DUKE Powen COMPANY Powan Dutz.nswo 422 SouTu Cucacu STuzzi. GruninTTE. N. C. asa4a wauw ct ennaca.sn.
June 4, 1982
%CF PRE $eQEN' TELEPHQhE! AREA 704 ST Eau PeoouctioN 373-4083 Mr. Harold R. Denton, Director Office of Nuclear' Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369 NRC Ceneric Letter 82-10
Dear Mr. Denton:
Attached is Duke Power Company's response for McGuire Nuclear Station to NRC Ceneric Letter 82-10 transmitted by Mr. Darrel G. Eisenhut's letter of May 5, 1982.
Please advise if there are any questions regarding this response.
V' y truly you WO.
LL William O. Parker, Jr PBN/jfw Attachment cc:
Mr. P. R. Bemis Mr. James P. O'Reilly, Regional Administrator Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
'D 8206000373 020604 PDR ADOCK 05000369 p
...... ~.... -.
_~
~
McGuire Nuclear Station Response to NRC Ceneric Letter 82-10 NUREG-0737 Items Scheduled After March 1, 1982 l
Completion Date or l
Item Requirement Recommended Schedule Proposed Implementation Schedule l
I.A.I.3.1 Revise administrative proce-October 1, 1982 Completed prior to March 1, 1982 - McGuire l
Limit Overtime dures to limit overtime in Station Directive 3.1.4 currently places
)
accordance with NRC Policy more restrictive limits on overtime than Statement issued by Generic required by Generic Letter 82-02.
Letter No. 82-02, dated February 8, 1982.
4 i
I.A.1.3.2 Augment current shift Joly 1, 1982 Completed prior to March 1, 1982 - Station Minimum Shift staffing to conform with Directive 3.1.4 and Section 6 of the McGuire Crew minimum levels set forth on Technical Specifications require minimum page 3-9 of NUREG-0737.
staff levels in accordance with NUREG-0737 l
I.C.1.
Revise procedures by next First refueling after Although the schedule for revised emergency Revise Emer-refueling outage.
10/1/82.
procedures promulgated in NUREG-0737 required i
gency Proce-implementation by the first refueling after dures 1/1/82, we understand that the commissioner's i
are presently considering a revised implemen-tation schedule for this item under the topic 1
of SECY 82-111, " Requirements for Emergency
[
Response Capabilities". Apparently, commis-sion action on this document is scheduled for June 1982. We will respond to the results of this commission action when the revised imple-mentation schedule has been published.
II.D.1.2 Submit plant specific reports April 1, 1982 The required submittal will be made by July 1, RV.& SV Test on relief and safety valve 1982. This date is consistent with License Programs program Condition 2.c.(11)J (as amended).
(Ref.
f amendment 6 to the McGuire Facility Operating License).
II.D.1.3 Submit repcrt of results of July 1, 1982 The required submittal will be made by Block Valve test program.
July 1, 1982.
Test Program -
d i
1 4
Completion Date or j
Item Requirement Recommended Schedule Proposed Implementation Schedule 1
II.K.3.30 & 31 Submit plant specific One year after staff Duke Pcwer Company cannot provide a specific SB LOCA Analy-analyses.
approval of model.
date for completion of this item since the i
sis NRC Staff must complete the review of the small break LOCA model submitted by Westing-house. One year after Staff approval of this model, Duke would expect to submit a small
]
break LOCA reanalysis, if required.
i III.A.1.2 Provide for augmentation of July 1, 1982 Completed - Mr. William O. Parker, Jr's Staffing Levels staffing in accordance with letter to Mr. Harold R. Denton (dated April 3, for Emergency Generic Letter 81-10 dated 1981) described Duke Power Company's provi-Situations 2/18/81.
sions for augmentation of staffing in accor-dance with Generic Letter 81-10.
Duke con-i siders this response as satisfactory to meet the intent of Table B-1 of NUREG-0654 i
(Reference NRC Appraisal Team Report 50-369/
i 82-06).
In this Appraisal Team Report for I
McGuire, augmentation of staffing was reviewed and considered acceptable.
i i
III.A.1.2 Complete modifications.
October 1, 1982 Completed - An April 3, 1981 letter (W.O.
Upgrade Parker to H. R. Denton) described the emer-l Emergency gency support facilities in use at Support McGuire Nuclear Station. The TSC and OSC Facilities were described as upgraded facilities meeting i
the intent of NUREG-0696 with the CMC (i.e.
EOF) meeting interim criteria subject to up-grading by October 1, 1982.
i III.A.2.2 Complete molifications.
October 1, 1982 Duke Power Company's plans for upgrading the Meteorological meteorological systems at McGuire Nuclear i
j Data Station were described in a December 21, 1981 i
letter from Mr. William O. Parker, Jr. to Mr. Harold R. Denton. The proposed schedule for implementation of this upgrade is as i
follows:
)
Final Installation May 31, 1983 Testing June 1, 1983-Septr.mber 29, 1983 Inservice September 30, 1983
- (continued)
- - - _ _ =. -
O r
l i
l l
Completion Date or i
Item Requirement Recommended Schedule
' Proposed Implementation Schedule j
l l
This proposed schedule is justified in that Duke Power Company has taken great strides in all areas of emergency planning to upgrade j
its capabilities for emergency response l
(training drills, exercises, communications, i
facilities, organization). Compensatory I
measures are in place to use the National Weather Service for backup meterological data should the primary towers be unavetlable.
The proposed schedule includes cot.aideration
{
for equipment purchase, installation, and testing. To advance this schedule to meet an I
October 1, 1982 implementation date would not l
be possible due to lead times for the above items. Work is in progress at McGuire to i
implement this upgrade. These are proposed dates and do not assume unforseen delays in receipt of equipment, problems with installa-tion, or failure at testing. Since the pro-posed schedule is longer than the date speci-fled in the McGuire Operating License, a i
license amendment request will be submitted in the near future.
III.D.3.4 Modify facility as identi-Plant Specific Duke Power Company's review of the McGuire Control Room fled by licensee study, proposals.
Control Room for habitability did not result Habitability in identification of any necessary modifica-tions, thus this item was complete at the time of'the original response to TMI concerns (May, 1980) 4 i