ML20079P295

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-61 Re Reactor Coolant Pump diffusor-ring Cap Screws & Pump Damage.Initially Reported on 821021.Due to Extensive Evaluation,Info Will Be Finalized by 830329
ML20079P295
Person / Time
Site: Palo Verde  
Issue date: 02/16/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, DER-82-61, NUDOCS 8303040578
Download: ML20079P295 (1)


Text

-,

cer Dockt.t Nos. 50-528/529/530 a

50.55(e) Report I:Ecgg,g it?:

Arizona'Public Service Company k]

PO Box 21666. PHOENIX. ARIZONA 85036 l.?: 3p February 16, nips 3 ANPP-23026-GAD /B$lef;,

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 liaria Lane - Suite 210 Walnut Creek., California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82-61 A 50.55(e) Potentially Reportable Deficiency Relating to Reactor Coolant Pump Diffusor-Ring Cap Screws May Fail And Damage Pump File: 83-019-026 D.4.33.2

Reference:

(A) Telephone Jonversation between J. Eckhardt and G. Duckv.>rth on October 21, 1982 (B) ANPP-22358, dated November 22, 1982 (Interim Report)

Dear Sir:

(

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by February 24, 1983.

Due to the extensive evaluation required, it is now expected that this information will be finalized by March 2" 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

-_\\

1 Cttt q d_L-p E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director CEVBJr/ Gild:db cc: See Attached Page 2

\\

8303040578 830216

~

PDR ADOCK 05000528 8

PDR

,,L oE l

C l

U. SE Nuclear Regulatory Commission February 16, 1983 Attention:

Mr. D. M. Sternberg, Chief ANPP-23026-GHD/BSK Page 2 cc: RicharC DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

-Washington, D. C. 20555 T. G. Woods,.Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. H. Grant D. R. Itawkinson L. E. Vorderbrueggen G. A. Fiore111 P. P. Klute I

Lynne Bernabei, Esq.

I l

Ilarmon & Weiss 1725 "I" Street, NW j

Washington, D. C. 20006

{

R. L. Greenfield Assistant Attorney General Bataan !!emorial Building Santa Fe, New llexico 87503

- _ -