa Sys. Supplemental LER Is Expected to Be Submitted by 990831 ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided ML20209E2701999-07-0101 July 1999 Forwards Insp Repts 50-413/99-03 & 50-414/99-03 on 990425- 0605.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209E3931999-06-28028 June 1999 Informs of 990618 Meeting Conducted at Facility to Present Results of Most Recent Periodic Plant Performance Review for Plant.List of Attendees Encl ML20196G8861999-06-24024 June 1999 Discusses GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structrual Integrity 950816 & 960729 Responses.Rvid,Version 2 Released as Result of Review.Rvid Should Be Reviewed & Comments Should Be Received by 990901 If Not Acceptable for Plant ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20196G6541999-06-17017 June 1999 Confirms 990614 Telephone Conversation Re Rescheduling of Two Predecisional Enforcement Conferences Originally Scheduled for 990623.SSS Conference Rescheduled for 990712 & Ice Condenser Conference Rescheduled for 990720 ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A5781999-06-14014 June 1999 Discusses Notice of Enforcement Discretion for Duke Energy Corp Re Catawba Nuclear Station Unit 1 TSs 3.5.2 & 3.7.12 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217H0041999-10-13013 October 1999
[Table view]Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments 05000413/LER-1999-009-01, Forwards LER 99-009-01,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits. Commitments Are Contained in Planned Corrective Actions Section of Attached Rept1999-09-15015 September 1999 Forwards LER 99-009-01,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits. Commitments Are Contained in Planned Corrective Actions Section of Attached Rept ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010-01, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units 05000414/LER-1999-004, Forwards LER 99-004-00,re Containment Isolation Valve 2NM-221A Returned to Service Without Testing.Revised Rept Will Be Submitted to Include Addl Details When Rept Is Finalized1999-07-15015 July 1999 Forwards LER 99-004-00,re Containment Isolation Valve 2NM-221A Returned to Service Without Testing.Revised Rept Will Be Submitted to Include Addl Details When Rept Is Finalized 05000414/LER-1999-001-01, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Perfor1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual 05000414/LER-1999-003, Forwards LER 99-003-00,re Unplanned Actuation of Esfa Sys. Supplemental LER Is Expected to Be Submitted by 9908311999-07-0808 July 1999 Forwards LER 99-003-00,re Unplanned Actuation of Esfa Sys. Supplemental LER Is Expected to Be Submitted by 990831 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20195J1691999-06-10010 June 1999 Forwards Written Documentation of Background & Technical Info Supporting Catawba Unit 1,notice of Enforcement Discretion Request Re TS 3.5.2 (ECCS-Operating),TS 3.7.12 (Auxiliary Bldg Filtered Ventilation Exhaust Sys) ML20217G5771999-06-0909 June 1999 Forwards Post Exam Comments & Supporting Reference Matls for Written Exams Administered at Catawba Nuclear Station on 990603 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 9907081999-06-0303 June 1999 Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 ML20207F2381999-06-0101 June 1999 Forwards Copy of Catawba Nuclear Station Units 1 & 2 1998 10CFR50.59 Rept, for NRC Files ML20195J1131999-05-26026 May 1999 Requests Approval to Change Cycle Dates for Two Year Requalification Training Program Required by 10CFR55.59,to Improve Scheduling of Requalification Exams to non-outage Periods ML20195B4751999-05-24024 May 1999 Forwards Rev 7 to UFSAR Chapter 2 & Chapter 3 from 1998 UFSAR for Catawba Nuclear Station.List of Instructions on Insertion Encl ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R1721999-05-13013 May 1999 Forwards Monthly Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T0281999-05-12012 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual. Document Constitutes Chapter 16 of UFSAR ML20206N8201999-05-10010 May 1999 Forwards Revs 15 & 16 to Catawba Unit 1 Cycle 12 COLR, Per TS 5.6.5.Rev 15 Updates Limits for New Catawba 1 Cycle 12 Reload Core & Rev 16 Revises Values Re Min Boron Concentrations for Rwst,Cla & SFP ML20206J4431999-05-0303 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e).Document Constitutes Chapter 16 of UFSAR ML20206D2141999-04-29029 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Catawba Nuclear Station,Units 1 & 2, Per Plant TS 5.6.3. Rept Contains Listed Documents ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20206B1171999-04-19019 April 1999 Forwards Changes to CNS Selected Licensee Commitments Manual, List of Effective Pages.Document Constitues Chapter 16 of UFSAR ML20206C0321999-04-19019 April 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20205R3891999-04-13013 April 1999 Forwards List of Effective Dates for Tables & Figures of 1998 UFSAR ML20205P9461999-04-13013 April 1999 Forwards Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for Feb 1999 Encl ML20205M7511999-04-0808 April 1999 Forwards Revised Pages Associated with Oct 1998 Catawba Ufsar.Manual Holders Should Update Manual as Indicated by Attachment ML20205M7721999-04-0808 April 1999 Forwards Original & Ten Copies of 1998 UFSAR for Catawba Nuclear Station.Effective Date of Changes Provided by Submittal Is 981024 ML20205K5131999-04-0707 April 1999 Forwards Complete Response to NRC 981209 & 990105 RAIs on Question 11 Re LARs for McGuire & Catawba Nuclear Stations. Addl Info Received from W & Contained in Encl W ML20205G8261999-03-30030 March 1999 Forwards 1998 Occupational Radiation Exposure Rept for Catawba Nuclear Station.Tabulation Suppls Requirements of 10CFR20.2206 1999-09-08 Category:UTILITY TO NRC MONTHYEARML20059L5491990-09-14014 September 1990
[Table view]Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld ML20059L5521990-09-14014 September 1990 Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) ML20059K2021990-09-12012 September 1990 Submits Supplemental Response to Generic Ltr 89-14, Svc Water Sys Problems Affecting Safety-Related Equipment. Intake Structure Insp Program Developed.Procedures for Insp Implemented & Intake Structures Sampled & Analyzed ML20064A8041990-09-0505 September 1990 Notifies NRC of Mod to 890301 Response to Violations Noted in Insp Repts 50-413/86-18-01 & 50-414/86-18-01 Re Valves. All Valve Locking Mechanisms Would Be Installed by End of Unit 2 Refueling Outage (Approx Aug 1990) ML20064A5741990-09-0404 September 1990 Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) ML20059G3011990-09-0404 September 1990 Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20059G8321990-08-30030 August 1990 Withdraws 880726 Proposed Tech Spec Change,Clarifying Tech Spec 3/4.7.6 Re Emergency Power Requirements for Control Room Ventilation Sys ML20059D2011990-08-27027 August 1990 Forwards Piedmont Municipal Power Agency , Authorizing Use of Annual Rept for NRC Docket Requirements ML20059D2441990-08-24024 August 1990 Forwards Special Rept PIR-1-C90-0261 on 900725 Re Cathodic Protection Sys Failure to Pass Acceptance Criteria of 60-day Surveillance.Std Work Request Generated to Check Voltage Potential at Test Station TS-36 on Weekly Basis ML20056B4981990-08-22022 August 1990 Responds to NRC Request for Addl Info Re General Relief Request for Pump Vibration Submitted 900315.Relief Request Changed to Insure Data Taken Over Range That Encompasses All Main Potential Noise Contributors ML20056B5011990-08-22022 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-17 & 50-414/90-17.Corrective Actions:Review Will Be Conducted to Determine Category of Infrequently Run Procedures Needing Addl Verification Controls ML16259A2391990-08-22022 August 1990 Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20056B4971990-08-20020 August 1990 Clarifies Info Submitted in 871207 & s Re Steam Generator Tube Rupture Analysis Demonstration Runs. Demonstration Runs Met plant-specific Requirements in Section D to NRC SER on WCAP-10698 ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20059B6581990-08-17017 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-15 & 50-414/90-15.Corrective Actions:Present Methods of Testing Operability of CO2 Fire Protection Sys Will Be Evaluated by 910201 to Determine If Addl Testing Necessary ML20059C1591990-08-17017 August 1990 Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld ML20063Q0951990-08-15015 August 1990 Forwards Monthly Operating Rept for Jul 1990 for Catawba Nuclear Station Units 1 & 2 & Revised Rept for June 1990 ML20059C1231990-08-15015 August 1990 Advises That Util Submitting Special Rept Re Valid Failure of Diesel Generator 2B Would Be Delayed Until 880229 Had Incorrect Ltr Date.Date of Ltr Should Have Been 880204 Instead of 880104.Corrected Ltr Encl ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20059C2211990-08-13013 August 1990 Forwards Revised Chapter 16, Selected Licensee Commitments Manual, to Plant Updated Fsar,Per 10CFR50.4 & 50.71.Manual Contains Commitments Which Require Control But Not Appropriate in Tech Specs ML20063Q0261990-08-10010 August 1990 Forwards Rev 0 to Catawba Unit 2 Cycle 4 Core Operating Limits Rept, Per Tech Spec 6.9.1.9 ML20063Q0671990-08-10010 August 1990 Submits Revised Response to Violations Noted in Insp Rept 50-413/90-09.Procedure to Verify Test Inputs Modified to Verify Dummy Input Signal to Channel RTD Circuit ML20058N0181990-08-0808 August 1990 Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20081E1601990-08-0101 August 1990 Advises of Completion of 900330 Commitment Re Standing Work Request for Insp of Air Flow Monitors & Dampers,Per Violations Noted in Insp Rept 50-413/90-03 & 50-414/90-03 ML20058P3261990-08-0101 August 1990 Forwards Public Version of Rev 26 to Station Directive 3.8.4, Onsite Emergency Organization ML20081E0951990-07-27027 July 1990 Forwards Decommissioning Financial Assurance Certification Rept for Duke Power Co,co-owner of Catawba Nuclear Station Units 1 & 2 ML20055H9741990-07-26026 July 1990 Forwards end-of-cycle 3 Steam Generator Insp Rept.Nineteen Tubes Removed from Svc by Plugging W/Rolled Mechanical Plug ML20055H5231990-07-24024 July 1990 Discusses co-licensee Relationship & Obligations Re Decommissioning Financial Assurance for Facilities ML20055H4571990-07-19019 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-11 & 50-414/90-11.Corrective actions:I-beams/ Hoists Rolled to Ends of Ice Condenser & Securely Located on Rails to Prevent Any Movement ML20055H1741990-07-18018 July 1990 Withdraws 880527 & 0725 Amends Clarifying Requirements for Containment Pressure Control Sys ML20055J3441990-07-17017 July 1990 Advises That Commitment Re Procedure IP/O/A/3190/01,per Violation in Insp Repts 50-413/90-06 & 50-414/90-06, Completed on 900619 ML20055H4131990-07-16016 July 1990 Forwards Public Version of Epips,Including RP/0/A/5000/07 & HP/0/B/1009/04 ML20055F8991990-07-13013 July 1990 Forwards Monthly Repts for June 1990 for Catawba Nuclear Station Units 1 & 2 & Operating Status Rept for May 1990 ML20055G2311990-07-13013 July 1990 Withdraws 880311 Proposed Amend to Tech Spec Table 3.3-3, Item 8.f Re Number of Instrumentation Channels Associated W/ Main Feedwater Pumps.Util Determined That Change Unnecessary ML20055F8461990-07-12012 July 1990 Requests 14-day Extension Until 900802 to Submit LER 414/90-010 to Investigate Power Supply Realignment ML20058P1231990-07-0707 July 1990 Advises That Commitment to Revise Maint Mgt Procedure 1.12 to Include Functional Verification Requirements & to Develop Retest Manual to Address Retest Requirements for Any Maint Performed on Components Completed on 900614 ML20055F4131990-07-0505 July 1990 Forwards Inservice Insp Rept Unit 1 Catawba 1990 Refueling Outage 4, Per 10CFR50.55(a)(q) & Tech Spec 4.0.5.Insp Performed Per Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda ML20055D4291990-06-29029 June 1990 Supplemental Response to Violations Noted in Insp Repts 50-413/89-13 & 50-414/89-13,per .Personnel Responsible for Maintaining Crisis Mgt Ctr Drawing Trained. Util Will Continue to Evaluate Changes Made to Program ML20055E2191990-06-29029 June 1990 Submits Revised Commitment Dates Re Implementation of Dept Guidance on post-maint Testing,Per Commitment Made in 891002 Response to Violations in Insp Repts 50-413/89-19 & 50-414/89-19.Completion Date Changed to 900701 ML20044B0621990-06-26026 June 1990 Forwards Public Version of Revised EPIP HP/0/B/1009/05, Personnel/Vehicle Monitoring for Emergency Conditions. W/Dh Grimsley 900716 Release Memo ML20043H6921990-06-18018 June 1990 Advises of Revised Completion Date for VA Ductwork Cleaning to 901231,per Insp Repts 50-413/90-03 & 50-414/90-03. Vendor Personnel Assigned to Task Unavailable to Complete Cleaning Until Late 1990 Due to Outage Support Needs ML20043G1691990-06-15015 June 1990 Forwards Monthly Operating Repts for May 1990 for Catawba Nuclear Station,Units 1 & 2 & Corrected Monthly Operating Repts for Apr 1990 Re Personnel Exposure ML20055C8041990-06-15015 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-10 & 50-414/90-10.Corrective Actions:Instrument Root Valves Unisolated & Analog Channel Operational Tests for Low Temp Overpressure Protection Completed ML20043G4331990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.6.1.8 Re Lab Test of Carbon Samples from Annulus Ventilation Sys ML20043G3771990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.7.7 Which Required That Lab Test of Carbon Samples from Auxiliary Bldg Filtered Exhaust Sys Be Tested for Methyl Iodide Penetration of 0.71% ML20043G2511990-06-12012 June 1990 Withdraws 900419 Suppl to 871221 Application for Amends to Licenses NPF-35 & NPF-32 Re Tech Specs 4.7.6 Re Control Room Area Ventilation Surveillance Requirements ML20043G1741990-06-0707 June 1990 Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 ML20043G3451990-06-0707 June 1990 Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld ML20043G0721990-06-0707 June 1990 Responds to NRC 900510 Ltr Re Violations Noted in Insp Repts 50-413/90-09 & 50-414/90-09.Corrective Actions:Vc/Yc Train a Returned to Svc W/Supply Power from 2ETA.Terminal Box 1TB0X0346 Inspected & Insured Operable ML20043F6111990-06-0606 June 1990 Advises That Response to Request for Addl Info Re Operator Response Times During Simulated Steam Generator Tube Rupture at Facility,Will Be Delayed Until 900630 1990-09-05 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20079P593&oldid=4385083"