Omaha Public Power District 444 South 16th Street MW October 29, 1991 Omaha. Nebraska 68 tD2 2247 LIC-91 270R 402/636 2000
- 0. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-137 Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter f wm CEOG (J. J. Hutchinson) to fM. (J. W. Shea) dated September 24, 1991 (CE0G 91-523)
Gentlemen:
SUBJECT:
Completion of fort Calhoun Station (FCS) Response to inspecticn and Enforcement Bulletin (IEB) 88-11 " Pressurizer Surge Line Thermal Stratification" item 1.d.
As a member of the Combustion Engineering Owners Group (CE0G), Omaha Public Power District (0 PPD) supports the revised completion schedule (Reference 2 -
Attached) to resolve the remaining IEB 88-11 issues.
10 support the ravised schedule, OPPD will submit its response updating FCS surge line design documentation (IEB 88-11 item 1.d) within 90 days of receint of a Safety Evaluation Report approving the CEOG methodology utilized in the surge line thermal stratification generic bounding analysis.
If you should have any questions, please contact me.
Sincerety, AV,.5 b 5 W. G. Gates Division Manager pg.
Nuclear Operations S n o --
988 WGG/sel uo Attachment ow
.m o c:
LeBoeuf, Lamb, Leiby & MacRae 88 R. D. Martin, NRC Regional Admin;strator, Region IV W. C. Walker, NRC Project Manager i "c 5 D. L. Wigginton, NRC Senior Project Manager R. P. Hullikin, NP.C. Senior Resident inspector MO J. J. Hutchinson, Combustion Engineering i