ML20079C040
| ML20079C040 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/11/1991 |
| From: | Skolds J SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20079C041 | List: |
| References | |
| NUDOCS 9106180317 | |
| Download: ML20079C040 (4) | |
Text
.-__ ___
.~
- [4, fg";f,*g"" * " ^'"' "
$."A$7 i
V u%,
w ow'u
- Csmd.
mx l
SCE&G JUN 111991 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE t10. NPF-12 TECHNICAL SPECIFICATIONS CHANGE - TSP 910003-1 SNUBBERS (GENERIC LETTER 90-09)
South Carolina Electric & Gas Company (SCE&G) is submittirg a revised amendment request to supplement its submittal of February 4, 1991, which requested a revision to Technical Specification 4.7.7, " Snubbers Surveillance Requirements," in conformance with Generic Letter 90-09.
This revision amends the visual inspection criteria of Surveillance Requirement 4.7.7 to include fasteners for the attachment of snubbers to components and anchorages, makes minor wording changes for clarification, and includes the requirements for the first inspection interval, as discussed with Messers. G. F. Wunder and H. K. Shaw of the NRC on April 16, 1991.
Additionally, Virgil C. Summer Nuclear Station intends to perform a base line inspection during the fall 1991 outage to determine the next visual inspection interval.
This revision to the original submittal of April 16, 1991, does not impact the safety evaluation or the no significant hazards determination.
This proposed technical speciffcation change has been reviewed and approved by the Plant Safety Review Committee and the Nuclear Safety Review Committee.
I declare that the statements and matters set forth nerein are true and correct to the best of my knowledge, information, and belief.
Should you have any questions concerning this issue, please call Mr. Manuel W. Gutierrez, at (803) 345-4392, at your convenience.
Very truly yours, k
John L. Skolds MWG:JLS:grs Enclosure c:
See Page 2 9106180317 910611 PDR ADOCA 05000395 00I P
PDR g g rjrj HUCLEAR EXCELLENCE - A SUM 4ER TRADITION!
Document Control Desk TSP 910003-1 Page 2 of 2 c:
- 0. W. Dixon Jr.
(w/oEnclosure)
R. R. Mahan (w/o Enclosure)
R. J. White S. D. Ebneter G. F. Wunder General Managers NRC Resident Inspector J. B. Knotts Jr.
File 813.20)
NUCLEAR EXCELLENCE - A SUf44ER TRADITIO4!
. to Document Control Desh Letter TSP,910003-1 PROPOSED TECHNICAL SPECIFICATION CHANGE TSP-910003-1 VIRGIL C. SUMMER NUCLEAR STATION LIST OF AFFECTED PAGES Page 3/4 7-16 3/4 7-17 3/4 7-18 3/4 7-20 3/4 7-21 3/4 7-22 B 3/4 7-4 B 3/4 7-5 1
l l
l wy 4
gr-
- e em s.wm-me
-ww-
-,,i ---i-w-pe.,.-e--
i,-
,4-c-
--w' m--
s'Tr-'T Tw'
l to Document Control Desk Letter TSP 910003-1 l
f INSERT 4.7.7.b._
Snubbers are categorized as accessible or inaccessible during powerEach The visual inspection interval operation.
to the schedule deterlined by Table 4.7-2.
for each category of snubber shall be determined based on the criteria provided in Table 4.7-2, and the first inspection interval determined using this criteria shall be based upon the previous inspection interval as established by the requirements in effect before amendment...
INSERT 4.7.7.d.
unacceptable and may be reclassified as acceptable for determining the next A
inspection interval provided that criterion (i) and (ii) above are met.
I review and evaluation shall be performed and documented to justify continued If continued operation cannot be operation with an unacceptable snubber.
justified, the snubber shall be declared inoperable and the ACTION requirements of 3.7.7 shall be met.
l
_ _ ___ _ _. _ ________