Interim Deficiency Rept DER 83-69 Re Seismic Supports on Posi-seal Valves Not Installed Per Spec.Initially Reported on 831011.Due to Extensive Investigation & Evaluation, Complete Rept Will Not Be Submitted Until 840301
ML20079L426
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/10/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28587-BSK, DER-83-69, NUDOCS 8401260109
Download: ML20079L426 (2)


Text

.

gA ECEIVED f!

i o

Ec -

Arizona Public Service Company

. P.O. box 21666 e PHOENIX, ARIZONA 85036 ggg January 10, 1984 g-ANPP-28587-BSK/TRB l

U.'S. Nuclear Regulatory Commission

/j Region V-h/

Creekside Oaks Office Park

-1450 Maria Lane - Suite 210-Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director

~ Division of Resident,

- Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-69 A 50;55(e).Potentially Reportable Deficiency Relating To Unit 1 Seismic Supports On Posi-Seal Valves Not Installed Per -

Specification.

File-84-019-026; D.4.33.2

Reference:

(A) Telephone conversation.between P. Narbut and R. Tucker on October 11, 1983 (B)~ ANPP-28202, dated November 8,1983(Interim Reoort)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and ~an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by January-20, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this'information will be finalized by March 1,-1384, at' which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly youc,

{

GULi_

AL E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management l

ANPP Project Director EEVB/TRB:ru

-cc: See Page Two f

8401260109 840110 a f

PDR ADOCK 05000528 1 r S

PM l

N-)7

lc_

no.

~

Mr. T.'W.

Bishop DER 83 Page Ivo ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555-

-T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham-R. L.' Patterson R. W. Welcher H. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339