Georga Power Company 333 Piedmont Avenue l
eeanta, Georgia 30308 ~
, eW; hone 404 5264526 T
Mailog Address:
Post Off ce Box 4545 f
Attanta, Georgia 30302 Georgia Power L T. Gucwa tw snutren entnc system Manager Nuclear Engneenng and Chef Nuckar Enger NED-84-016 January 9, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 U.S. Nuclear Regulatory Cunnission Washington, D. C. 20555 NRC DOCKE7PS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HA'ICH NUCLEAR PIANP UNITS 1, 2 UPDATE 'IO ASME SECTION XI,1980 EDITION Gentlenen:
On August 12, 1983, Georgia Power Ccupany subnitted to NRC a revision of the inservice inspection programs (includes inservice testing) for Hatch Units 1 and 2.
%e program revisions are a voluntary update to the 1980 edition of ASME Section XI with addenda through Winter 1980.
Both the revised progres'and the transmittal letter stated that the updated progres would~becm e effective January 1, 1984.
Due to the extensive nature of the' update plus problens (e.g., IGSOC) associated with both Hatch units, the inservice inspection / inservice testing plans which implenent the aforenentioned voluntary progra revisions were not available to site personnel on January 1,1984.
We inservice testing r
plans for both Hatch units and the inservice inspection plan for Hatch Unit 2 will be provided to site personnel tentatively by mid-January 1984.
%e inservice inspection plan for Hatch Unit 1 will be provided to site personnel tentatively by mid-February 1984.
Upon receipt of the plans by the site, an implenentation schedule for review, approval, and incorporation into site procedures must be developed.
i.
Please be advised that our inservice inspection plans for the 1984 Hatch L
Unit 2 main recirculation systen piping replacanent outage have been finalized.
%e inspection, including baseline exmination of the new piping, will be performed to the aforenentioned edition and addenda of the ASME Section XI Code.
A nondestructive exanination outage plan for the subject outage has been subnitted to the ph;nt cite and will be reviewed and approved by the Hatch Plant Review Board prior to the start of the inservice inspection work.
8401190411 840109 g
PDR ADOCK 05000321 0
s GeorgiaPower d Director of Nuclear Reactor Regulation January 9, 1984-l Page 2 l
Should you have any questions in this r.egard, please contact this office.
l Sincerely yours, t
/ [ Q - e e, L. T. Gucwa JAE/blm
-. xc:
J. T. Beckhan, Jr.
l H. C. Nix, Jr.
Senior Resident Inspector i
J. P. O'Reilly (NBC-Region II) e 1
I 700775