ML20079P436

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1991 for Vermont Yankee Nuclear Power Station
ML20079P436
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/31/1991
From: Murphy W, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VY-RCE-91-012, VY-RCE-91-12, NUDOCS 9111120422
Download: ML20079P436 (6)


Text

.

V 1014 M ONT YINIs 101C IN UCIsICs\\ R l *OW 1011 Colt 18014 s\\TI ON P O. IlOX 157 GOW2FOR HUNT RO AD YEllNON, VI:llMONT 05354 November 10, 1991 VY-RCE-91-012 BVY 91-111 U.S.

Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of October, 1991.

Very truly yours, VE ONT Y KEE NUCLEAR

,ER CORP.

4

'C Warren [ Murphy Senior Vice President, Operations cc:

1) USNRC Region I 475 Allendale Road King of Prussia, PA 19406
2) USNRC Resident Inspector, VYNPS DP 0411 Rev. 4 Page 1 of 1 13001';

Mh"kish EUlb {p CE2t y

8 y,

VERMoliT YANKEE ilUCLEAR POWER STATIOff i

MONTilLY STATISTICAL REPORT 91-10 FOR Ti!E MOllTil OF OCTOBER, 1991 1

DP 0411 Rev. 4 Pago 1 of 1 f

OPERATING DATA REPORT DOCKET NO.

50-271 DATE 911110 COMPLETED BY Q_.A.

WALLIN TELEPHONE

,((LQ2 ) 2 57-7711 OPRRATING STATUS

1. Unit Names Vermont YanhE2 2.

Reporting Period:

October NOTES:

3. Licensed Thermal Power (MWt):1122
4. Nameplate Rating (Gross MWo):

512

5. Design Electrical Rating (Not MWo):

514 foci 504(col

6. Maximum Dopondablo Capacity (Gross MWo):

EIS

7. Maximum Dependable Capacity (Not MWo):

1A1 8.

If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:

N/A 9.-Power-level-to which rentricted, if any(Not MWo):

N/A

10. Reasons for rostrictions, if any:

N/A

his Month Yr-to-Date Cumulativo

11. Hours in Reporting Period 745.00.

7296.00 _ 165816.02

12. Number of Hours Reactor was Critical 745.00 6800.93 134989.56
13. Reactor Reserve Shutdown Hours 0.00 0.00 0 22
14. Hours Generator On-Lino 745.00 6737.61 132109.21
15. Unit Roserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thormal Energy Generated (MWH) 118b165.00 10637950.50 195953255.50
17. Gross Electrical Enorgy Generated 398579.00 3536032.00 65283527.00
18. Not Electrical Energy Generated (HWH) 381230.00 3362927.00 61994897.00
19. Unit Servico Factor 100.00 92.31 78.86
20. Unit Availability Factor 100.00 92.3%

78.86 l

21. Unit capacity Factor (Using MDC Not) 101.53-91.45 73.43 i

(

22. Unit Capacity Factor (Using DER Not) 99.56 89.67 72.00 1
23. Unit-Forced Outage Rato 0.00 5.64 5.52
24. Shutdowns scheduled over next 6 months (Type, Date, and Duration of l

Each:- 1992 Refuelina Outaco scheduled to beain on_ March la 1992 and Jast for a six week ogriod.

25. If shut down at end of report period, estimated date of startup: N/A
26. Units In Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY

+

INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 4 l

Pago 1 of 1 i

RT No -13.F01.19F l

t

+

i

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-271 UNIT Vermont Yankee DATE 911110 COMPLETED BY G.A.

WALLIN TELEPilONE (802)257-7711 MONTli October DAY AVERAGE DAILY POWER LEVEL DA" AVERAGE DAILY POWER LEVEL (MWo-Het)

(MWe-Not) 1.

508 17.

513 2.

507 18.

514 3.

508 19.

514 4.

510 20.

514 5.

508 21.

514 6.

497 22.

514 I

7.

512 23.

514 8.

513 24.

514 9.

513 25.

515 10, 510 2 6.-

513

-11.

510

  • 27, 534 12.

512 28.

513 13.

513 29, 513 14.

512 30, 512 15.

514 31.

513 16.

513

  • 25 hour day INSTRUCTIONS:

in this format, list the average daily unit power level in MWE-Net for each day in the-reporting month.

Compute to the nearest wholo 1

megawatt.

VYDPF 0411.02 DP'0411 Rev. 4 Page 1 of 1 RT No. 13.F01.18V I

l-

_ _,, -. - - - - ~ _

I i

f i

i j

UNIT SUUTDOWNS AND POWER REDUCTIONS

'{

REPORT MONTH OCTOBER DOCKET NO 50-271 UNIT NAME Vermont Yankee l-DATE 911110 COMPLETED BY G.A. Wallin TELEPHONE (8021257-7711 i.

1 2

3 I

No.

Date Type Duration-Reason Method of License System Component Cause and Corrective l

l (hours)

Shutting Event Code Code Action to Prevent

^

Down Report #

4 5

Recurrence f

Reactor l

None i

I I

I L

I 1

F: Forced 2 Reason:

3 Method:

4 Exhibit G-Instructions

[

S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparation of Data B-Maintenance or' Test 2 - Manual Scram Entry Sheets for License t

C-Refueling 3 - Automatic Scram Event Report (LER) File l

D-Regulatory Restriction 4 - Other (Explain)

(NUREG 0161)

E-Operator Training and License Examination 5 Exhibit I - Same Source t

VYDPF 0411.03 F-Administrative

[

DP 0411 Rev. 4 C-Operational Error (Explain)

[

Page 1 of 1 H-(Explain)-

}

f l

I l

i t

t F

=.n

DOCKET NO.

50-271 DATE 2J1110 COMPLETED BY G.A. W ALLIll._

TELEPHONE 1E22)257-7711 REPORT MONTH OCTOBER

SUMMARY

OF OPERATING EXPERIENCES 111ghliahts Vermont Yankee operated at 99.9% of rated thermal power for the month.

Gross electrical generation was 398.579 MWHe or 99.1% design electrical capacity.

Degrating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant ras operating at 99.9%

of rated thermal power.

911015 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the cooling towers were accur-ed and the plant returned to an open cycle mode of operation.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDPF 0411.04 DP 0411 Rev. 4 Page 1 of 1 RT No. 13.F01.18X l

_ _-