FOIA Request for 880907 Response Ltr from Util to NRC Re Steam Generator Repair Project Concerns
ML20079E791
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/01/1991
From: Williams B
BABCOCK & WILCOX CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-91-319 NUDOCS 9110070299
Download: ML20079E791 (1)


Text

_

BW

CGW NUCLEAR TECHNOLOGIES 17 cmc,,ase i

ns,. :e v:;:n; re euwe 3:1.;3:-;10a Ter cor, 3314E! Eza6 e

August 1,1991 ff(EEDOM 0F INf0RMAT! Oil ACT REQUEST Dy A _ cv-3 /7 Director Division of Freedorn of Information b 'h [ 7/

and Publications Services Office of Administration

-U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Madam / Sir:

11is respectively requested that a copy of a September 7,1988 response letter from D.C. Cook 2 (Docket No. 50-316), to the NRC on Steam Generator Repair Project Concerns [

Reference:

Attached ACN 8810100192, dated October 4, 1988, first page, last sentence], be made available for public inspection at the U.S. NRC Public Document Room.

Thank you in advance.

Very truly yours, l

/1 j

/ h J O ke n e' L

Barbara J. Williams Secretary i

Attachment l

t 9110070299 910801 PDR FOIA WILLIAM 91-319 PDR

~. _ -.

+

3<c, c['

3 Pif.

twC L E An ht Gut. A10R Y COM' m D:M' E

e s m o t ow. o c w.,n.

-oct ecr., 198 J., *...

  • f i

l3 Docket No. 50 316 Mr. Milton P. Alexich Vice President Indiana Michigan. Power Company

- c/o American Electric Power Service Corporation

- I Riverside Plaza

-Columbus, Onio 43216

Dear Hr. Alexich:

SUBJEcli 00NALD C. COOK NUCLEAR PLANT, UN]1 NO. 2, RESTART PROGRAM TOR THE STEAM GENERATOR REPAlR PROJECT (TAC NO. 68423)

Arendrent No.100 to f acility Operating License No. DPR-74 for the Donald C.

Cook Nuclear? Plant, Unit No. 2, approved the-steam generator repair program.

The Safety Evaluation which supported the amendment required you to submit for~-

NRC staff review and' approval the details of the restart test program to be used to return Unit 2.to service following the steam generator repair.

By letter-dated Hay 24, 1988, you su')mitted the integrated startup testing program.

0n July 18, 1988, a reeeting was held with you to discuss the restart test-program, in the meeting, you provided a short -sumary of. the program and provided a copy of each specific test procedure to be used prior to restart:of

-Unit 2..is a' list of the_ procedures provided to the NRC. staff which will be used'in the restart test program.

The NRC staff-reviewed'th'e restart < test program and determined that the proposed program for'the. restart of Unit 2 was comprehensive and provided for-testing of all systems and subsystems that have been er.odified as_ a result of

.the steam generator repair.

During the review, the staff raised concerns with the testing of _the vibration of the reactor coolant system, natural circulation testing,and testing-of _ the steam generator = level, control system.

These concerns

-were conveyed to you. in a phone call-on September-1,.1988.

By-letter dated September 7. 1988, you. responded to each of the concerns.

l olf I

(

i on % m u outeO4-i

'~

PDR ADOCK 05000316 p

i PNV

-~