RO 3-83-08/1P:on 830214,three of Eight MSIVs Failed to Pass Tech Spec Limit of 11.5 Scfh & Containment Isolation Valve Mo 2-74 Failed Leak Rate Test.Caused by Abnormal Wear of Valve Internals.Valves to Be Inspected & Repaired
ML20079L268
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/15/1983
From: Fleischmann R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
RO-3-83-08-1P, RO-3-83-8-1P, NUDOCS 8302230202
Download: ML20079L268 (2)


Text

a

.DESIGl!

J CTITCIFAL Cortifica PT PHIIJLDE2.PHIA EI.ECTRIC CCMPA.

~#

~'

~

'm Peach Botten Atcaic Power Statien g,

R.D. 1, Delta, Pennsylvania 17314 February 15, 19e3 Mr. R. C. Haynes Ad=inistxator U.S. Nuclear Pagulatory Co:mmission Region I 631 Park Avenue King of Prussia, PA 19406 St%7ECT RIPCitTABI2 OCCtmAD42 - PPC!<2T MF; CAT 7Ctri Ccnfir: sing J. r. Mit: nan's conversation with R. Blough, Region I, United Statens Nuclear Fagulatory CtenMasion cu 2/15/83.

Reference s Docket No. 50-278 Peach Botto:s t: nit 3 Technical Specificatica 4.7A.f 10CFR50 Appendix 3 III C3 FAport No. 3-83-C8/IP Occurrence Date:

2/14/83 Identificatien of _ Occurrences Three of eight main steam isolation valves fMSIvs) failed to pass the Technical rpecification limit of 11.5,SCFH.

In addition, containment isolation valve MD 2-74 failed a local leak rate test.

hth failures resulted in the IwW Appendiz J 11mit of 0.6 Ia being exceeded for local leak rate test totals.

Conditions Prior to Occurrence:

Unit 3 shutd.cwn for refueling.

p;perent Cause of Occurrence:

[

Abnoz nal wear of valve internals.

Analysis ef_ Occurrence:

1 Redundant MSIVs were cperable and had acceptsble laak rates.

The valve in line with MO 2-74 has not fet been testad for laak rate, but it is in an oporsb;e corditien.

This redundant valve, MO 2-77, will be testad as socn as possible to date.nine its leak rate.

Because the clant is cold shutdcAm no further is::ediate actica is required per Technical Speificatient-.

8302230202 830215

,=

PDR ADOCK 05000278

%,g g g

PDR l'

bIi Corrective Action:

v P

t' valves will be disassembled for inspecticn. repaired, ara rotestad i

prior to return of Unit 3 to pcmor.

Pravious occurrencu r

2-82-21/3L, 2-80-13/3L, 3-91-21/3L, 3-79-36/3L.

e very truly yours, M. 5. Fleisch: nann Statica Styrintar4 ant i