Interim Deficiency Rept Re Inadequate Pressure Transducers/ Transmitters Mounted on post-LOCA Hydrogen Recombiners. Initially Reported on 821119.Final Rept Will Be Submitted by 830211.Also Reported Per Part 21
ML20079J792
Person / Time
Site: Nine Mile Point, Limerick, LaSalle, 05000000
Issue date: 12/14/1982
From: Manno S
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20079J796 List:
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8212280363
Download: ML20079J792 (2)


Text

,

Cbt b go-ly M Y NIAGARA RUMOHAWK NIAGARA ISONAWK POWER CORPORATION /? A) ERIE BOULEVARD WEST, SYRACUSE. N.Y.13202/ TELEPHONE (315) 4741511 SAMUEL F. MANNO VIC3 PRESIDENT NUCLE AR CONSTRUCTION December 14, 1982 1

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Comnission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim 30-day report in accordance with 10CFR50.55(e) for a potentially reportable deficiency. This concerns ITT Barton pressure transducers / transmitters mounted on Rockwell International's hydrogen recombiners. This matter was reported to H. Kister of your staff by telephone on November 19, 1982.

Very truly yours, Niagara Mohawk Power Corpcration

&E f 5Ymuel F'.

.f anni Vice President Nuclear Construction SFM/TRL:bjs Enclosure xc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. D. Schultz, Resident Inspector 8212280363 821214 PDR ADOCK 05000410 b ')1 s PDR \

Niagara Mohawk Power Corporation Nine Mile Point' Nuclear Station Unit 2 Docket No. 50-410 4

Interim Report for Potentially Reportable Deficiency Under 10CFR50.55(e) Regarding ITT Barton Pressure Transducers / Transmitters Mounted on Rockwell International's Hydrogen Recombiners Description Of The Deficiency-Rockwell International has determined that the ITT Barton Pressure Transducer (Part No. 04R-29098 4 20nA) will not withstand the test parameter for radiation of-l x 10I r ads. The testing is a part of Rockwell International's-ongoing IEEE 323 qualification testing of hydrogen recombiners. The ITT Barton Pressure Transducer is used to measure differential or absolute pressure. This was reported to the NRC by Rockwell International under 10CFR21 in a letter dated October 21,1982 (attached).

Rockwell International is the supplier of safety-related hydrogen recombiners for Nine Mile Point Nuclear Station Unit 2; consequently, this matter is 1 considered a potentially reportable deficiency under 10CFR50.55(e).

The corrective action and analysis of safety implications for Nine Mile Point Unit 2 will be included in the final report, which will be submitted by February 11, 1983.

7 1

i i

- -- w- .wi yw- W ~ --tw** -- -"A ""-*P-F'- ""+f