Interim Deficiency Rept Re Procedural Changes Requiring Spec/Design Changes Be Contractually Imposed on Suppliers & Contractors.Initially Reported on 821208.Special Process Procedure Issued.Next Rept Expected by 830930
ML20079K101
Person / Time
Site: Marble Hill
Issue date: 12/17/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S81-18, SVP-0062-82, SVP-62-82, NUDOCS 8212280462
Download: ML20079K101 (2)


Text

-.

d PUBLIC SERVICE INDIANA S. W. Shields Senior Vice President -

December 17, 1982 Nuclear Division

$81-18 SVP-0062-82 Mr. James G. Keppler, Docket Nos.:

STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction P Nos.:

Region 111 CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On December 8,1981, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). PSI Quality Assurance personnel discovered that existing procedures did not require specification /

design changes made via engineering change notices, specification amendments, or drawing revisions to be contractually imposed on suppliers o: contractors. This created the potential for speci-fication/ design changes to be left unincorporated in the as-built configuration of safety related equipment or structures.

Procedural changes have been made which require that specification /

design changes be contractually imposed on suppliers and contractors.

PSI has implemented a special process procedure to verify that manu-factured items and materials meet the most current requirements of the specifications.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before September 30, 1983.

If you have any questions regarding this matter, please contact me at your convenience.

Sincerely 8212280462 821217 gDRADOCK 05000546 PDR S. W. Shields TE29 SWS/LGY/bak

/

DEC 2 0 S82 P. O. Box 190, New Washington, Indiana 47162 812. 289.3000