Final Deficiency Rept DER 82-43 Re Comsip Main Control Panels W/Improperly Crimped Termination Lugs.Initially Reported on 820813.Connectors Not Meeting Visual Criteria Will Be Repaired.Also Reported Per Part 21
ML20079L535
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/07/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, ANPP-22923-GHD, DER-82-43, NUDOCS 8302230361
Download: ML20079L535 (3)


Text

y

\\,.

Docket Nos. 50-528/529/5304 5.0. 55 (e) Report

'k lyy,Q,F Anzona Public Service Company g,,,,i l P o. box 21666 + PHOENIX, ARIZONA 85036 O~ f' GC.:,.

February 7, 1983 N '/l,7.,

ANPP-22923-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1 I

Subject:

Final Report - DER 82-43 A 50.55(e) Reportable Condition Relating to Comsip Main Control Panels in Unit #2 Have Improperly Crimped Termination Lugs File:

83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between G. Hernandez and G. Duckworth on August 13, 1982 (B) ANPP-21792, dated September 9, 1982 (Interim Report)

(C) ANPP-22494, dated December 13, 1982 (Time Extension) l

Dear Sir:

Attached, is our final written report of the Reportable Deficiency, under 10CFR50.55(e), referenced above.

Very truly your, CLLL 9L E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske Attachment cc: See Attached Page 2

\\

C302230361 830207 PDR ADOCK 05000529 S

PDR j

\\ =

U. S. Nuclear Regulatory Commission Attention:

Mr. D. M. Sternberg, Chief ANPP-22923-GHD/BSK February 7, 1983 Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli 4

P. P. Klute Lynne Bernabei, Esq.

!~

Harmon & Weiss 1725 "I" Street, NW Washington, D. C.

20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 I

l J

g FINAL REPORT - DER 82-43 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS #1 AND #2 I.

Description of Deficiency Quality Control surveillance and random inspection of Unit #2 Main Control Boards indicated there may be deficiencies with the Wiring Terminations as supplied by Comsip, Incorporated.

Inspection of the Thomas and Betts Lug Terminations completed by Comsip revealed the following visible items which do not comply with the Thomas and Betts Basic Criteria and Installation Procedures (TRM-1), dated June, 1978. The visible defects include:

e Paper insulation is visible around the conductor, inside lug barrel.

e Conductor is not visible inside lug barrel, e Jumpers cut short, stress in lugs at termination points.

e Lugs not fastened securely to terminal strip.

11.

Analysis of Safety Implications This condition is evaluated as Reportable.

If inadequately crimped lugs were left uncorrected, potential open or short circuits could jeopardize functioning of this safety-related equipment.

III.

Corrective Action All Class lE Terminations utilizing crimp-type lugs in the subject equipment shall be inspected to visual criteria which provide that the conductor shall be approximately flush with or protrude through the barrel approximately 1/16". Any connectors which do not meet these criteria shall be repaired, as applicable, following the termination practices established in Bechtel Construction Specifi-cation 13-EM-306.

This condition will be corrected via the following Design Change Packages:

10J-RM-091 and 20J-RM-091.

This condition will be precluded on the Unit #3 Panels by transmittal of this Report to Bechtel Supplier Quality and to Comsip for their increased inspection and verification prior to shipment.

l In addition to reportability under 10CFR50.55(e), PVNGS Project considers the Deficiency to be Reportable by the supplier under the requirements 10CFR Part 21.

This Report satisfies the reporting requirements specified under 10CFR 21-21(b)(3) with the exception of Sub-Part (vi) which requires the number and location (customers and/or facilities) of other possibly defective equipment. A copy of this Report will be transmitted to Comsip, Incorporated requesting their review for reporting under 10CFR Part 21.

(