6 VIRGDEA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 83-12 APPROVED BY:
M sA 1 STATION MANAGER 1
8401270372 831231 PDR ADOCK 05000280 R
PDR hh l
1 I ll
r-i Section g
Operating Data Report - Unit #1 1
Operating Data Report-Unit #2 2
Unit Shutdowns and power Reductions - Unit #1 3
Unit Shutdowns and Power Reductions - Unit #2 4
Load Reductions Due to Environmental Restrictions - Unit #1 5
Load Reductions Due to Environmental Restrictions - Unit #2 6
Average Daily Unit Power Level-Unit #1 7
Average Daily Unit Power Level-Unit #2 8
Summary of Operating Experience g
Amendments to Facility License or Technical Specifications 12 Facility Changes Requiring NRC Approval 13 Facility Changes 'Ihat Did Not Require NRC Approval 14 Tests and Experiments Requiring NRC Approval 15 Tests and Experinaents That Did Not Require NRC Approval 15 Other Changes, Tests and Experiments 16 Chemistry Report 17 Description of AllInstances Where 'Ihermal Discharge 18 Limits Were Exceeded Fuel HerGg 19 Procedure Revisions That Changed the Operating Mode 21 Described in the PSAR Description of Periodic Tests Which Were Not Completed 22 Within the Time Limits Specified in Technical Specifications
H Section Pm Maintenance of Safety Related Systems Durmg Outage or 23 Reduced Power Periods - Unit #1 - Mechanical Maintenance Maintenance of Safety Related Systems Durirg Outage or 25 Reduced Power Periods - Unit #2 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or 28 Reduced Power Periods - Unit #1 - Electrical Maintenam'.e Maintenance of Safety Related Systems Durirg Outage or 30 Reduced Power Periods - Unit #2 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or 32 Reduced Power Periods-Unit #1-Instrument Maintenance Maintenance of Safety Related Systems Durmg Outage or 34 Reduced Power Periods - Unit #2 -Instrument Maintenance Health Physics Summary 36 Procedure Deviations reviewed by Station Nuclear Safety and 37 Operating Committee after Time Limits Specified in T.S.
l I
~
l l
rt--i-s
+
-m e=w--eew-g-we--r--=-- - - - - +
c g-pw-ew--
--g--rv,----,*
s-e g--v- +,
-wtw s
w 3-9 e--w--cm--
TT---w-m-ew-- --r-==w---r--ee7em --e r-M'-p--*
j OPERATING DATA EEPORT DOCKET l'O. 50-280 L
DATE 06 JAl? 84 CO'fPLITED RY Vtvian H. Jones TELEPHONE 804-357-3184 gggTI_NGSTA_wS
- 1. UNIT HA!!E SURRY UNIT 1
- 2. REPORTING PERIOD 120183 TO 123183
- 3. LICEh' SED THERIAL POWER (!fWT) 2441 l~~~~~~~~~~~~~~~l
- 4. NA!iEPLATE RATING (GROSS ?!WE) 847.S l NOTES l
S. DESIGN ET,ECTRICAL RATING (NET !!WE) 788
- 6. ?!AXI'!U:1 DEPENDABLE CAPACITY (GROSS MWE) 811
- 7. l'AXIXIE! DEDENDAELE CAPACITY (tiET !n'E) 775
. 9. PCi!ER LE'HL To in!ICH RESTRICTED, IF A!!! ll/A (NET l!'?E)
- 10. REASol!S FOR RESTRICTIONS IF ANY
. N/A THIS NONTE ??-%-DATE CUHULATI'M
- 11. HOURS IN RETORTING PERIOD 744.0 8760.0 96648.0
- 12. NWlEER OF HOURS REACTOR WAS CRITICM 601.1 5181.2 59092.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3765.2
- 14. ROURS GENERATOR ON-LINE S81.4 S012.S 57867.2
- 15. UNIT RESERVE SEUTD0t!N ROURS 0.0 0.0 3736.2
- 17. GROSS ELECTRICAL ENERGY GENERATED (!!WH) 431730.0 3713800.0 43319843.0
' 18.1:5T ELECTRICAL ENERGY GEliERATED (!!WR) 409212.0 3517273.0 41077736.0
- 19. UNIT SERVICE FACNR 78.1 o/*
S7.2 ola S9. 9 < /*
- 20. UNIT AVAILABILITY FACTOR 78.1 */*
57.2 ole 63.7 ele
- 21. UNIT CAPACITY FACTOR (USING HDC NET) 71.0 =/*
S1. 8 * /*
S4.8 ele
- 22. UNIT CAPACITY FACTOR (USING DER NET) 69.8 o/*
S1. 0 o /*
S3.9 e/o
- 23. UNIT FORCED OUTAGE RATE 21.9 ele
- 4. 3 o le 21.6 e/*
- 24. SHUTDOWNS SCREDULED OVER NEXT 6 HONTRS WINTER MAINTENANCE 24 LODA (TYPE,DATE,A!;D DURATION OF EACE)
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTE! ATE DATE OF STARTUP
- 26. UNITS IN TEST STATUS P0 RECAST ACHIEVED (PRIOR TO CotD:ERCIM OPERATION)
INITIAL CRITICALITY INITIAL ETECTRICITY CCW!ERCIAL OPERATION.
..w as e
pe
- e W'
-e w
-n
.w.
.w---
n.-
w
OPERATING DATA REPORT DOCEET NO. 50-281 DATE 06 JA?? 84 COtfrLETrD "y Vitier. H. Jones TELEPHONE 804-357-3184 O_PE_ RATING S_TA_TU_S
- 1. UNIT NN!E SURRY UNIT 2
- 2. REPORTING PERIOD 120183 TO 123183
- 3. LICENSED THER!M POWER (MWT) 2441 l~~~~~~~~~
~~ l
- 4. NN!EPLATE RATING (GROSS M2*)
847.5 l NOTES l
- 5. DESIGN ELECTRICE RATING (NET !!WE) 788
- 6. !!AXI;W1 DE*ENDABLE CAPACITY (GROSS I!WE) 811
- 7. ?!AXIlUi! DEPENDABLE CAPACITY (NET !3lE) 775
- 9. PC.7ER LEVFL TO WICH RESTRICTED, IF ANY N/A (NET I!VE)
- 10. REASONS FOR RESTRICTIONS, IF ANY N/A THIS NONTH YR-TO-DATE CW!ULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8760.0 93528.0
- 12. NID!BER OF HOURS REACNR YAS CRITICAL 281.B 5896.4 58570.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 253.3 5731.9 57576.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THER!AL ENERGY CENERATED (atWH) 569953.9 ~134?4526.8 134715872.9
- 17. GROSS ELECTRICAL ENERGY GENERATED (!MI) 184400.0 4312140.0 43794859.0
- 10. IlET ELECTRICE ENERGY GENERAED (f."4) 174571.0 4086139.0 41507060.0
- 19. UNIT SERVICE FACTOR 34.0 */o 65.4 e/o 61.6 e/o
- 20. UNIT AVAILABILITY FACTOR 34.0 o/*
65.4 * /*
61.6 o/*
- 21. UNIT CAPACITE FACTOR (USING NDC liET) 30.3 o/o 60.2 ole 57.3 ole
- 22. UNIT CAPACITY FMTOR (USING DER NET) 29.8 ele 59.2 o/*
56.3 ole
- 23. UNIT FORCED OUTAGE RATE 0.0 2.1 ole 14.1 o/=
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS SPRING MAINTENANCE 3-16 10 DAY (TYPE.DAS,AND DURATION OF EACH)
- 25. IF SHUT DCh?; AT END OF REPORT PERIOD, ESTIl: ATE DATE OF START!P
]
- 26. UNITS IN TEST STATUS FORECAST ACHIEVED (PRIOR TO COlE1ERCIM OPERATION)
INITIAL CRITICALITI INITIAL ELECTRICITX.
CO.W4ERCIAL ' OPERATION
.o DOCKET NO.
50-280 UNIT SilHTDOWNS AND POWER REDUC 110NS UNIT NAME h rrv i
.DATE Jantary_ll6.1984 COMPLETED gy ' Vivian II. Jones REPORT MONTil December ione TELErilONE Ext. 477 i
e.
~
w Licensee Eg Cause & Corrective
.! E 3
}Yj No.
Date
{
Eg g
, y oc Event g7 i
Action to fU Prevent Recurrence
$5 5
j if3 g Report #
- n O F
6 80-21 12-15-83 F
125.3 A
3 Reactor trip caused by "C" RCP ' tripping.
The leads to the pump motor failed open. The leads were repaired.
I 80-22 12-24-82 F
24.2 A
3 Reactor trip caused by a high level in "C" S/G. The feed regulating valve went full opened due to a feed flow transmitter i'i' failing high due to frozen sensing line, also the "C" FRV stuck open. The sensing lines a
were thawed out and "C" FRV was repaired prior to startup.
i 80-23 12-25-83 F
4.3 G
3 Reactor trip caused by a low -low level "A" S/G during startup.
4 80-24 12-25-83 F
8.8 G
3 Reactor trip caused by a high level Iri"B" S/G during startup.
i i i
2 3
4 Method:
Exhibit G. Instructions F: Forced Reasim:
S: Stheduled A Equipment Failure (Explain)
I-Manual for Pseparation of Data D-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee i i 3 Automatic Scram.
Event Report (LER) File (NUREG-
'g C Ilefueling D Regulatosy Resliiction 4-Ollies (Emplain) 01611 1
i E-Operator Training & Ucense Examination l
5 F Administrative Exhibit I Same Source i
G-Operational Esaur (Explain) j l'8/77)
Il-Other (Explain) l
e O
o i
50-281' DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Surry II DNIE Januarv 03.1984 COMPLETED sy Vivian II. Jnnee i
REPORT MONTil December 1983 TELErilONE Ext.477 9
I E
.! E 3
Y-Licensee Cause & Corrective Wo.
Date
[
gg j$
3 g 3' d,Evi k"t Event Action to F
$5 sE j15g Repost #
- G fu Prevent Recurrewe S
Reactor trip during plant shutdown ca Jsed 83-26 12-07-83 S
227.8 A
3 by a spike from first stage pressure when the generator output breakers were opened.
The plant was being shutdown to repair aux.
feed water check valves.
i 83-27 12-16-83 S
262.9 A
3 Reactor trip during plant startup caused a high level in "C" S/G, the plant was cooled f
down to repair "C" RCP's #1 seal.
J i
l i
4 J
Exhibit G-Instructions 1
2 Method:
F: Forced Reason:
I Manual for Pseparation of Data S: Scheduled A Eituipment Failure (Explain) 2-Manual Scram.
Entry Sheels fue Licensee D Maintenance of Test 3 Automatic Scram.
Event Repost (LER) File NUREG-
- C. Refueling 4-Other (Explain) 0161)
- D Regulatory Ressiiction
!l.
E-Operator Tsaining & Ucense Examination 5
F Adminisirative Exhibit 1.Same Source G Operailonal Error (Explain)
I'8/77) ll-Othes (Explain)
I 1
LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS
" NIT NO.I NONTii; Oscsmbst, I000 DATE-TUfE HOURS LOAD, W REDUCTIONS, W F*H REASON' NONE DURING 'IHIS REPORTING PERIOD.
I m
4 ed e
MONTHLY TOTAL
LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS t
5-O. 2 30NIH: Decemtser,1980 DATE' TIZE -
HOURS LOAD, W REDUCTIONS, W WH REASON NONE DURING TfDS REPORTING PERIOD.
9 9
t
=
r I
I L
MONTHLY TOTAL 1
~
DOCKET NO 50-280 UNIT SURRY I DATE 1-1-84 CO/PLEED BJ Vivian H. Jones
~,
AVERAGE DAIT.Y UXIT POVER LEVEL MONTH: DECD!BER 83 AVERAGE DAILY POWER LEVEL AVERAGE D.4ILY POWER LEVEL DAY (NWE-NET)
DAY
(?NE-NET) 1 744.5 17 0.0 2
748.0 18 0.0 3
747.4 19 0.0 4
748.3 20 23.5 5
748.4 21 451.0 6
748.5 22 732.0 7
742.6 23 737.6 8
742.5 24 555.5 9
741.5 25 0.0 10 741.6 26 144.3 11 742.0 27 606.4 12 742.7 28 740.7 13 743.0 29 739.6 14 742.5 30 732.6 i
(
15 419.3 31 744.6 l
16 0.0 l
DAILY UNIT POWER LEVEL FOMI INSTRUCTIONS ON THIS FORf, LIST ThlE AVERAGE DAILY UNIT MWER LEVEL IN INE-NET POR EACH DAY IN 1
THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH MR EACH REPORT-ING MONTH. NOTE THAT BY USING MAX 1 MUM DEPENDABLE CAPACITI FOR THE NET ELECTRICAL i
RATING OF THE UNIT, THERE MAX BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS j
THE 100 */* LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE i
DAILY UNIT POWER OUTPUT SHEET SHOULD BE E00TNOTED M EXPLAIN THE APPAREWT ANOMALY.
l l
l !
- ~
DOCZET NO 50-281 UNIT SURRY II DATE 1-2-84 COMPLETED BY Vivian H. Jones V
AVERACE DAILY UNIT POWER L "l:L MON"Hz DECDfBER 83 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWE-NET)
DAY (MWE-NET) 1 739.3 17 0.0 2
739.4 18 0.0 3
741.1 19 0.0 4
744.5 20 0.0 5
743.5 21 0.0 6
737.7 22 0.0 7
37.1 23 0.0 8
0.0 24 0.0 9
0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 175.5 12 0.0 28 483.0 13 0.0 29 646.1 14 0.0 30 746.4 15 0.0 31 740.2 16 0.0 DAILY UNIT POWER LEVEL FOPN INSTRUCTIONS l
ON THIS FOMI, LIST THE AVERAGE DAILY UNIT POWER T.EVEL IN MVE-NET FOR EACH D4Y IN ~~~
THE REPORTING MONTH. THESE FIGURES WILL BE USED M PLOT A GRAPH POR EACH REPORT-
.ING MONTE. NOTE THAT BI USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELECTRICAL RATING OF THE imIT, THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100 */* LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH Oa5ES, THE AVERAGE t
l DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED % EXPLAIN THE APPARENT ANOMALY..
w q-n ew-
.wm-,.
.m-9 w
t-T=""""
SUMMARY
OF OPERATING EXPERIENCE December,1983 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulting in significant non-load related incidents.
UNIT ONE 12-01-83 0000 This reporting period begins with the unit at 100% power (785 MW's).
12-15-83 1335 Reactor trip, caused by "C" RCP tripping 1744 Commenced RCS cooldown to repair "C" RCP motor connector 2114 RCS < 350'F,450 psig 12-16-83 0243 RCS < 200'F 12-19-83 1125 RCS > 200*F
~
1500 RCS > 350'F,450 psig 12-20-83 1236 Reactor critical 1852 Generator on the line, increasing power at 3%/hr.
12-22-83 0153 Unit at 100% power (780 MW's) 12-24-83 1751 Reactor trip caused by high level in "C" S/G 12-25-83 1410 Reactor critical 1805 Genc'ator on the line 1810 Reactor trip, caused by low -low level in "A" 5/G 2011 Reactor critical 2223 Generator on the line 2228 Reactor trip, caused by high level in "B" S/G 12-25-83 2358 Reactor critical 12-26-83 0717 Generator on the line, increasing power at 3%/hr.
12-27-83 1900 Unit at 100% power (780 MW's) 12'-31-83 24'30 This reporting period ends with the unit at 100% power (785 MW's) -.,
+=
i+,
mr.-p c,
,.--4 i.r-----,,,,-p p,,.
4
,-,-.r-3
-w-
SUMMARY
OF OPERATING EXPERIENCE December,1983 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT TWO 12-01-83 0000 This reporting period begins with the unit at 100% power (780 MW's) 12-06-83 2229 Commenced plant shutdown at 150 MW's/ hrs. to repair aux. feed water check valves.
12-07-83 0332 Reactor trip caused by turbine trip when generator output breakers were opened.
0650 Commenced RCS cooldown 1029 RCS < 350'F,450 psig 1445 RCS < 200*F 12-10-83 1920 RCS > 200*F 2330 RCS > 350*F,450 psig 12-11-83 053G RCS at HSD 1130 Commenced RCS cooldown to repair 2-SI-88,238 1517 RCS < 350*F,450 psig 1855 RCS < 200'F 12-13-83 0535 RCS at mid-nozzle 12-14-83 0750 Commenced fill & vent of RCS l
12-15-83 0855 Completed RCS fill and vent 1809 RCS > 200*F 12-16-83 0001 RCS > 350*F,450 psig l
0605 RCS at HSD 1145 Reactor critical 1517 Generator on the line 1519 Reactor trip, caused by high level in "C" S/G l
l 1830 Reactor critical l 1 i
,_,,.---,,c
12-17-83 1702 Shutdown reactor in preparation to go to CSD to repair "C" RCP's #1 naal c
12-12-83 0041 RCS < 350*F,450 psig 0404 RCS < 200'F 2055 RCS at mid-nozzle 12-22-83 2125 Commenced fill & vent of RCS 12-23-83 0040 Completed RCS fill & vent 0559 Hold RCS heatup due to high conductivity in RCS 12-26-83 1430 RCS > 200*F 1950 RCS > 350'F,450 psig 12-27-83 1148 Reactor critical 1414 Generator on the line, increasing power at 150 MW/hr.
2010 Holdies power at 68% for station dT limit of 23*F (520 MW's) 12-29-83 0410 Commenced slow power increase, monitc, ring station AT 1915 Unit at 100% power (785 MW's) i l
l
! l l
9 7
.rm-
"P'"
P*-
e
"TF F'
N P'
-7 7'
AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS The Nuclear Regulatory Commission issued, en November 14,1983, Amendment Nos. 91 and 90 to the Operating License for Surry Power Station, Units 1 and 2, respecti'tely.
These amendments revise Technical Specification tables 3.8-1 and 3.8-2 which list containment isolation valves. This change replaces valves for the hydrogen analyzer system and the Residual Heat Removal Sample line, and removes valves for the leakage monitoring detection system. Several administrative errors are also corrected.
L l
l l
l l
i L
FACILITY CHANGES REQUIRING NRC APPROYAL NONE DURING THIS REPORTING PERIOD.
.- I
... =. _... _ _ _ _. _ _ _.,_
FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL UNIT DC 82-11C Control Room Habitability Installation of Redundant 1&2 Cholorine Monitors Two chlorine monitors were installed in the main control room to meet the requirements of IEEE 279, 1974, Regulatory Guide 1.78, and Regulatory Guide 1.95.
The chlorine monitors sample the control room normal air intake by means of redundant and fully separated inline sensors installed in the ducting support channel installed ahead of the isolation dampers.
Summary of Safety Analysis The addition of redundant chlorine monitors will provide increased protection for the Control Room Operators and will satisfy the single failure criteria for the monitors given in Regulatory Guide 1.78, Regulatory Position 14.
DC 82-23 Removal of the Steam Generator Blowdown Tanks 1&2 This design change removed existing Steam Generator Blowdown Tanks. The Steam Generator Blowdown Flash Tanks were no longer being utilized because of modifications to the system installed with Design l
Change 76-31.
Summary of Safety Analysis The modification does not decrease the margin of safety due to the fact the blowdown tanks are no longer utilized in operating the present system.
t i
l t
t l
l l
, l l
-.y w
w e
s
&ry a.-
g---4 w-w y
y-----
-,9--wy e-m
-g
e 4
y e
b TESTS AND EXPERIMENTS REQUIRING NRe arPRovrL NONE DURING THIS REPORTING PERIOD.
TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL NONE DURING THIS REPORTING PERIOD.
i O -
S-4 4-w g9-,
e-
--,p
,,,,y.n-w%---,,9,
+ <. m aw,
,..m-
OTHER CHANGES, TESTS AND EXPERIMENTS NONE DURING THIS REPOP. TING PERIOD.
1 l
I i
,-es+-
e---w
,we-e%.e-,-e.----,m,__.
,e-,ym...c w y-m y-m--
ge m r re r-e W m m ww w we M*wg-g-mv-ewwg "g-w
-p--m-ww--myy g
w-"wWy--Te7.-p+-
---wwNF7'-*mwrf--
'&*w
l VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION CHEMISTRY REPORT December 19 83 T.S.
6.6.3.d PRI N COO N UNIT NO. 1 UNIT NO. 2 ANALYSIS MAXIMUM MINIMUM AVERAGE MAXIMUM MINIMUM AVERAGE
-1
-3 1.68E 1.56E' 3.66E 4.56E 4.61E 9.05E' Gross Radioact., uCi/ml Suseended Solids, pom 0.0 0.0 0.0 0.0 0.0 0.0
-1
-2
-1
-1
-2 Gross Tritium, uCi/ml 1.70E 4.80E 1.27E 1.81E 2.17E 8.42E-Iodine 131, uCi/ml 1.13E+0 1.43E 2.45E 2.28E 2.71E 1.54E
-2
-1
-2
-5
-3 l33 0.96 0.28 0.65 0.21 0.07 0.12 I
/I 46.6 14.1(A) 27.1 30.6 4.0 16.3 (
Hydrocen, cc/ke Lithium, pom (B) 2.10
.90 1.12 2.58
.66 1.62 Boron-10, ppm.
342 88 142 322 151 246
- Oxycen, (D.O.), ppm
<0.005 4 0.005 4 0.005 1.50 4 0.005
.202 4 0.05 4 0.02 0.02 0.14 4 0.02 0.04 Chloride, pom pH 6 25'C 6.94 6.18 6.65 6.70 5.94 6.34
- Boron-10 = Total Boron x 0.196 NON-RADIOACTIVE CHEMICAL (C)
RELEASES, POUNDS T.S.
4.13.A.6 Phosphate Boron-117 Sulfate __
Chromate 0.0 50% NaOH Chlorine
0.0 REMARKS
(A). Operations notified; Chemistry recommended increase in VCT pressure.
(B). Lithium additions made to Uniti: 1700gms. 12/15; 535gms. 12/19; 800gmsr 12/20:
635gms. 12/26; 325gms. 12/27. Additions to Unit 2: 1260rms. 12/7: 250 cms. 12/7; 356 cms.
12/11; 1950gms. 12/15; 455gms. 12/15; 025gms. 12/17; 2025gms. 12/24: 2100gms. 12/26:
400gms. 12/27;- 220gms. 12/29. Cation Bed placed in service on Unitt for Lithium removal:
12/11. Unit 2: 12/1: 12/8: 12/31.
(C) The levels of these chemicals should nroduce no ad-verse environmental imnact.
(on 1?/94/83 h4ch.mecific cenAnctivity vne aet ct a in nnit 2 Primary. A cation resin vessel was placed in service for clean-up. Investigations are con-tinuing to locate source.) 1 l
e 9
4 DESCRIPTION OF ALLINSTANCES WHERE THERMAL DISCHARGE LIMITS WERE EXCEEDED NONE DURING TfDS REPORTING PERIOD.
i i
i l
I l
l
( l i
FUEL HANDLING UNIT I December,1983 NONE DURING THIS REPORTING PERIOD.
l i
1 i
l I
l l
1 l
l l
i - -
FUEL HANDLING UNIT II December,1983 NONE DURING TIIIS REPORTING PERIOD.
9
,.m -
PRnCEDURF REVIS!OMM THA_T ORANGED THE OPERATING MODE DESCRIBED Di THE FSAR NONE DURING TIUS REPORTING PERIOD.
e 9.
T-Ow 4
-6%
+e e
e
&+w m--u-w
-=w
---y w--
y---
,--e--v
---w
---wwww~ww--
+
ye--r--wr--
DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS f
Unit 1&2 PT-23.1D Security Monthly Inverter Battery Test Was missed in May,1983. The test was performed and no problems were noted.
Unit 1 PT-27G Heat Tracing System Was missed in June and August,1983. The subsequent tests were performed and no problems were noted.
e
,ed I "4
"M
+- m es w
e
=w
1-
-a m
-w
--.A
--- - - - -2 a-
---r,-
.,J L.
_a-a-
nn-AN Ake O
9 4
e 9
9 9
8 e 0
MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 MECHANICAL MAINTENANCE i
O 9 j vi'NF D
e-Per
,-w-.
- -w-e wmmW m
--ev y
y
-M=
dy--
wgr3-*g-bs------e-Wm w*em y*
g y
--w+ex-e-w m y 3
w-gup-ww-wgir-w-yy-M=9 T-
-*'ry y
--yW+vv*----m
--%T
,I TWWSUM. 5 JM e9
- 12:91 iw 00U0ThmANCE Of sat 6TT hKLATw 51SThNS wxinC Ut/TKE ON AwtCw #wGM R13tlWS
- h I
ImiT 1 T.' *
. mm aucu 881sGM9T Sis cmp NMR00 StoutMr unPEhr Nu 9
'12/15/03 M VALVE ' 1-Sd-150' ANI6T PKU8C ANUSTw PKU8C 312092020 "t
(
~
312141902
.13/11/03 G' fligP t-CW-P-3C
- U80VE ColetisC FW ELET ASC00PLAP #18eP 2*
IS 12/20/93 W VetNE GCV=t%99 iMr.STICATE C NUR VEED N.C TLCR17EED LOOSE ACT 3l12%2190 l
5 S2/2i/93 CE. VAtNE LCV-tn69A PKUMC LAM ADJUSTEV PK ElNC CLPeD 312i60956
[(
~
12/28/03 m VAINE L N-SteeS PKffsc LAM Aplir.T w PE Aing Ct.AND 312160455
}
k 12/21/93 31 VAtNE t-81-88 P K u nC LEAR-ADlI6T ANERSTED PKUSC CLAEO 3 tits 093%
- ,, $2/31/93 N VALVE t-N-29 WON'T ort:RATEI 100E VMNE OVY SKK 312ls0911
~
12/21/03 W VALVE t -N-SS Nut,E l# VALVE-bW'T OtEKATE Lb4RD STDt 312560936 i
'W
$2/21183 BC VAINE NOV-1595 ANtGT PKUNC ADIUST w PM RinC 31181*195 29 52/2t/93 N SEG98CN 1 N -ESS-19 FIDED Fl2T10C l, EAR TICNTER TICR2%nt0 FittinCS 312Sist2%
12/31/93 N SEUBCER t-N-ESC-29 MS$nVOIR FITTinC LEM TECsTEnw FitTisc 311l11128 i 4
$2/tt/t3 31 38988ER 1-88-2%
BURIC kid DE SNAVT L't,$AVB3 N)RIC A 351E1851s 12/28/03 BC BE098SN 9/A SESt%VolR V12TinC 13 LEAN nC 2EE FitTieCS ARE TIGN1%ew St281stS%
k I.
i 1
)*(
"I 12/21183 si VALVE 1 3f-19 At7U#9&E COVtX 80LTS KEFUseN/w CUV&W sut.TS 282111033 12/11/93 G 21089 t-G -P-tB CIL LLAAS 990100P L2NbS TECMTLn w OIL LEAKS 312128%20
.)
- 12/28/83 N PEN RfA Pin NULE LEAK 1%LNEO LAM 35212E331 l
% 12/21/83 31 VALVE 1 51-113 PK U WG L&AK ADiatiTw PKUK 3518tl9%b i
l' 4
12/21/03 N VALVE S-O-293 KM'Alk PKUN t,EM A3/iGTLD P K M nC 3Stonts30
'l 12/21/93 N VALVE t -N-i t PK UnC LSAK AwweANUST PKunC 382008529 a
12/28/03 SS VALVE t-SS-SS3 haPAIN PKUNC 82AK A0/0STto PKUnC GLAnO 3t20e1521
"."' t
- f 12/2t/93 35 VALVE t-SS-101 SM*AIK PKEinC LAM AUJU51AD PKKinC 3S200152G 12/21/93 N VALVE t-80-2%
PKUnC LEM Abi4D*ADIUSTw PKRinC 3120eS528
$2/21183 31 PiFinC W-31-192A 081;n NAln 00 CAP 90693 TEEM Pt!T FIN CAY N VALVE 3810582o1 e
j
-[
$2/31/03 N VALVE NOV-CE-1215C PKKinC LEM ANU5TW PKRinGeCliANw 3ttost20s
- 9 12/28/93. CE VAINE NOV-CE*tte1C PKUNC LEM A0ia6TED PKU00 382nsg205 12/2t/93 N VetNE NOV-N 12919 PK RinC LEAR ADJUSTED PK RinC 382051203 i
I 12/21/93 N VALVE RV-CR-Stes INLET FLAnCE LEAUNC MPLKW CASEETS 3110%E538 12/31/93 M. VALVE NCV-CR-1389 VALVE RAS 8001 20 0000ET IRAK KJUSTED PK2inC 3150%tG13
'I 12/31193 C'
99E9P t-CE-P-SE f
^
OUT80AND SEAL. LEARS 10 STALLED REV OUT80ANO SEAGleGS 3102e2125
?
3 4
i t
t i
j
=
A:
k
- v. J i.
4 h
\\
i
~
f J* l
a 4
4 m
_.am2
~
.w_s.__..
O A
e e
O 9
0 e
e e
e MADtTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 MECHANICAL MADfTENANCE 4
j l
i e.
^** *
- me e
-e.
-gg
,.9--
9 m
y--g-n
--.,,y..
9
--w
+ --
re-T--+vieg
---g-p g
rw7
-g---w-3-g=w-T rer3
=*v-F
c+-
W 8-w cWyapf-"
I dj r#UESDAY, 5 JM en a 12:41 Dt e
Y*~
kAlansMCE OF SA!ETE KELAND SES%AS DURING 00TAGE OR AECtCEO MER TER1003
+
's t.
UNITS 2
- _ #827: N8G _.,,,,
c NSTSsWOT SES Cont MARM0 StNetMr WAPEkP xx e
. VALVE 2-N 131 CNbCK VALVE LEAKS THwiA;H Mo LLARS VolmD 31201510u
....12/1%193. N..
12/1%l83 N VALVE 2-N-21 CHlCK VALVE LSARS TNwWM LAtt'W val *K DISE TO SEAT 312018039 e'
)
{*
~
12ft%l93 30 VALVE EV-SD-222A.
VILL CONOW RESEMORK ADDw ELUw attent%t1
. 12/1%f83 RSS RESENV NA PKRihG MAK kt.PKEw VALVE 312010259
."' p M.'
12/1%/83 30 VALVE 2-SD-0%$
PKUNC LEAK ANUSTLD PKUNG 312010111 FLAhCE DPSTKKArt VEW LEAK!
RGil.KED K MGh* PEP 2NC 3120s2350
".. _12/t%l83 NS._,JLANCE E/A..___l i
\\e
-q ',12'21/03: MS
~
inP 10l401 WELD Ef,AK RE K K O A11%UK %
~ ' /S Pil1?
312815000 C
/
P!PE 12/21/93 NS VAINE 2-NS-130 PKKERG LEAK RLPLACEO VITH CARLK K 98 312811600 0
12/28/83 NS VALVE t NS-ist PKUNC LEAK RKPKKED VITH CARLOCK 98 312811%02 l,
9 12/21/93 K PIPinC.
2-G-P-18 ANUST OIL FRESSURE VALVE R0 ANUSTMENT M8CESSARE 3121%1253 p
G VALVE 5 $2/21183 2-E-138 NMOVE S N OL PRECE INSTALL.ED Bl.MK 3121%0151 i.
"i 12/28/03 BS D00E RfA CONT PERSONNEL DOOR REED CIL ADVED Oil TO RESEM ORR 31atns202 S
".... 12/21/93 K.
PEPERC 2 K-10%
RENOVE SEDOL PRECE REKKKO BLMK 3125%015G j
- ENC 2 NC-36 RMOVE SNOL PRECE REK K W RLANK 312t%0155 h
s,}. t
(
12/21/93.DC VALVE 2-DC-%8 B00110 DOWNET EJAK 1RSTALLED O!AlWRAnt 312110%30
..t2/21/93.G, PtNP t-CR-P 2D.
RASICR Oil CONSintE1100 Reft.K w Cil.hkeRIPN E ON E19tr
'31212105G b,
)b 12/21/G3 BD VALVE 2 BD-2%
ANUST PACUNC ANUS 1ED CLAND 312121302 b'
12/21/h3 N VALVE 2-N-21 ANUST PKURG ANUST@ CLAND 3t2125300 lt
.. 12/31/83 31 VALVE 2-SE-338..
Pact 1NC LEAK AN*tSTR PKUNC CLMD 312111215
- y 11/2tl83 N EK 2-N -E-SE T11TINC 12AUNC SILV W LLAN RATE 31206031%
i 12/21/93 SE VALVEE 2-St-N0V-2886C PACURG LLAR ANUSTED PER1NC 382060321
- 9 I L 3-ST EV-232A PK UNC LEAR ANUSTLD PKhlNC 3120to032 S
'e
~L 12/28/83 31. VALVE, 2-31-2F-2028 PKRINC LEA 4 A N UST G PK U NC 312060386 d
b1
'1 12/2t/03 31 VALVE
..L_' *,
12/21/83 CE VALVE NUV-G-22150 PKRIMC LEAR ANUSTw PKK1NC CLMD JS2051209
- .,12/21/03 CE. 21NP
,2-CE-P 18 OlL lbAK ALL clL LIMES *CULPLINGS NO LbAh5 ovND 312030131 Q
C 12/21/83 SV VALVE SCV-SV-2080.
01L 1. EAR ALL 01L LINES *CouninCS TICNTENED VAN 10U5 Ull ikAKS 312030130
(,
12/2t/93 CE t%NV 2-CE-t-1A LEARING ANUSTO PKUnC CLMD 31205120s a.,
b
. 12/21/83. CE. VALVE NOV <E-2215A, PKkiNG LEAK ANUSTED PKUnC 312051109 9
12/2t/93 W VALVE 2-N-58 CHACK VALVE LEAKS TNn0WR CUT 007 SEAT. whlD 3120110%Q
- 4. - ',
12/21193 W VAENE 2-N-8 9..
CNhCK VALVE ESARS TNROKR LAPWD SEATS Jt20110%1 D
[
1 L
i2/2i/83 BC 9 LANCES R/A 1NSTALL FLANCES rot 0V80 SIDOLS* INSTALLED Ft.ANCES 3121121iG I a 12/t2/63 31 VAING 2-31-88 5001 10 BONNET LEAK REit.ACKD CASKET 31211133%
~
'G 12/22/93 SE VALVE 2-31-238 B00110 DONRLT LEAK CRMCE CASKET 312121333 9
l
. 12/23/93 BS, CABLE R/A_.
INCREASC FINK BARRIER TEE N M M AS REQVESTED 28811065G 11/20183 BD' VALVE 2-8D-82 D00T 10 BonET LEAK RErl.KED 00NNET AND 311110203 t-12/28/93 MS VALVE 2-NS-tG8 PACUNC LEAK-FUMANITED REKKED WITN % RINGS 351 Sit %05 gr
_. 12/28/83.CE VALVE 2-O-226 R1300VE WALVE DOWNET INSEKTED PIPERC 312208203 12/28/83 btS VALVE 27-NS-20tC VALVE KRCEEDED NAR STNCKE REPLKED 1.!Mit.Wi1CH 3122%05%0
~
\\
f 12/28/83 NS VALVE EV-NS-20th VALVE DECLARED la01%KAnLE IRSPECTED VAINE 3t21%0538 A
t j
12/20/03 St DCV
.iN-SE-tot REPLACE VALVE REPLACED VALVE 312211011 i
I J
u et u
I
. ?c,
..=..,n...
=.mx,...... c.. u. eccr,. a.a..,._.,.
at: : : ::s s:sas
- s:s:sss:ss::::=r ::::
a se s:s a===~==~===g e==en::::::::::: sg:==s=
==
sassa:sses======ss.ss
- s ass sassassssssa
- ~,,, ~ = =,= = =,= =,~ =,~
=,=,=,~,~,2,: ~ e,: : : s e,s,s e,
~ ~,~,2,:
=,~
I
~
..c a
v 3
5:
y e~
3 8a :
eg :E,. s?!.
- a a
3.5s 35g-
==a
= -
aa n s.a.
4 8
o 3
5
,e,
a oso
=
231g33ol:en 2s-Es=a e e
3 8
8 du 2
v5 M vavaussvu 5
Eer=s$ jS u,
.:I tmmammmmu==
=
e i !:haB -iaBiHGl:QIeele Sn 3?! 05thth! mmh 8
!!"a 8
la as "as 9]s e as gi,gE,e!!38 las!?e)"gE===l:sas i42252 8*3
- 8 a$
d4t
se!!c]S
mW E UEw 52 E Eg n
$$,;'Eli:en6433444444 e
=
--8 g e.E, =
5 g
ma a
=
.vk*
O 2
E u
a 4
na
~
ec e
g 3
m e
a a
a h y=E
~
~
4
~3
. so 3 E B 5
.g E
dw 3%.y W 550g..=B3 t
4 g5 g
- t 4
U.
- 3. ;>>;;>>>>
3'kta 'I *R R I *R R R s s R
- g**gg*Rs CCCCCCCCCCCCCCCCCCCCCCC i
tz t
.R R R
t-a
- = ::::::::::::.
- ~ :::::~ :::::==~::::
e-3 e
i t
c, x
- dr.
rr+rrvrrf c.,,,,,..
1
.rn m
M M
,,j
[
N V
V b
[
~
f W
d w
v m
.e.gmm 4bh4 e
e
~
W-ev w.
v w
wm
---,.,w
,%y,._.
a 9
~
2.
1,-
k
+
y b
9
(
P l
MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 ELECTRICAL MAINTENANCE i
i e*
e a
t..
1
._._...__,..,._..__._._.....m._._
.v
- ) --
3
.....u..
-. a. r,
- -,,*-r-
,7,
.m.
e EE 002RS" s : gas:.-
- R ::28
'R 2002 2 nemmen E
44 5
4=
O t'
,4
==
E
,8
% Sg ",%
3 4 E 99%$=E Ug g a
' E B una'*4 a
!!kk l$
$ *S2l%k 5 0 33 1
i, - h 8 a. p=
=
e a,as s.
g
=
=
ii Blu t*
El R
=
au E t
.R, **
4 g
elg e.*
e m
- as] =t 2 G,e s
~
=
e 3s* 5 l
e 3==
i
- g 2 2,~33,
=
~
~3 t
l 4
4E
- ww=224
=
4 SBS a $ 242$$1 v
I
-2 4
S.IR.2..
=
R tA ER g, '.k k k' k' I.
B 7
t t
=4 R.
l 4
=
\\
i l
==
=
I I k.kkkke u o mmM4mE R* E 385555
$I 2 3'2222 t
C'OkCORR i
i a
=
i i
't
.... t;. ":,n 1r,.
,2n-s,,rrn',
l r,<.
er n-,
. n 1
~
~
...r;..Jr
~
~~
... r,.-,- %.
4 e
e G
e eR e
MAINTENANCE OF SAFETY RELATED SYfrrEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 ELECTRICAL MAINTENANCE t
eem -
m
-m.
,m,-
y
~.-
.e y-
- ' - - - -'..__.i, m; 77 : ;. ;
u
- .m' i.. w.
.' u_
F I N
M M A W W M M W M sats gas==s===:rge:Ses:
Es ::ssassssssssa
- " B': 588:55E3 ! : 30 ES::::::::::::: "
ces sR===~ne
- nne:es ~
- =~~~~~~
=~2:
2
,as=a ennRn eme ne ne nennennennennennn nnne
=
a$
3 s,
3
=
s
=
Sa 2
-v a
e,
~ a a$E.E ses y$.EEEE gE
~~
- 2
$. O' 34 5gs.g s
5E" ag,00000'y3,s.e, 2 S
gys a
n a
, a
, t
'3 v.
os.
4v
==4
~
4*thggwg
=.kn 4
E"35 505 C4-2 g&
E e.-g" *gQ6 5 gg
-3g;s *Bg~saa.-x@! gag eB ssg.v 3
7:g4303gd a
4
-'g,*d 43
- ~ Bergg.ag:uas!as e
. =
s5
-ee e
eE asa ageglu:se.g=a-E'=se'4=g as g!
et.
e ss m
3.g'acEw n44 B-va-eo g
aau a as o
a
- ssuel
. D3 42 eg,2=WWWW 4=====3 ua Eg=$oag aggg8l,$we av%h.g"2
=E l k
Bg4 3
ggg enmaan aa.). san =ll
=.
=
oo35 sags: 3 a-g ge,a a g maas g
m a. mom, mala asa a,sema
=
m o
=a a
3 I
-c
- ~~
.$ec e
.$Af',
3=b, e
4 a 2 2 4s #-
2n g3
~N-w,2 sE g
~
2,3 agge E 8 E 's s-s k
~
e 4
as E at naa, arga
,5 g,ge=,2[-
5 a.:
eene gas.tt
-as - un a
e
,s a
t-
.**E E
~."nmueg vaas eens aD~~ am)g; a
==v*
.e--
5
=
== ~g g l =. = ~ ~ 3 3,a v ~a g =, s... s t e g y
c3een.
e og s~v=s33.as!Basg=Us a sle,asemansgge=66 3 3
=
g s a-g se-g
--E==s=a.g..e ag=o.
a e
m a,
.vaagte52$ua
-. 52 s
$a$$.. e u
=
=
$ $ b 2 * * *g *g e* *t, a 'n l, a w
,Et
.!tt 3$
tsi g
n ms.4,=,u,=g
,vgv s aa,Bg p
e aanven.
4 4
~, ~
- ~ ~
r.
o----
e 2
3 3M
%o
.2
.,.R.,
- - - 3:
'E 32:5:v832 vv a5 g ein gaverg~u. s,5 +g o
g g
=
g
-uan -
4 g g v A. n g,. n =o +g +g E E =
~
e n
A
$, =, B :,E E a. a. t.. s. W :. -.
a 3-gg=w o
g I',358$.aist\\IIgIl6$$$E4AI AA"IIEal33tA46AE6 g
4
, g55*5g 5
a "g,ig!=,werege i *.*et ~a!
et
- emy E
~
a**,114a.34.54'*g.~I.
i ense l'H a*Ete-t.**. *
~
5
.cRI 5
o g
=
8bhE.hEkkkkkDkkkDID kNk EEkh DNkkkk%
lt
- = ::::::::::::::::::
l a.==~-==================l !EE!!!EEEEEEEEEEEE EEEEEEEEEEEEEEEEE
=====
I ge 1 I
- "a""t W I 5 s 7 7
>f
.i e.
Y s
t T I 4'
I k_
{_M* 5 _ f_ &_*s 4 3
r.
.._ 51. 4 '
...:;.. J
.m-
h e
- g 1
MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 INSTRUMENT MAINTENANCE l
I
t 4
,,}
THURSDAY, 5 JAd 9%
- Sit %t 194 e
6 hAlkTENANCE Uf SArbYT hALATbD SIStbNS UUkidG UUTAGE Ok RLDtCAD iwbH 1%d1U03 U,
', ' ~
. t*l.
e' ggy, g METS 2NST..
MTSEMOT STS C M P NAdROC 38000Arti WhPbRF NR 12/15/93
.-l
. CR FIPinC t CH-P-SE OUTBOAND PtMP THEL 0RCOUltE LAAK TAlfD*T1GHTt;MLD E11 TINGS 352t31030
)'
12/19/93 O 10DICAT PE-G -10tB CALINRATE.1 Dt.VIATION NthetWLU N0iSTUNE at21101o5 I
12/19193 GT.200lCAT PE-G -19tn CAL 1BNAtt.1 D6T1ATEUN Mt?t0VW NUESTt/RE 312t2c100 t
e.
I.
f
$2/21/03 pl N000t25 m/A BKVAIR N00 VIES MPAlkw N00ULES AS MQUIRhD 3101115%3 31
- .}
12/2S/93 2C, D9T9C19R NO 18 GKLM CHA1TERING RErl.ACM BULLSTeTICNTLMO MICMSel1CH 31122t*11%
12/21/93 M 1901CATR F1-N-19sA INDICATES ELOV SNOUw BK ZERt1 CNWK M CAL 00 LOOP 3t1061916 4'
l 12/31/93 CW INDICATE F1-W =tO IMO! CATES Fl W SHOULD BE ETRO CRtCEw CAlinRATEUW OW IAM)F 3110Gt931 "I
~
12/2t/93 M ntE9EDER M-MS-132 NFSNRK CORRECT iME1/T CHWRFC OlfRAT100 0F SECOwER-SAT 3821306%3
~
- }'
12/21/93 M RKORDER M-MS $33 RESTORK CORiiECT INi4/T CREC MD OPS-SAT 312830s%1 11/21/93 M E XORD O RR-tSO VILL n0T RWINT AlWUSTFD*06 SERV 69 SAT 3111222%9 D*
.W
- . 11/21/03 Gtt. PIPINC R/A ALMOV TO BirA%S LEAAIEC RETICHTEn w TIETihC 3121%23%0 LW FLW ALAnFt LOCKW IR MTAIRw LOCAL IMORCATOReml1CR 3121%t025 12/2$/93 BC
- TFAW.9 tit' IT-2%90
$2/21/93 RE
- AEWint A-A-9 ALAR 4 LLXRfD RE MitACEO NACMP NELAT 312160985 i
=
,. 12/28/93 SS M9C0nD M CR SS-191 RECURDER CIVES TALSE ALAINS NtNOVw EvioT 3 Fiat SEhVICK st20stn20 12/21/03 RE NONET0t RE VC131-2 NONITON HAS Fall.w LLCHT IThTOMW 17 26.2 CMMAw SAT 31211t%o0 0
12/2t/93 nc 193T X-1-%90A CHECK UUT LOCAL MANTUR CRERKD TME CAllBRM100 312180530 t
g & 12/21/93 RP. INDICATR C1 JNUICA1DR READS LAN NamO 90 TwBLEJts 312201353 11/21/93 th N00110E g/A CHANNEL 1 QUTtiff IS 50151 MPLACM E9E-MP-SAT 301220808 l
)
I j'
_( *j
'.1 Jt-4:.
I i.,
I
- a 4
=
I; t
$9 s.
(
i(
4.
I i
i eq g
a
t l
g l
f i
MAINTENANCE OF SAFETY RELATED SYFFEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 INFTRUMENT MAINTENANCE 1
e 34-
-e e
p
_y M*
+m y
+,
ea y,wp---
--+ew--ww---
w
---r w'-
--e-e-w--=4-
--w----e w=
pm w
w--
n w-wvwrw---
r w------
1 e
s THURSDAT, 5 JM in
)
MITs 2 8
. _M pts.idST i
ESTSENVDT SIS Cm!
MANERO Sweinst 6RP6Mr 8x s
~12/01583'R$
RANGE D-31 '
SulMCE kMGE FAILO SOVKE AMCE ENL4Cli;F.S 83evis'kLT 380522218 12/02/93 DA TRMSNET LT-DA-200 LAVEL thDiCA N R in0V CN KKED LhVbL VS
- liCATion 3t2021500 t
f."
. 12/01/93. CE D18t!
2-CE + 1C YETTinC iS CRKniD hEPLKbv CWArR9. Vilt F2thed 3I2U201%$
n 12/08/83 ES GAWK R/A CA KE abGDS CAUGE CLASS 20 STALLED GACoE CLASS 3l20G2tS%
12/08/83 M EletV 2-M-P-18 NICH SP ACROSS PINF ENSTALLED CAli8RATw CAKb 381012351 (e
jf
- _ 12/09/83, M, k8CONDER BR-200 l#E AarukDEd M-Is# &ECOND&R C#bC# SAT 3t/018051 e
a 12/09/83 SS FI2TI KS 2-SS-216 THIS L&AR 13 FRENMT CUOLANT 1RSTALLED Rbk EITTINCS 3812518%5 e
l(.
12/10/93 1A CAtMit N/A CAKE DOES NOT INDICATE IwolENLT MPLKbD CAGE 381098951
- 9
~
..,12/11/83_CC GMCE N-CC-300A,
CAL 2BRATE CAWE RLPLK D CA M E 3120G0158
... -... ~
- y. _12/13/93 N ' BAR20W h/A VALVE in* VENT ALL THREE BAATORS VALVED IN BAR1DRS 3l2080859 l.
- i 12/13183 IC T00100 g/A MFA!N TUBlMC B61 VEER (IVE MD TEN MPLKED A !)E*EC20R 3t2011059 12/t3/93 BC TRMSilt LT-2-%st CRKK CAllBRATION TECNTENw TKK10C 312011it%
}
I f
}.
32/13/83 MS:. TRMSCET 2-NS-PR-003A TRMS41TTERS SPIRED MAL Si1RE CAUSED TURBENE THiP 312010129 6
12/13183 SE le31CA2R I.1-2-920.922 2 ICT DLTEATION BETVEEN IMDECAT ANUSTW IMDiCA20RS 312050851
$2/53/83 EPDC R K 000ER N/A VULTACE RKORDER WILT. 50T RUTATE IMTALLED TAIER CORNECTLT 382130329 9
(
%. 12/13/93 K SC
.9CN K 2008 CHANCE 2C'S MPLKw EC CNIP 310251658 mn 12/20/83 JF 1RPE T-12 1Rr! F-12 TAILED TERNMr.D INP-C-Rrl-32-SAT 312300138
~
f 12/21/83 BC RTO TE-%5%
RTD OltR-RKinlR OR M PLACE MANUSTED-SAT 312180815
' )
i t
..t
=
r
.. 12/21/83. W. mal.138R N2 AGV.-20%=2 ALAM VILL MOT MSET M SET ALAME 382880230
~
12/21/83 NE ALA M R-31 RICH (LUK AT SNUT DWW ALAhM FERNMEU iT S.l '
31220i336
l t 12/21/83 #1 M TECfDR #-32
- -32 Sriti#C IT#NANLD 871.1 3122tm910
'j )
12/21/83 KE, ALAM F R-9..
ENRATaC ALAMIbC 4.SETIv1MT MPLKSD 12-%96 CWPARATON 3821123%5
)
[
12/29/83 RP $RPR U%
CAL 18aATED IRPi Y %
I%NE0hNbD ENY-C-BPE-32-SAT 312298538 9
(
)
.(
e w,
e,o, e
6 5
)..
p*
t g
I r
- W 9
'g p
t 4
4.u=O * = et a
se a l.
4
W' 9
3 9
e e
HEALTH PHYSICS NONE DURING THIS REPORTING PERIOD.
edO
~ '--
- -. ~..
6
+
PROCEDURE DEVIATIONS REVIEWED BY STATION NUCLEAR SAFETY AND OPERATDF COMMITTEE AFTER TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS December,1983 Date Date SNSOC Procedure No.
Unit Title Deviated Reviewed M MP-C-G-017 2
Piping / Components (Repair / Replacement 12-08-83 12-23-83 Program)
EMP-C-FP-43 1
Sealing of Fire Stops using Dow Corning 07-14-82 12-23-83 Q3-6548 Silicone RTV Foam OP-16 1
Spent Fuel Pit Makeup Cooling and 11-19-83 12-08-83 Purification System MOP-8.15 1
Removal of BA Transfer Pump "D" 11-19-83 12-08-83 PT-15.1B 2
Steam Generator Auxiliary Feedwater 11-20-83 12-08-83 Pumps PT-19.1 2
RWST Chemical Addition Tank and Con-11-20-83 12-08-83 tainment Spray System MOV's PT-21.1 A 2
Degraded /undervoltage Protection System 11-22-83 12-08-83 Calibration H-Bus PT-21.1 A 1
Degraded /undervoltage Protection System 11-22-83 12-08-83 Calibration H-Bus PT-21.1B 1
Degraded /undervoltage Protection System 11-22-83 12-08-83 Calibration J-Bus PT-21.1B 2
Degraded /undervoltage Protection system 11-22-83 12-08-83 Calibration J-Bus i
PT-24.7 1
Fire Protection - Deluge System 11-21-83 12-08-83 l
l PT-26.6 1,2 Radiation Monitoring Equipment Back-11-18-83 12-08-83 l
ground Check n
.oe sp-
,---yu
---,--9
9 VIRGINIA ELucTHIC AND Powen COMPANY Ricianown,VIHOINIA 232G1 W.L. STEWART Vaca Passansat weetain o,eminon.
January 12, 1984 Mr. N. M. Haller, Director Serial No. 020 Office of Management and Program Analysis N0/WDC: Jab U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Nashington, D. C.
20555 30-281 License Nos. DPR-32 DPR-37
Dear Mr. Haller:
Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of December, 1983.
Very trul-yours, ts L w~
W. L. Stewart Enclosure (3 copies) cc:
Mr. R. C. DeYoung, Director (12 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)
Regional Administrator Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station 6(?'d 4