- CGW NUCLEAR TECHNOLOGIES 17 cmc,,ase i
ns,. :e v:;:n; re euwe 3:1.;3:-;10a Ter cor, 3314E! Eza6 e
August 1,1991 ff(EEDOM 0F INf0RMAT! Oil ACT REQUEST Dy A _ cv-3 /7 Director Division of Freedorn of Information b 'h [ 7/
and Publications Services Office of Administration
-U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Madam / Sir:
11is respectively requested that a copy of a September 7,1988 response letter from D.C. Cook 2 (Docket No. 50-316), to the NRC on Steam Generator Repair Project Concerns [
Reference:
Attached ACN 8810100192, dated October 4, 1988, first page, last sentence], be made available for public inspection at the U.S. NRC Public Document Room.
Thank you in advance.
Very truly yours, l
/1 j
/ h J O ke n e' L
Barbara J. Williams Secretary i
Attachment l
t 9110070299 910801 PDR FOIA WILLIAM 91-319 PDR
~. _ -.
+
3<c, c['
3 Pif.
twC L E An ht Gut. A10R Y COM' m D:M' E
e s m o t ow. o c w.,n.
-oct ecr., 198 J., *...
- f i
l3 Docket No. 50 316 Mr. Milton P. Alexich Vice President Indiana Michigan. Power Company
- c/o American Electric Power Service Corporation
- I Riverside Plaza
-Columbus, Onio 43216
Dear Hr. Alexich:
SUBJEcli 00NALD C. COOK NUCLEAR PLANT, UN]1 NO. 2, RESTART PROGRAM TOR THE STEAM GENERATOR REPAlR PROJECT (TAC NO. 68423)
Arendrent No.100 to f acility Operating License No. DPR-74 for the Donald C.
Cook Nuclear? Plant, Unit No. 2, approved the-steam generator repair program.
The Safety Evaluation which supported the amendment required you to submit for~-
NRC staff review and' approval the details of the restart test program to be used to return Unit 2.to service following the steam generator repair.
By letter-dated Hay 24, 1988, you su')mitted the integrated startup testing program.
0n July 18, 1988, a reeeting was held with you to discuss the restart test-program, in the meeting, you provided a short -sumary of. the program and provided a copy of each specific test procedure to be used prior to restart:of
-Unit 2..is a' list of the_ procedures provided to the NRC. staff which will be used'in the restart test program.
The NRC staff-reviewed'th'e restart < test program and determined that the proposed program for'the. restart of Unit 2 was comprehensive and provided for-testing of all systems and subsystems that have been er.odified as_ a result of
.the steam generator repair.
During the review, the staff raised concerns with the testing of _the vibration of the reactor coolant system, natural circulation testing,and testing-of _ the steam generator = level, control system.
These concerns
-were conveyed to you. in a phone call-on September-1,.1988.
By-letter dated September 7. 1988, you. responded to each of the concerns.