Deficiency Rept,Item U-46 Re Structural Steel Bolts Not Tightened to Spec Requirements After Connections Considered Complete.Initially Reported on 830127.Structural Connections Adequate.Next Rept by 840301
ML20079N004
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/18/1984
From: Schnell D
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
U-46, ULNRC-727, NUDOCS 8401270501
Download: ML20079N004 (2)


Text

<

I hhlO us.>-

{

[} UNION ELECTRIC COMPANY

~?' 'seos amunoT sTncer ST. Louis, MISSOURI umuMS ADDRESSs ooNAW F. SCNNEU. P.O.SOM14S January 18, 1984 "'*"""'**""'**'**

--)>Mr. James G. Keppler

. Regional Administrator U. S. Nuclear Regulatory Commission Region III 799. Roosevelt Road Glen Ellyn, IL 60137 ULNRC-727

Dear Mr. Keppler:

INTERIM 10CFR 50.55 (e) REPORT NO. U-46 CALLAWAY PLANT On January 27, 1983, Union Electric reported a potential 10CFR50.55(e) deficiency to Mr. Julian Hinds, NRC Region III.

The deficiency involves a number of structural steel bolts that were found to be not tightened to specification requirements after the connections.had been considered complete. This deter-mination was made by observation of the associated load indicating washers.

On February 25, 1983, an update was provided to Mr. John Neisler, NRC Resident Inspector, stating that a preliminary inspection of selected bolted connections had been performed and the results were undergoing evaluation.

The evaluation.has been completed and, based on the preliminary inspection results, we have concluded that the structural adequacy of the connections does not appear to be affected.

We are in the final stages of inspecting all connections and will prepare a final report upon completion. The final report is expected to be issued by March 1, 1984.

Very truly yours, F'~

mY '

Donald F. Schnell DBS/sla i

cc: J. E. Konklin, NRC Region III l'

Richard DeYoung, Director I&E NRC Resident Inspectors, Callaway Plant (2)

Missouri Public Service Commission 8401270501 840118 964 PDR ADOCK 05000483 3Mi g 4

'/(0 l S PDR f627

s.

bcc: D. F. Schnell N. A. Petrick S. J. Seiken B. L. Meyers J. H. Smith R. W. Bradford C. C. Wagoner G. P. Rathbun, KG&E F. D. Field S. E. Miltenberger R. J. Schukai M. A. Stiller W. H. Weber W. H. Zvanut R. L. Powers J. C. Gearhart J. V. Laux J. R. Veatch D. W. Capone W. S. Strothman A. C. Passwater D. E. Shafer N. G. Slaten W. H. Sheppard R. P. Wendling D. B. Stecko W. R. Bird (Consumer Power)

D. Dedrick (Public Service Indiana)

DFS/ Chrono 3456-0610-C122 AC:61E02 (U46) (As a QA Record)

N. Date QA Date