Text
..
n R
OMBUSTION ENGINEERING OWNERS GROUP
._. m._.x
_._.._c.
,uxm.=m
[
n-.a.Qh c.
di,
-,..h.{.y.[. c.
u~a [.h e.- c.
John J. Ilutchinson, Ch iinnan c/o Flonda Power & LightD00 Universe Boulevard / Juno Beach. FL 33408 September 24, 1991 CEOG-91-523 U.
S.
Nuclear Regulatory Commission Mr. Joseph W.
Shea Lead Project Manager Division of Reactor Projects Office of Nuclear Reactor Regulation Washington, DC 20555 Bubject:
Schedule for Completion of Generic Dounding Analysis of Surgo Line Thermal stratification
Reference:
J. W. Shea tn J. J. Hutchinson, " Audit of Combustion Engineering Owners Group Regarding Status of Generic Final Analysis of Surge Line Thermal Stratification (NRC Bulletin 88-11)", NRC Letter dated Augast 2,
1991.
Dear Mr. Shea:
As requested by the Reference, the purpose of this lette: js to inf orm the Staf f of the revised completion schedule for t'w %rge Line thermal stratification generic bounding analysis.
'v
.<w ric bounding analysis and the final report will be subruit w
.c the Staff by December 31, 1991.
This schedule for comp 1 'a; kas discussed during an August 14, 1991 conference call with au Jtaff and agreed to during an NRC review meeting of the CEOG Surgn Line analysis program held on September 18 and 19, 1991 in Windsot, CT.
The generic bounding analysis provided in the final report will demonstrate the structural integrity of CEOG member utility surge lines is maintained for a forty year design life.
In addition, the final report will verify that no hardware modifications are required for the present surge lines.
It is our understanding, based upon the September review meeting, that submittal of the final report meets the requirements for completion of NRC Dulletin 88-11 action item 1.b.
In addition, specific Justification for Continued Operation bv CEOG member utilities will not be reqmited provinea tnat. the final rynrt is
's u M ' t.v d to tM sc !: by Decembet 31,
- 991.
1; is also our undere% ndina L.s r-d upr. the September review meeting, that the completion of the plant specific activities tc update surge line design documentation (NPC Bulletin 88-11 action item 1.d) can be scheduled based uno, the date of issuance of a favorable SER by the Staff on the f nal report.
I 911 f,1070203911029ADOCK osooopg5 oDR
.. ~..
. _ -.- ~ - - -.. -.. - - - -.. -. -..
i e
- Mr. Joacph W.
Shea September 24, 1991 Page 2 cEOG-91-523 i
i If you have any questions on this matter, please do not hesitato to i
contact me.
i Very trjaly yours,
,M V %<
- \\
n
/' ohn J.h ukchinson, Chairman ll C-E Owners Group JJil/pjh cc:
C-E'0wners Group T.-Chan, USNRC-l:
l-.
i-l l