Motion for Further Deferral of Parts of Contention 107 Re Unresolved Safety Issues.Ser Inadequacies Cannot Be Answered Until SER Received.Certificate of Svc Encl
ML20079H436
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/17/1984
From: Eddleman W
EDDLEMAN, W.
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20079H440 List:
References
82-468-01-OL, 82-468-1-OL, ALAB-444, ISSUANCES-OL, PLD-840117, NUDOCS 8401230438
Download: ML20079H436 (2)


Text

- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

e l

a UNITED STATES OP AMERICA 13 Januarv 108h NUCLEAR REGULATOBY COMMISSION hkn[

'84 JAN 20 A10:40 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD Glenn O. Bright t,7 7,,. y Dr. James H. Carpenter corigh;ggg &sg. .

James L. Kelley, Chairc:an eRaet In the Matter of CAROLINA POWER AND LIGHT CO, et al. )

(Shearon Harris Nuclear Power Plant, )

Units 1 ani 2) ) ASLFP Mo. 82-h68-01

) OL Motion for Further Deferral of Pa=ts of Contertion 107 by Wells Eddleman

Background:

ALAB-4hl4 recuires the Staff to state in the SFR itself enough information to nake clear the Staff's perception of the relationship between each generic unresolved safety issue and "the eventual oneration of the niant under scrutiny" (see u. C-2 of Harris SER. As detailed in Contentions 107-X and 107-Y filed today, Staff in fact requires other documents (and studies not even done yet) give to its position on many of these tasks, i.e. unresolved safety issues, as they relate to Harris. Since I am required to respond to inadequacies in the SER, but eknnot respond to inadecuacies in +Ae Staff's analysis without seeing it (in some cases they reference page or section whole documents, no citations given), this prejudices my case unless s85 L. I am allowed to resoond with new or amended contentions when the Staff cures its own failures to follow ALA3-hkh in its Har-is SFR.

o Ex Therefore, I respectfully request the Boavd to onder that 38 QQ Eddleman contention 107 remain deferred with respect to those unresolved safety issuen for which the Staff SED does not comply with ALAB-Ithh, until the Staff cures each such deficiency bv amendment' allcwing me 30 days frem its arrival to resnond to a h such anendment. {

DDD3

UNITED STATES OF AMERICA NUCLFAR REGULATORY C0!EISSION Docket 50-hCO In the matter of CAROLIhA PWER k LIGHT CO. Et al. )) 0 L.

Shearon Harris Nuclear Power Plant. Units 1 and 2 CEICIFICATEOF SERVICE Motion for further deferral of I hereby certify that copies of Part= af caw "Hom2", rhe Wells Eddleman's New Contentions and Amended Deferred Content $ons

~

in Mesponse to Staff SER HAVE been served this J day of .Ta min ,,, 19 ( , by deposit in the US Wil, first-class postage prepaid, upon all parties whose names are listed below, except those whose nanes are marked with an asterisk, for whom service was acconplished by Nato 1-day extension of time OK'd 1-126-8h by- e v. n,r !y

  • axter JudEes Jam s Kelley, Glenn Bright and Jav.as Carpenter (1 copy each)

Atonic Safety and Licensing Board US Nu: lear 9egulatory Conmission Washington DC 20555 GeorEe F. Trowbridge (attorney fer Applicants)

Shaw, Pittman, Potts & Trowbridge Luthanne G. Miller 1800 M St. NW ASLB Panel WashinEton, DC 20036 USNRC Washington DC 2C55 5 Office of the Executive Legal Director 111s Lotchin, Ph.D.

Attn Docke ts 50-400/401 0 L. Ph$BridleRun 10 USHRC Chanel Hill NC 2751h Washington DC 20555 Dan Read Docketing and Service Section (3x) CEA!ET/FLP Attn Docke ts 50-h00/hC1 0.L. Waleigh,7707NC Waveross 27606 Office of the Secretary USNRC Dr. Linda W. Little Washington DC 20555 Governor's Waste Mst. Bd.

513 Albenarle B1dg.

John Runkle -

325 N. Salisbutv St.

C I" '

Granv111e Rd Chapel Hill Ne 2751k Bradley W. Jones Robert Gruber USNRC Region II

~Travi s Payne Exec. Director 101 Marietta St.

Edelstein & Payne Public Staff Atlanta GA 30303 Rex 12601 Box 991 Raleigh NC 27605 Raleigh NC 27602 Richard Wilson, M.D. Certified by h 729 Hunter St.

Apex NC 27502 ii