ML20079M562
| ML20079M562 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick, 05000000 |
| Issue date: | 02/24/1983 |
| From: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| GL-83-11, NUDOCS 8303030079 | |
| Download: ML20079M562 (3) | |
Text
e o
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 JOSEPH W. GALLAGHER (215)841-5003 ELECTRIC PftODUCT N DEPARTteENT February 24, 1983 Docket Nos. 50/277 50/278 50/352 50/353 Mr. Darrell G. Eisenhut Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Eisenhut:
Your January 11, 1983 letter concerning Operator Licensing Examination Site Visits (Generic Letter No. 83-01) requested that Philadelphia Electric Company provide certain information regarding request for site visits through-1985.
Your questions are restated below followed by our responsen for both Peach Bottom and Limerick Stations:
1.
Initial (cold) license examinations for units applying for operating licenses.
Response
Sixty-one (61) individuals will be taking initial license examinations through 1985.
2.
Initial license examinations to extend licenses to a secord, identical unit after initial licensing.
8303030079jQh7 PDR ADOCK PDR V
a e
Darrell G. Eisenhat, Director Page 2
Response
We will not require any testing in this' category through 1985.
3.
Examinations to support certification of utility emoloyees as instructors.
4
Response
Current schedules will require the testing of six (6) exployees to serve as instructors during the period in question.
4.
Examination to support certification of individuals who are not utility employees but who are under contract to instruct licensed operators.
Resoonse:
l Thirteen (13) non-employee contract personnel will l
require testing to serve as instructors.
5.
Examinations for initial licensing of personnel at operating ~ facilities or for upgrading a license from the Reactor Operator to the Senior Operator level.
4 i
p r,
-e r
-e.-
~
h
_a' Darrell G.'Eisenhut, Director Page 3
Resoonse It is anticipated that six (6) personnel will require testing in support of upgrading through 1985.
If there are any further cuestions or you require additional information, please contact us.
Sincerely, cc:
NRC Site Inspector Peach Bottom