3 OPERATING DATA REPORT 90CKET.M0; 50-266, I
DATE' January 9,1984 COMPLETED BY. 'C.
W. FAY TELEPHONE 414'277 2811 OPERATIN6 STATUS
- 1. UNIT NAME: -POINT BEACH NUCLEAR PLANT UNIT 1:
. NOTES
- 2. REPORTIN6. PERIOD:. DECEMBER 1983
- 3. LICENSED THERMAL POWER,(MUT): 41518.
- 4. NAMEPLATE RATIN6 (6ROSS MUEL:
523.8
~5. DESI6N ELECTRICAL RATIN6'(NET MWE):' '497.-
- 4. MAXIMUM DEPENDABLE CAPACITY (6ROSS MWE): 519.
- 7. HAXIMUM DEPENDABLE CAPACITY (NET MUE): 495.
.....................s
- 8. IF CHAN6ES OCCUR IN CAPACITY RATINGS-(ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY-(NET MUE): NOT APPLICABLE
- 10. REASONS'FOR. RESTRICTIONS, (IF ANY): NOT APPLICABLE' THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD' 744 8,760 115,296
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL' O.0 6,506.2 94,078.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.4 625.4
- 14. HOURS 6ENERATOR ON LINE 0.0 6,499.2 91,607.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5
- 14. GROSS THERNAL-ENER6Y-6ENERATED (MUH) 0 7,586,323 123,535,312
- 17. 6ROSS ELECTRICAL ENERGY 6ENERATED (MWH) 0 2,520,190 41,395,980
- 18. NET ELECTRICAL ENER6Y 6ENERATED (MWH)'
0 2,380,714 39,362,434
- 19. UNIT SERVICE FACTOR 0.0 74.2 79.5
- 20. UNIT, AVAILABILITY FACTOR 0.0 74.2 80.1.
- 21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 0.0 54.9 69.8
- 22. UNIT CAPACITY FACTOR (USIN6 DER NET) 0.0 54.7 68.7 23.' UNIT FORCED OUTA6E RATE 0.0 0.1 2.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,.DATE, AND DURATION OF.EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED ~DATE OF STARTUP: MARCH 19, 1984 DATA REPORTED AND FACTORS CALCULAT'ED:AS REQUESTED IN NRC LEFTER DATED SEPTEMBER 22, 1977 8401170192 831231 PDR ADOCK 05000266 R
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE January 9,.1984 4
COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE, DAILY UNIT POWER LEVEL MONTH December, 1983 AVERAGE AVERAGE AVERAGE-DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
.-2 11
-2 21
-2 2
_, - 2 12
-2 22
-2 a
3
-2 13
-2 23
-2 4
-2 14
-2 24
-2 5
-2 15
-2 25
-2 6
-2 16
-2 26
_ -2 7
-2 17
-2 27
-2 8
-2 18
-2 28
-2 9
-2 19
-2 29
-2 10
-2 2d
-2 30
-2 31
-2 AD-28A s
(1-77)
UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH December, 1983 COMPLETE B
C W
Fa TELEPHONE' 414/277-2811 mu a
w wo P
.M "c
"t Po En
- o eu o
moe om ao No.
Date g
gg g
jgg Licensee Event gjo o 'g Cause and Corrective Action e
om e-or Report No.
m so To Prevent Recurrence o-M emc o
E 5
0 o
o 3
831001 S
744 C
1 N/A ZZ ZZZZZZ4 Continuation of 26-week refueling and steam generator replacement outage.
1 F: Forced Reason:
3 4
Method:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) l-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam F-Administrative 5 Exhibit I 'Same
- AD-28B G-Operational Error (explain)
Source (01-78)
H-Other (explain)
. NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-266 Unit Name Point Beach Unit 1 Date January 9, 1984 Completed By C. W. Fay Telephone 414/277-2811 Weeks 9 through 13 of the Unit I refueling and steam generator replacement outage were completed.
Both "A" and "B"
steam generators were set in place and welding on the primary piping and the girth began.
Temporary fixtures and structures in the containment are being dismantled along with the associated cleanup being performed.
Safety-related maintenance included commencing the changeout-of NBFD relays in the' reactor protection and safeguards relay racks, modifying the residual heat removal pipe restraints, and changing out the Rll/12 monitors, i
OPERATING DATA REPORT, DOCKET NO.;50-301 DATE. January. 9, 1984 i
COMPLETED BY C. W.' FAY TELEPHONE 414 277 2811~
OPERATING STATUS
- 1. UNIT NeME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES 2.' REPORTING PERIOD: DECEMBER 1983
- 3. LICENSES THERMAL POWER (NUT): 1518.
.4. NAMEPLATE RATIN6 (6ROSS MWE):.
523.8
~.
- 5. DESIGN ELECTRICAL RATING (NET MUE): 497.
- 4. MAXIMUM DEPENDABLE CAPACITY (GROSS MUE): 519.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
- 8. If CHAN6ES OCCUR IN CAPACITY RATIN6S (ITehS NUMBER 3 THROU6H 7) SINCE LAST REPORT, 6IVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT A*PLICABLE
- 10. REASONS FOR' RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE
~ CUMULATIVE
- 11. HOURS IN REPORTIN6 PERIOD 744 8,760 100,081
'12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 6,370.1 88,428.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.5 198.3
- 14. HOURS 6ENERATOR ON LINE 744.0 6,247.6 86,902.8
- 15. UNIT' RESERVE SHUTDOWN HOURS 0.0 1.5 182.7
- 16. 6ROSS THERMAL ENERGY GENERATED (MWH) 1,120,529 9,379,183 120,894,777
- 17. GROSS ELECTRICAL ENER6Y 6ENERATED (MWH) 377,230 3,158,430 40,959,830
- 18. NET ELECTRICAL ENER6Y 6ENERATED (MWH) 341,221 3,011,633 39,000,600
- 19. UNIT SERVICE FACTOR 100.0 71.3 86.8
- 20. UNIT AVAILABILITY FACTOR 100.0 71.3 87.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.1 69.5 79.2
- 22. UNIT. CAPACITY FACTOR (USING DER NET) 97.7 69.2 78.4
- 23. UNIT FORCED'00TAGE RATE 0.0 0.6 1.4
- 24. SHUTDOWNS. SCHEDULED CVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NOME
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU7: NOT SHUTDOWN I
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE
-January.9, 1984 q
COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH December, 1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY
'MWe NET DAY MWe NET DAY MWe NET 1
489 1.1, 491 21 485 2
489 12 490 22 486 1
3 481 13 492 23 486 s-4 411 14 490 24 484 5
489 15 491 25 486 6
490 16 488 26 488 7
489 17 487 27 487 r
8 489 18 488 28 487 9
489 19 487 29 487 1
10 489 2i) 488 30 489 31 489 i
AD-28A j
(1-77)
CZH8 COC8OO5Zi >ZO ' OgO $OCOd@C n
n O
c A
0OOMt8 ZO* uoIWoH d
t CZH8 Z>3t G O'O*3e t( D O'D CD*t N oD8 t
t NeOl8 3OZ8O geoau&ey, H,cW O>8t QW3CDM<
- H@0A o
u s
0 o
' c OO3'Odo8tO tM O+
E*
M2<
u n
tt 8ttt'G*uc=OZu AHANN44INCHH D
t t
3 r n
fgo t
o) 2 ont m4 n
is n
i c ee g
e tr o
dta td ne Zo.
ONrO p
au s
ote t-M<tDf so od OWCc( W3O QOMMOOrW<D t
4 s
t.
D t nD t
>OfHOD D nD HO(Dr(D
(
(
y ro a
huR yC po cO*OMW ZO*
C
(
t l
O S
mC 8O oD T
uH e
th
'HO<DDr t(OCM*1DDOO
(
D(
R eSn o
M w
C oD H
N g
b 4
MOMO@
%(DeoD*
D n r'
tMDHUHr u
t 3OrDOQ*
QIHpitMCOI nt toCHdaODe MmHFCMO i O D D @'H OU'
>I n
n
(
o t
eOX'HWH3*
HI 3mDCWH t.rHOmfn MOM O
d i.
' nO'OmMi e
to oi 3mHDctDD3OO OM 8Omt NI 3DDC@F tOMm9 mtHOD O m OD r9 n
t u t tDrMM t
r r
Oi cOmCQHHD4 t.
t t-WI
(;(0ri MOM wnc 'HHO n
nTD tn O
>CrOBAcH0 tOMDB l
til Oi coQCHmtrOMN ;DntrMH0 RHOD hI c
Ot*OM OxOH W H ;. w 2CcUQioHoHw
- s rD lt t(
(
'L oI O'O(MmteOM 8MmHDHDD m tHOODm* dtX@3 D
d t
1
>o.
HDHtnt rMArH<O U
MI t
E t M D" H O' P t HI u
aCmED
>O Nmen r
(
QI O'ODMmtHODWw tMMOM
-(x'HAHD~
n D O nCOCMOO
(
r oY<wv
=I O t *D D M
-(XO' H AHD w D
r
(
b
-' NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-301
- Unit Name Point Beach Unit 2 Date January 9, 1984 Completed By C. W.-Fay Telephone 414/277-2811 Unit 2 operated at approximately 486 MWe net throughout the period with no significant load reductions.
Primary-to-secondary leakage remains at less than 10 gallons per day.
On December 6, 1983, Unit 2 went to the ice melt mode of operation.
There was no significant safety-related maintenance performed "on Unit 2 for December.
i 4-i
,9 ntecomun Elecinc romcome 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 January 10, 1984 Director of Regulatory Operations U.
S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of December 1983.
Very truly yours,
/
Vice President-Nuclear Power C. W. Fay Attachments Copies to J.-G.