ML20079H570
| ML20079H570 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 12/15/1983 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 4250-L, U-10114, NUDOCS 8401230490 | |
| Download: ML20079H570 (1) | |
Text
rr e
4250-L
/LLINDIS POWER 00MPANY gg)
-0
,g
,,,on p.o. Box s,s. cunion. nunons sn21 December 15, 1983 Docket No. 50-461
./ PRINCIPAL STAFF
_ 4l v' RA 49PRP V
Mr. James G. Keppler tj7RA
~
/d Regional Administrator
'A/RA DRMSP ',/
Region III RC DRMA 14 2.-
U.S. Nuclear Regulatory Commission pao scs 799 Roosevelt Road 5GA ML Glen Ellyn, Illinois 60137 ENF File
/,.
Subject:
Stop Work Order No. 014, 015, and 020 Heating, Ventilation and Air Conditioning (HVAC) Installation
Dear Mr. Keppler:
On June 23, 1982 and August 2, 1982, respectively, Stop Work Order Numbers 014, 015, and 020 were initiated on Heating, Ventilation and Air Conditioning (HVAC) installation.
A recovery plan was developed to correct the deficiencies associated with the Stop Uork Orders.
Illinois Power Company has completed the portions of the recovery plan which were necessary to lift the Stop Work Orders.
The appropriate procedures and instructions have been revised and training has been accomplished and documented.
It is requested that you review Illinois Power Company's actions and concur in the lifting of the Stop Work Orders on HVAC installation.
Sincerely yours, Ha Vice President REC / lag cc:
NRC Senior Resident Inspector Manager - Quality Assurance Director - Office of I&E USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety M
84012304 y ao =90 831215mooog
,a gg
-.