Interim Deficiency Rept Re Procedural Changes Requiring Spec/Design Changes Be Contractually Imposed on Suppliers & Contractors.Initially Reported on 821208.Special Process Procedure Issued.Next Rept Expected by 830930
ML20079K101
Person / Time
Site: Marble Hill
Issue date: 12/17/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S81-18, SVP-0062-82, SVP-62-82, NUDOCS 8212280462
Download: ML20079K101 (2)


Text

-

d PUBLIC SERVICE INDIANA S. W. Shields Senior Vice President -

December 17, 1982 Nuclear Division

$81-18 SVP-0062-82 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction P Nos.:

Region 111 CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On December 8,1981, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). PSI Quality Assurance personnel discovered that existing procedures did not require specification /

design changes made via engineering change notices, specification amendments, or drawing revisions to be contractually imposed on suppliers o: contractors. This created the potential for speci-fication/ design changes to be left unincorporated in the as-built configuration of safety related equipment or structures.

Procedural changes have been made which require that specification /

design changes be contractually imposed on suppliers and contractors.

PSI has implemented a special process procedure to verify that manu-factured items and materials meet the most current requirements of the specifications.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before September 30, 1983. If you have any questions regarding this matter, please contact me at your convenience.

Sincerely 8212280462 821217 .

gDRADOCK 05000546 PDR S. W. Shields SWS/LGY/bak TE29

/

DEC 2 0 S82 P. O. Box 190, New Washington, Indiana 47162 812. 289 .3000

0 SEPlVICE

"" Letter: J. G. Keppler December 17, 1982 S81-18 SVP-0062-82 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Comc11ssion Washington, D. C. 20555 J. E. Konklin J. J. Harrison 1