ML20079L715
| ML20079L715 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 02/16/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20079L717 | List: |
| References | |
| NUDOCS 8302230424 | |
| Download: ML20079L715 (2) | |
Text
DUKE POWER GOMPANY P.O. HOX 33180 CIIAHLOTTE, N.C. 28242 HAL D. TUCKER teternons (704)373 4531 vuom PerssneNT NEELEAR PRODOCTION February 16, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4
Reference:
McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Duke Power Company is filing herewith Amendment No. 71 to its Application for Licenses for the McGuire Nuclear Station which is under construction pursuant to Construction Permit CPPR-84. This filing includes three signed original copies of the amendment with an attachment consisting of " Revision 45 to the Final
)
j Safety Analysis Report".
This filing also includes 15 additional conformed copies of the amendment with an additional 45 copies of Revision 45 to the Final Safety Analysis Report.
Revision 45 updates various sections of the FSAR to support licensing of Unit 2.
Initial fuel loading on Unit 2 is currently scheduled for March 1, 1983. Major items in this revision include:
- 1) Changes to the Unit 2 Startup Physics Testing Program, 2)
Changes to reflect differences in Unit 1 and Unit 2 Boron Injection Tank Systems,
- 3) Miscellaneous changes and clarifications.
Copies of this amendment 71 have been distributed in accordance with the require-ments of Part 2.101 of the Commission's regulations and the instructions contained in Mr. Roger S. Boyd's letter of August 6, 1976.
Respectfully submitte,
bxxix JL s
1 B. Tucker PBN:jfw Enclosures 8302230424 830216 DR ADOCK 05000
Mr. Harold R. Denton February 16, 1983 Page 2 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Amendment 71 to its application and documents appended thereto; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
Od W
nal B. Tucker, Vice President Subscribed and sworn to before me this 16th day of February, 1983.
C YL u)
~
Notary Public 4
My Commission Expires:
GLd A av 19 KV
/
-