ML20079M997

From kanterella
Jump to navigation Jump to search
Forwards P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond
ML20079M997
Person / Time
Site: Midland
Issue date: 02/28/1983
From: Steptoe P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), ISHAM, LINCOLN & BEALE
To: Bechhoefer C, Cowan F, Harbour J
Atomic Safety and Licensing Board Panel
Shared Package
ML20079N000 List:
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8303030403
Download: ML20079M997 (1)


Text

,.

p es # '((

ISHAM, LINCOLN &BEALE COUNSELORS AT LAW THREE FIRST NATN)

CHICAGO. ILUNOIS 60002 EDwutD 5. ISHAM 1872 1902 TELEPHONE 312527500 Iu'EsTEEEI E E TELE 1. 3-5288 Q, W ;_

WA$wWGTON OFFICE r-1120 CONNECTICUT AVENut. N U ib, ]ljjitY

  • AssiN C 2oose February 28, 1983 In the' Matter of

)

)

Docket Nos. 50-329-OM CONSUMERS POWER COMPANY

)

50-330-OM

)

50-329-OL (Midland Plant, Units 1

)

and 2) 50-330-OL

)

Charles Bechhoefer, Esq.

Dr. Jerry Harbour Atomic Safety & Licensing Board Panel Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 Dr. Frederick P. Cowan 6152 N. Verde Trail Apt. B-125 Boca Raton, Florida 33433

Dear Administrative Judges:

I enclose page 4 of D.H. Evans'and David Sommers' testimony on behalf of the Applicant in response to Mary Sinclair's Operating License contention 14, Cooling Pond, filed on February 14, 1983.

It came to our attention that at least some copies of the testimony served on parties lacked page 4.

Please accept the enclosed as a late-filed insertion remedying the omission.

S y, i I'

V

p(

Ph lip P. l{teptoE B303030g3y0ggg9 PDR ADO PDR a

-