Text
,.
- O[
Georg:a Power Cortpany 401nvemecs Cerder Parkway Post Othee Bov.1295.
Birmingham, Alabama 36201 Telephore 205 877J122 j
Georgia Power
- c. K. Mccoy y,['gp ** '
December 29, 1994 V'*
,,,e ym.,n gw,,c,ys,em LCV-0069-D Docket Nos. 50-424 i
50-425 j
TAC Nos. M86875 hi86876 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
i VOGTLE ELECTRIC GENERATING PLANT RESPONSE TO REQUEST FOR INFORMATION i
REGARDING GENERIC LETTER 93-04
)
ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF l
ROD CLUSTER CONTROL ASSEMBLIES l
The NRC's letter dated December 5,1994, requested that the Vogtle Electric Generating Plant (VEGP) either commit to implement the current order timing modification and current order surveillance test as described in (1) WCAP-13864, (2) Westinghouse Technical Bulletin 'NSD-TB-94-05 RO, and (3) the "WOG Recommended Rod Control i
System Surveillance Test," prior to startup from the next refueling outage that starts l
within three months of the NRCs letter, or to provide an alternative schedule, in accordance with the commitments made in our letter LCV-0069-B dated i
September 15,1993, the change to the current order timing and the commencement of the periodic surveillance were implemented on VEGP unit one during the Fall outage earlier this year, and are scheduled for implementation on VEGP unit two during the refueling outage that is scheduled to begin in February of 1995.
The NRC will be notified of the implementation of the changes following the completion i
ofincorporation into VEGP unit two.
Sincerely, h
C. K. McCoy CKM/HWM/gmb cc: (See next page) 0 f
9501050307 941229 PDR ADOCK 05000424 i
P PDR
i:
- +-
g GeorgiaPbwer A -
U. S. Nuclear Regulatory Commission Page 2 '
c(w): Georgia Power Comnany Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle LCV-0069-D