Application for Amend to License NPF-50,replacing Existing Paragraph in Section 4.2.1, Aquatic Monitoring, of Environ Protection Plan,Appendix B of License.Revised Page Encl
ML20079C331
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/05/1991
From:
Public Service Enterprise Group
To:
Shared Package
ML20079C329 List:
References
NUDOCS 9106190232
Download: ML20079C331 (8)


Text

_ _ _--_-_-_- _ ___-_ _ --

NUCLEAR DEPARTMENT LICENSE CHANGE REQUEST A. IDDTI'IFICATIOt1 IER Nu-ber h/

  • O Y Station / Unit No.

Ney ( w A Sponsor 3 bf.I b Departrent J>cv" W /

fu, a /, $i o Title / Subject

/bw low' E b

"viern 4 !!/

<8 '

E, w, ow., lu l Pr A < c h m Pin.,

B. CESCRIPITON OF GNF,iE: (Attach mrked-up text, tables and/or figures)

De A H ac Lu !

C. JUSTIFICATION EDR GANGE: (Attach written re sons ard attach or reference supporting documentation,, to corpletely justify 3u A H m !u d p

change)

D. 10CFR50.92: (Attach a Significant Hazards Consideration Evaluation, in accordance with 10CFR50.92, which supports proposed charge)

'in /4 h tu cl E. APPf W AtS:

1.

Sponsor

/v ot 41 Date l'1/ /

Departnent AnagerCTEY/rnLy0$#d Date sn4/

2.

ta Cooreinatord. M41_

stile, mee 3.

unager - ta N9I'nn[}n/AbbG s/MUt mee a.

5.

mnager - OsR Aldt'

'Nlf)hlu%

Date 5/4/91 6.

SoRC chairman ( d 1 [ M MIc. 9/ - 0 5 %

Date $/I/9/

7.

Station GM I MN Date d>/I/h/

'/

[ ',

v

.\\

F. NRC T~ZW:

App

/ed in Amendment No.

Date

-or-Rejected in letter dated

~ 8d either:

(1) Rahitted as IfR Revision (2)

Further justified in lette-dated (3)

Intermily cancelled on POEM VRi-008 9-86 9106t?O W y,h j._,54 gas snOc ;

eda P

Ref:

NLR-N91163 STATE OF NEW JERSEY

)

)

SS.

COUNTY OF SALEM

)

S.

La Bruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated concerning the Hope Creek Generating Station, are true to the best of my knowledge, information and belief.

Subscribed and Sworn to before me this

//

day of bow

, 1991 0

A& LustQ +ur NotaryPblicofh'ewJersey My Commission expires on Y dlfkT EUZABETH J. KIDD Notary Public of New Jersey My Commission Expires April 25,1995

f NLR-E91163 ATTACHMENT 1 PROPOSED CHANGE TO ENVIRONMENTAL PROTECTION PLAN HOPE CREEK GENERATING STATION pescription of Chance Replace the existing paragraph in Section 4.2.1.,

Aquatic Monitoring, of the Environmental Protection Plan, Appendix B of the Hope Creek Facility Operating License, with the attached revised section 4.2.1.

Justification for Change Under the Endangered Species Act of 1973 a Section 7 Consultation was reopened involving the National Marine Fir.heries Service (NMFS), the NRC, and PSE&G to discuss the occurrence of impinged sea turtles on the Salem Generating Station circulating water l

system trash bars.

One outcome of this Consultation was a Biological Opinion issued by the NMFS on January 2, 1991.

This document includes an Incidental Take Statement which outlines specific measures the NMFS feels PSE&G should take to facilitate observance and rescue of impinged sea turtles.

The Biological l

Opinion also includes a list of suggested Conservation Recommendations.

On April 11, 1991 the NRC issued a letter to Mr. Miltenberger requesting PSE&G implement the above mentioned changes to the Salem.and Hope Creek Environmental Protection Plans.

The proposed changes are to reference the Incidental Take Statement and the Conservation Recommendations found in the Biological Opinion issued by the NMFS.

The modified version of Section 4.2.1, will incorporate the above mentioned changes into Appendix B, Environmental Protection Plan for Hope Creek Generating Station.

Sionificant Hazards Consideration l

PSE&G has evaluated the hazards consideration involved with the proposed amendment, focusing on the three standards set forth in 10CFR50.92(c) as quoted below:

"The commission may make a final determination, pursuant to the procedures in paragraph 50.91, that a proposed amendment to an operating license for a facility licensed under paragraph 50.21(b) or paragraph 50.22 or for a testing facility involves no significant hazards consideration, if operation of the facility in accordance with the proposed amendment would not:

r

2 (1) involve a significant increase in the probability or consequences of an accident previously avaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety."

The following evaluation is provided for the significant hazards consideration standards.

1.

Does the change involve a significant increase in the probability or consequences of an accident previously evaluated?

The proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.

This change only extends the monitoring period, enhances and documents monitoring and reporting activities, and educates the monitoring personnel in sea turtle identification and resuscitation procedures.

2.

Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?

The proposed changes do not make any physical changes to the plant or changes in parameters governing normal plant operation.

Therefore, the changes do not create the possibility of a new or different kind of accident from any previously evaluated.

3.

Does the change involve a significant reduction in a margin of safety?

The proposed changes involve increased monitoring, documentation and administrative procedures and do not degrade the existing margin of safety.

Therefore, these changes do not involve a significant reduction in the margin of safety.

Conclusion Based on the above safety evaluation, PSE&G concludes that the activities associated with this license amendment request satisfy the significant hazards consideration standards of 10CFR50.92(c).

Accordingly, a no significant hazard consideration finding is justified.

ATTACHMENT 2 PROPOSED CHANGES TO THE ENVIRONMENTAL PROTECTION PLAN, APPENDIX B OF THE HOPE CREEK GENERATING STATION LICENSE 4.0 Environmental Monitoring 4.2.1 Aquatic Monitoring The certifications and permits required under the Clean Water Act provide mechanisms for protecting water quality and, indirectly, aquatic biota.

The NRC will rely on the decisions made by the State of New Jersey under the authority of the Clean Water Act and, in the case of sea turtles and shortnose sturgeon, decisions made by the National Marine Fisheries Service (NMFS) under the authority of the Endangered Species Act for any requirements pertaining to aquatic monitoring.

In accordance with Section 7 (a) of the Endangered Species Act, on January 2, 1991, the NMFS issued a Section 7 Consultation Biological Opinion related to the operation of Hope Creek Generating Station.

This Section 7 Consultation entitled, "Reinitiation of a consultation in accordance with Section 7 (a) of the Endangered Species Act regarding continued operation of the Salem and Hope Creek Nuclear Generating Stations on the eastern shore of the Delaware River in New Jersey," concluded that "... continued operation is not likely to jeopardize the continued existence of listed species."

In accordance with Attachment 1, Incidental Take Statement, to this Biological Opinion, and all subsequent amendments as may be approved by the National Marine Fisheries Service, PSE&G shall:

(1)

Inspect the Hope Creek Generating Station service water intake trash bars once per day and clean as necessary from June 1 through September 30.

p)

Make use of dip nets and other equipment whenever possible to remove smaller sea turtles from intake water trash racks to reduce trauma caused by the existing cleaning mechanism.

(3)

Implement the sea turtle resuscjfation procedures for comatose turtles described in Appbndix I of the Section 7 Biological Opinion.

These procedGres and related materials shall be posted in appropriate areas.

. l l

(4)

The monitoring and reporting system established in 1981 and l

modified in Appendix II of the Section 7 Biological opinion shall continue.

These reports shall be sent to the NMFS, North East Region (NER) within 30 days of any incidental take.

Notification and reporting to the NRC shall be in cecordance with Section 4.1 of this plan.,

Conservation Recommendations, to this Biological i

opinion suggests conservation recommendations for implementation l

by Hope Creek Generating Station.

The Station shall implement these recommendations to the satisfaction of the National Marine I

Fisheries Service.

l 1

l l

l l

l l

J

3 b'/

/

~

);@:HMBE 2 & "N j?,

4 0 ~ft:), ;r[

y~

\\

nu dyq.; [i.

7 Y.

' f-4.7 HC ADDENDIX B

.TO FACILITY OPERATING LICENSE NO. NPF-50 HOPE CPEEK GENEDATING STATION PUBLIC SEPVICE ELECTRIC AND GAS COMDANY DOCKET NO. 50-354 i

ENVIRONMENTAL PROTECTION PLAN (NOND ADIOLMICAf.)

~

t 1

2 0

e

4.0 Environmental Conditions 4.1 Unusual or Important Environmental Events Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related' to plant

. operation shall be recorded and recorted to the NRC within ?4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> followed by a written report per Subsection 6.4'.2.

The followina are excessive b.ird impaction events;,onsite Dlant or. animal disease examples:

outbrecks; mortality or un*nua' occurrerce of any specjss protected by the Endanoered Scecies Act of 1973; fish kills; increase in nuis'ance, oraanisms e

or conditions; and unant cipated or emeroency discharae of waste water or, i

chemical substances.

No routine monitorinn crograms are reouired to implement this condition.

P" 4.2 Environmental Monitorina N

4.2.1 Aquatic Sonitoring b EE L NJ E M~

[TI)(HM95 2)

~

\\

The centifications and eermits reauired under the Clean Water Act ornvide

\\

fg j

\\

\\

\\

\\

l mechanisms for protectina Mter quality and, indirectly, aquatic bio a.

s's

\\.

\\.

erse'v under The NRC will rely on the decih{ons made by the State of New the authority of the Clean Wateq Act for any reouirements for'aauatic N

\\

n.

i A

monitoring.

a-1 a

l k