Monthly Operating Rept for Dec 1983
ML20079M327
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 12/31/1983
From: Brons J, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
IP-LK-90, NUDOCS 8401270267
Download: ML20079M327 (8)


Text

.

r OPERATING DATA REPORT DOCKET NO. 50-286 DATE 01 /01 /s4 COMPLETED BY L. Kelly TELEPHONE J 914) 739-8200 OPERATING STATUS Notes

1. Unit Name: Indian Point No. 3 Nuclear Power Plant
2. Reporting Period: December 1983 I
3. Licensed Thermal Power (MWt): 3025
4. Nameplate Rating (Gross MWe): 1013
5. Design Electrical Rating (Net MWe): 965
6. Maximum Dependable Capacity (Gross MWe): 1000
7. Maximum Dependable Capacity (Net ,\tWe): 965
8. If Changes Occur in Capacity Ratingi(Items Number 3 Through 7)Since Last Report. Give Reasons:

9.' Power Level To Which Restricted,If Any (Net MWe):

10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 744 8760.0 64,321.0
12. Number Of Hours Reactor Was Critical 0 333.7 34,424.5 l 13. Reactor Reserve Shutdown Hours 0 0 0 l 14. Hours Generator On-Line 0 229.1 33,142.0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 282,244 86,425,645
17. Cross Electrical Energy Generated (MWH) 0 68,310 26,366,610
18. Net Electrical Energy Generated (MWH) 0 60,735 25,244,178 l
19. Unit Service Factor 0 2.6 51.5 l
20. Unit Availability Factor 0 2.6 51.5
21. Unit Capacity Factor (Using MDC Net) __

0 .7 40.7 l 22. Unit Capacity Factor (Using DER Net) 0 7 40.7

23. Unit Forced Outage Rate 100 95.4 23.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

25 If Shut Down At End Of Report Period. Estimated Date of Startup: (EST. Januarv 1984) 26 Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY enuu coci . e na- - ,N //

8401270267 831231 J(g ~2/7l PDR ADOCK 05000286 R _. _

PDR

_ Q

AVERAGE DAILY UNIT POWER LEVEL e .

DOCKET NO. 50-286 Indian Point UNIT No. 3 DATE 01/01/84 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH December 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Neti 1 0 g7 0 2 0 gg 0 3 0 39 0 4 0 20 0 5

0 0 21 6 0 33 0 7 0 0

, 33 8 0 24 0 9 0 0 25 10_ 0 26 0 11 0 27 0 12 0 0 28 13 0 0 29 14 0 0 30 IS 0 3, 0 16 0 INSTRUCTIONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(0177)

DOCKET NO. 50-286 __

UNITSHUTDOWNS AND POWER REDUCTIONS NO. 3 UNIT NAME .,

DATE 01/01/84 COM LE D BY e REPORT MONTil December 1983 e.

, .$ 3 3 .Ek Licensee Eg vt Cause & Corrective No. Date

^

3g s 2s2 Event gy g3 Action to F

$~ $ ~gc e

Reporier mO O

o O Prevent Recurrence d

03 830618 F 744 A 3 N/A N/A Electrical malfunction in the Main Generator 1 2 3 4 F: Forced Reason: Method: Exhibit F-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data ll-Maintenance of Test 2-Manual Scram. Entiy Sheets for Licensee C-Refueling 3 Automatic Scram. Event ReporI (LFR) File (NUREG-D Regulatory Restriction 4-Other ( Explain) 0161)

E-Operator Training & License Examination F-Administ rative 5 G-Operational Er ror (Explain) Exhibit 11- Same Source (9/77) Il-Other (Explain) 1

MONTHLY MAINTENANCE REPORT L December 1983 Month ~

W.R. # 'DATE EQUIPMENT ' MALFUNCTION CORRECTIVE ACTION 3230 12-16-84 Service Water Pump #32 Packing leaks Repacked pump 3593 12-09-83 Steam Generator #31 Valve leaks' -Installed new valve-Vent Valve MS-56 3778 12/16/83 Diesel Generacor #33 Pump leaks along shaft Replaced seals Pre Lube Pump 3962- 12/03/83 Safety Injection Valves Packing leaks Repacked valves MOV-1833B and MOV-1833A' 3963 12-09-83 Residual Heat Removal Sample Packing leaks Repacked valve-Valve 959 3964 12-16-83 Letdown Valve LCV460 Body to bonnet leak Replaced bonnet gasket

~

3973 12-14-83 Residual Heat Removal Check Gasket leak Tightened gasket Valve 838A 3974 12-06-83 Letdown Valves FCV-200 A,B,C Packing Icaks Repacked 3977 12-03-83 Safety Injection Valves Packing leaks Repacked 856E,F,G,H 3978 12-12-83 Acccumulator Valves 893B, Packing leaks Repacked 955B,C, 896A,C,D, 892D, 829A 4029 12-05-83 Heat Tracing Circuits 2 Shorted wires Replaced wires and 3 4050 12-13-83 Steam Generator #32 Blowdown Improper position indication Adjusted limit switches Valve PCV-1215A

1

+ , .

7

-MONTHLY MAINTENANCE REPORT. 'J-

~

DecembeE1983

' Month. *

- W.R. ' # DATE EQUIPMENT ' MALFUNCTION CORRECTIVE' ACTION 4051 '12-13-83 Steam Generator #31 Blowdown Improper position indication - Adjusted limit switches -

PCV-1214A 4061 12-14-83 Steam Generator #31 Blowdown Improper' position indication'

^

Adjusted limit switches.

Valve PCV-1214 ,

4064 12-13-83 Steam Generator #33 Blowdown Improper position. indication Adjusted. limit' switches

' Valve PCV-1216' 7 4071 12-27-83 Valve 885A Containment- Manway Casket. leaks Replaced. gasket' 4099 12-20-83' -Reactor Coolant Drain Tank' Diaphragm. leak Replaced diaphragm Nitrogen' Valve 1610

'I 9-l

. 1

~.

MONTHLY I & C: CATEGORY I REPORT December'1983

- Month W.R. # CORRECTIVE ACTION DATE EQUIPMENT MALFUNCTION IC-1-2215 12-12-83 R Steam Generator Blowdown Improper remote meter reading Replaced meter IC-1-2272 Radiation Monitor IC-1-2412 12-1-93 #31 Steam Generator' Low Level Alara actuates without' actual Repaired open wire in alarm Trip Alarm bistable.' trip circuit IC-1-2365 11-20-83 PQ-412B, First Stage Turbine Excessive AC ripple in D.C. . Replaced filter capacitors Pressure Power Supply power supply in power supply IC-1-2366 11-20-83 FQ-157A, RCP#1 Seal Leakoff Excessive AC ripple in D.C. Replaced filter capacitors Flow Power Supply power supply in power supply IC-1-2367 11-20-83 PQ-412A, First Stage Turbine Excessive AC ripple in D.C. Replaced filter capacitors Pressure Power Supply power supply in power supply IC-1-2421 12-7-83 R-23 Fan Cooler Unit Service Aux, alarm relay pulls in Replaced relay Water Radiation Monitor slowly and is sticking on occasion IC-1-2407 12-7-83 R11/12 Containment Radiation Low sample flow Replaced leaking gasket on Monitor R11 sample chamber cover

^

SUMMARY

OF OPERATING EXPERIENCE DECEMBER 1983 Indian Point Unit 3 remains in a forced outage caused by a malfunction in the main electrical generator .

Repairs are now in progress and it is estimated that the unit will be returned to service in January 1984.

A 4

Indian Point 3

, Nuclear Power Plant

+. P.O. Boa 215 9 Buchanan, New York 10511

.' 914 739.8200

  1. > NewWrkPbwer 1# Authority January 13, 1984 IP-LK-90 Docket No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of December, 1983.

s.

Very truly yours, John C. Brons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WP0 S. V. Fuller, NYO W. R. Yario, NYO INP0 Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339

+ 0