ML20079F854
| ML20079F854 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/01/1982 |
| From: | Ballweg T, Jackie Cook, Curtis L, Dietrich M, Smith E CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 17502, 82-01-#3, 82-1-#3, NUDOCS 8206080238 | |
| Download: ML20079F854 (3) | |
Text
_____ -_-__-____ - __ _ __ -
O l
Consumers Power Jernes W Cook Vice Presidens - Projects, Engineering
\\
and Construction a
General Offices: 1945 West Parnell Road, Jackson, MI 49201 * (517) 788 0453 82-01 #3 June 1,1982 l
Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT -
DOCKET NOS 50-329 AhJ 50-330 MAIN STEAM ISOLATION VALVES FILE:
0.h.9 57 SERIAL:
17502
References:
J W Cook letters to J G Keppler, Same
Subject:
(1) Serial 14683, dated February 4,1982 (2) Serial 16150, dated April 1, 1982 This letter, as were the referenced letters, is an interim 50 55(e) report concerning deficiencies in electrical components associated with main steam isolation valve actuators, logic cabinets and control panel inserts. provides a summary of the corrective action status with regard to this problem.
Another report, either interim or final, will be sent on or before July 30, 1982.
Op gl. t WRE/lr : MCAR-55, Interim Report 3, " Deficiencies in Electrical Components Associated with MSIV Actuators, Logic Cabinets, and Control Panel Inserts l
CC: Document Control Desk, NRC Washington, DC RJCook, NRC Resident Inspector Midland Nuclear Plant JUN 1 agpgeycfo%$8g g
4 /7 f..,f J'-
/
2 Serial 175C2 82-01 #3 CC: CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel JHarbour, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNRC FJKelley, Esq, Attorney General SHFreeman, Esq, Asst Attorney General WhMarshall GJMerritt, Esq, TNK&J
0
-c/Ol58
~
Serial 17502 Bechtel Associates ProfessionalCorporation 82-01 e "70153
SUBJECT:
MCAR 55 (Issued 1/15/82)
Deficiencies in Electrical Components Associated with MSlV Actuators, Logic Cabinets, and Control Panel Inserts INTERIM REPORT 3 DATE:
May 17, 1982 j
PROJECT:
Consumers Power Company Midland Plant Units 1 and 2 Bechtel Job 7220 Status of Corrective Action and Investigation 1.
Technical Specification 7220-M-238 for upgrading electrical components of main steam isolation valve actuators, logic cabinets, and control panels was issued to Gulf and Western for a quotation on March 26, 1982. The quotation was received on May 10, 1982.
2.
Investigation of adequate qualification and documentation of actuators and electrical components on orders not identified in MCAR 46 is proceeding. The status of this investigation will be provided in the next MCAR report.
Submitted by -
job 4 T.G. Ballweg Mechanical Group Supervisor V
A Approved by:[jL.H. Curtis \\
Project Engineering Manager Concurrence by:
% a b b' E.H. Smith Engineering Manager
'M.A. Dietrich Project Quality Assurance Engineer