Monthly Operating Rept for May 1991 for Vermont Yankee Nuclear Power Station
ML20079B288
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/31/1991
From: Murphy W, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VYV-91-134, NUDOCS 9106140191
Download: ML20079B288 (6)


Text

- - -.

VBltMONT YANIWE NUCLEAIt POWEit COltPOltATION

?'

P.O. Box 167, Governor Hunt Road I

ji}

Vernon. Vermont 05354-0157 (802) 257-7711

($7 June 10, 1991 VYV-91-134 U.S.

Nuclear Regulatory Ccmmission ATTN: Document Control Desk Washington, D.C.

20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of May, 1991.

V ry truly yours,

)

VE N

YA 1 C, AR PO R CORP.

W dhWt Senior Vi e}6rp Pres $ e O.ecutions cc:

1) USNRC Region I 475 Allenda?e Road

)

King of Prussia, PA 19406

2) USNRC Resident Inspector, VYNPS DP 0411 Rev. 3 Page 1 of 1 9106140191 910531 PDR ADOCK 05000271 R

PDR t'I l

1 1

i VERMONT YANKEE NUCLEAR.0WER STATION MONTHLY STATISTICAL REPORT 91-05 FOR THE MONTH OF MAY, 1991 DP 0411 Rev. 3 Page 1 of 1

____._.__.~._____.m__._..

4 OPERATING DATA REPORT DOCKET NO.10-271 DATE 910610 COMPLETED BY G.A.

WALLIN TELEPHONE (802)257-7711 QPf. RATING STATUS

1. Unit Name:

yermont Yankee 2.

Reporting Period:

May.

NOTES:

3. Licensed Thermal Power (MWt):1593
4. Nameplate Rating (Gross MWo)t 212 5.

Design Electrical Rating (Not MWe):

514(oc) 504(cc)

6. Maximum Dependable Capacity (Gross MWe):

Elk

7. Maximum Dependable Capacity (Not MWo):

LDA 8.

If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:

N/A 9.

Power level to which restricted, if any(Not MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.00 3623.00 162143.09
12. Number Of Hours Reactor was Critical 744.00 3382.70 131571.33
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 l
14. Hourb Generator On-Line 744.00.

3343.25 128714.85 l

15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 1174091.50 1264259.50 190579564.50
17. Gross Electrical Energy Generated 391968.00 1769691.00 63517386.02
18. Not Electrical Energy Generated (MWH) 373118.00 1694612.00 60326582.00
19. Unit Service Factor 100.00 92.28 78.56
20. Unit Availability Factor 100.00 92.28 78.51
21. Unit Capacity Factor (Using MDC Net) 99.50 92.81 73.05
22. Unit Capacity Factor (Using DER Net) 97.57 91.00 71.63
23. Unie Forced Cutage Rate 0.00 7.72 5._11
24. F

'uowns scheduled over next 6 months (Type, Date, and Duration of Each:

N/A l

25. If shut down at end of report period, estimated date of startup: N/A
25. Units In Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.19F

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.12-171 UNIT Yg1Tignt_ Yankee l'AT E 910630 COMPLETED BY Q. A._ _ WAkhUl TELEPHONE lapfjl31-7711 MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

393 17.

509 2.

514 18, 509 3.

5,15 19.

478 4.

516 20.

506 5,

515 21.

505 6.

515 22.

504 7

515 23.

498 8.

515 24.-

491 9.

QJ 6 25, 488 10, 515 26.

491 11.

515 27, 492 12.

515 28, 494 13, 514 29.

495 14, 511 30, 492 15, 511 31.

48_1 16.

509 INSTRUCTIONS:

On this format, list the average daily unit power level in VdE-Net for each day in the reporting month.

Compute to the nearert whole megawatt.

VYDPP 0411.02 DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.18V 4

n.

4

I f

i UNIT SHUTDOWNS AND POWER REDUCTIONS

[

l REPORT MONTH MAY DOCKET No 50-271 UNIT NAME Vermont Yankee i

DATE 910610 I

COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 4

I I

i 1

2 3

No.

Date Type Duration Reason Method of License System Component Cause and Corrective (hours)

Shutting Event Code Code Action to Prevent i

Down Report i 4

5 Recurr2nce Reactor 91-06 910519 5

0.00 B,H*

N/A N/A RB CONROD Control rod exercising i

and weekly turbine surveillance followed i

by a rod pattern i

4 exchange.

i

[

t 1

F: Forced 2 Reason:

3 Method:

4 Exhibit G-Instructions

[

S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparation of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License C-Refueling 3 - Automatic Scram Event Report (LER) File

~

D-Regulatory Restriction 4 - Other (Explain)

(NUREG 0161)

E-Operator Training and l

License Examination 5 Exhibit I - Same Source f

)

VYDPF 0411.03 F-Administrati-e DP 0411 Rev. 3 G-Operational Error (Explain)

Page 1 of 1

  • H-(Explain)- rod pattern exchange i

9 I

i J

i

[

t

DOCKET NO.

50-271 DATE 9_10610 COMPLETED BY G.A.

WALLIN TELEPilONE (8021257-77L1 REPORT MONTil MAY S11MMARY OF OPERATING EXPERIENCES Rishlights Vermont Yankee operated at 99.1% of rated thermal power for the month.

Gross electrical generation was 391.968 MWHe or 97.6% design electrical capacity.

Onnratina Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 78.7%

of rated thermal power.

910516 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, began cooling tower operations and went to a hybrid cycle of operation.

Varying modes of cycle operation from this point on will be based upon river temperature considerations.

910519 At 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br />, initiated a power reduction to less than 80%

to perforn a rod pattern exchange.

(See Unit Shutdowns and Power Reductions) 910519 At 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br />, completed the rod pattern exchange.

910519 At 0522 hours0.00604 days <br />0.145 hours <br />8.630952e-4 weeks <br />1.98621e-4 months <br />, began a return to full power.

l l

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDFF 0411.04 l

DP 0411 Rev. 3 I

Page 1 of 1 RT No.-13.F01.18X l