Forwards Public Version of Rev 1 to Emergency Plan Implementing Procedures GO-EIP-119, Relocation of Emergency Operations Facility (EOF) Functions to Alternate EOF & GO-EIP-116, Emergency Operations Facility Shift Turnover
ML20079K564
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/12/1984
From: Mudd C
ALABAMA POWER CO.
To:
NRC
Shared Package
ML20079K550 List:
References
NUDOCS 8401240642
Download: ML20079K564 (1)


Text

7 Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 i

Telephone 205 250-1000 ,

AlabamaPower the southem eectnc system January 12, 1984 Docket No. 50-348 Docket No. 50-364 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Enclosed in accordance with 10CFR50, Appendix E requirements are two

. copies each of Emergency Implementing Procedures GO-EIP-116, Rev. I and G0-EIP-119, Rev.1. Also enclosed is a Document Transmittal Acknowledgement Form which we request that you sign and return so that we may verify your receipt of these documents in accordance with our document control procedures.

If you have any questions, please advise.

Yours very truly, l

BS6ib#'

C. H. Mudd, .

l CHMJr/KWM:sm L

Enclosures:

G0-EIP-116 (2) l' G0-EIP-119 (2)

Receipt Acknowledgement xc: Mr. K. W. McCracken Mr. C. H. Mudd, Jr.

File A-27.9.1 l