ML20079H562
| ML20079H562 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/16/1983 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20079H565 | List: |
| References | |
| GN-292, NUDOCS 8401230488 | |
| Download: ML20079H562 (3) | |
Text
. _
Georg:a Power Corepany 333 Piedmont Avenue Aitanta Georg'a 30308 Telecho e 404 526 7726 Ma+r3 Address Pot
- Office Bon 4545 Atla'ta. Georg.a 30302 Georgia Power D. O. Foster tre southere erecterc serem i
Vice Pres cert and General Manager December 16,1983 United States Nuclear Regulatory Commission File: X7M00-S10 Offica of Inspection and Enforcement X7BC3-5 O
Region II - Suite 3100 Log: GN-292 101 Marietta Street Atlanta, Georgia 30303 Attention: Mr. James P. O'Reilly i
NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 PSAR CHAPTER 17 UPDATE
Dear Mr. O'Reilly:
In accordance with 10 CFR Part 50.30 and Part 50.54, we are submitting 3 signed originals of Suppicaent 10 to the Vogtle Electric Generating Plant PSAR Chapter 17.
In addition, we are submitting 60 copies to the Documerit Control Desk in Washington, D.C.
In addition, instructions for inserting thic material are provided.
As can be seen from the supplement, the basic Qualfty Assurance Program has not been significantly changed. The changes are essentially admin-istrative in nature in that certain program responsibilities have been transferred from Bechtel Power Corporation (BPC)- to Georgia Power Company (GPC) and Southern Company Services (SCS). Specifically, responsibility for procurement has been transferred from BPC to GPC and the administration of the Supplier Surveillance Program has been transferred from BPC to SCS.
O This will provide for closer GPC administrative controls of the procurement l
and supplier surveillance activities. The changes do not adversely affect t.he technical or quality controls or reduce the commitments of the Quality Assurance Program.
Presently, the Quality Assurance Program addressing the design and con-i struction stage is documented in bcth :.ne PSAR and the FSAR. This supplement constitutes the last change to the PSAR Chapter 17. Any future changes, should they be necessary, will be documented solely as an amend-ment to the FSAR.
O
\\
M ml.mee m co i w
Mr. James P. O'Reilly O
Dec aber, 1983 Page 2 Should you need additional information or clarification, we will be available to discuss this with you at your convenience.
Yours truly g
8.
D. O. Foster DOF/KWK/sw xc: Document Control Desk (60)
W. S. Sanders M. A. Miller D. E. Dutton R. A. Thomas J. A. Bailey L. T. Gucwa O. Batum C. W. Hayes O
O
~
O O
i
PSAR 010 Bechtel PowerCorporation A
Holders of the Vogtle Nuclear Interoffice Memorandum Plant (VNP) Preliminary Safety To Analysis Report (PSAR)
Fde No.
Plant Vogtle - Units 1 & 2 Date Subject Bechtel Job 9510-001 M. Malcom Supplement to VNP PSAR p,,,
Project Management Of Copies to At Ext.-
4110 LA U Attached is VNP PSAR material identified below.
Please acknowledge receipt by completing and returning acknowledgement form provided at bottom of page.
VNP PSAR Supplement 10, December 16, 1983.
Insert this supplement in your copy of the VNP PSAR.
Supplement 10 should be inserted according to the instruc-tions enclosed in the supplement.
DO NOT REMOVE EXISTING WFITE PAGJS FROM THE PSAR.
l!O l
Detach Here l
PSAR 010 j
(
PLEASE SIGN AND RETURN TO DOCUMENT CONTROL WITHIN 30 DAYS.
To:
Bechtel Power Corporation Los Angeles Power Division i
ATTN:
Document Processing Center, Building 42.
I
\\s This acknowledges receipt of the material for the VNP PSAR listed in transmittal memorandum dated December 16, 1983.
My copy of the PSAR has been brought to current status.
Date Signature of PSAR Holder Copy No.
v O
LAO *0400 t I/82
--