Monthly Operating Repts for Nov 1994 for Bfnpp Units 1,2 & 3
ML20078S365
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/30/1994
From: Salas P, Tanya Smith
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9412280262
Download: ML20078S365 (13)


Text

,

e.

nn Tennessee Vahey Autnanty, Post O".ce Box 2000. Decatut Alabama 35609 DEC 151994 U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter Of

)

Docket Nos. 10- z 59 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (DFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF NOVEMBER 1994 In accordance with the requirements of BFN Units 1, 2,

and 3 Technical Specifications Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of November 1994 in the enclosure.

If you have any questions, please contact me at (205) 729-2636.

Sincerely,

/

/..

A' 7

Pedro Salas Manager of Site Licensing Enclosure cc:

See page 2

{

9412280262 941130 l

PDR ADOCK 05000259

[

R PDR

}

A 3 U. S ', Nuclear Regulatory Commission Page 2 DEC 151994 Enclosure cc (Enclosure):

Mr. Mark S.

Lesser, Section Chief U.S.

Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Frederick J.

Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.

20555 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Jim Lang Director of Engineering and Operations Electric Power Research Institute P.

O.

Box 10412 Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Regional Administrator U.S.

Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Utility Data Institute

]

1200 G Street, NW Washington, D.C.

20005-3802 m

c

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1,

2, AND 3 MONTHLY OPERATING REPORT NOVEMBER 1994 1

OPERATIONAL

SUMMARY

NOVEMBER 1994 BROWNS FERRY.1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 1 has been on administrative hold since June 1, 1985.

As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.

Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

BROWNS FERRY 2 Unit 2 was shutdown for the Cycle 7 refueling outage from November 1, 1994, through November 21, 1994.

Unit 2 achieved initial criticality at 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> on November 21, 1994.

Unit 2 was manually scrammed on November 28, 1994, to perform planned post-os. age maintenance activities.

Unit 2 achieved criticality hours on November 30, 1994.

at 224't BROWNS FERRY 3 Unit 3 remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 3 has been on administrative hold since June 1, 1985.

As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.

Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-259 UNIT:

DROWNS FERRY 1 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 MONTH November 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(HWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

i

A AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-260 UNIT: PROWNS FERRY 2 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 MONTH November 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)

(HWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 157 9

0 24 317 10 0

25 323 11 0

20 372 12 0

27 383 13 0

28 0

14 0

29 0

4 15 0

30 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-296 UNIT:

BROWNS FERRY 3 PREPARED BY:

T.

R. Smith TELEPHONE:

(205) 729-2955 MONTH November 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-259 REPORT MONTH:

November 1994 UNIT: BROWNS FERRY 1 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 Method of License Duration shutting Event System Conponent Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason #

Down Reactor

  • Report No.

Code' Code' Recurrence 1

06/01/85 S

720 F

4 Achinistrative hold to resolve various TVA and NRC concerns.

'F-Forced

'A-Equipment Failure (Explain)

Nethod:

' Instructions for Preparation of Licensee S-Schedated B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueting 2-fianual Scram D-Regutatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain) l I

- ~ - - - - - - - -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-260 REPORT MONTH:

November 1994 UNIT: BROWNS FERRY 2 PREPARED BY:

T.

R.

Sm i'.h TELEPHONE:

(2051 729-2955 Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason #

Do m Reactor

  • Report No.

Code' Code' Recurrence 4

10/01/94 S

486 C

4 N/A N/A N/A N/A 5

11/28/94 S

70 B

2 N/A N/A N/A Planned post-outage maintenance activities.

'F-Forced A-Equipnent Failure (Explain)

' Method:

' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Adninist rative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-296 REPORT MONTH:

November 1994 UNIT: BROWNS FERRY 3 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 Method of License Duration shutting Event System Corponent Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reasc.s#

Down Reactor' Report No.

Code' Code

  • Recurrence 1

06/01/85 s

720 F

4 Administrative hold to resolve various TV4 and NRC concerns.

'F-Forced

'A-Equipment Failure (Explain)

' Method:

' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Ezwination 4-Continuation of Existing Outage F-Adninistrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

l OPERATING DATA REPORT 1

DOCKET:

50-259 UNIT:

BROWNS FERRY 1 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 1
2. Reporting Periods NOVEMBER 1994
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable capacity (Gross MWe):

0

7. Maximum Dependable Capacity (Net MWe): 0 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason:

N/A

9. Fower Level To Which Restricted, If Any (Net MWe):

0

10. Reason For Restrictions, If Any: Administrative Hold THIS NONTH YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Perie 0

0 95743

12. Hours Reactor Was critical 0

0 59521

13. Reactor Reserve Shutdown Hours 0

0 6997

14. Hours Generator On Line 0

0 58267

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 0 0

168066787

17. Gross Electrical Generation (MWh) 0 0

55398130

18. Net Electrical Generation (MWh) 0 0

53796427

19. Unit Service Factor 0

0 60.9

20. Unit Availability Factor 0

0 60.9

21. Unit capacity Factot (MDC Net) 0 0

52.8

22. Unit capacity Factor (DER net) 0 0

52.8

23. Unit Forced Outage Rate 0

0 25.6 t

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined 1

1 Excludes hours under administrative hold (June 1, 1985 to present) 1

OPERATING DATA REPORT DOCKET:

50-260 UNIT:

BROWNS FERRY 2 PREPARED BY T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS

1. Unit Name:

BROWNS FERRY UNIT 2

2. Reporting Period NOVEMBER 1994
3. Licensed Thermal Power (HWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

1098.4

7. Maximum Dependable Capacity (Net MWe):

1065 8.

If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Givo Reason:

N/A

9. Power Level To Which Restricted, If Any (Net HWe):

N/A

10. Reason For Restrictions, If Any N/A THIS MONTH YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Period 720 8016 121327
12. Hours Reactor Was Critical 164 6581 81398
13. Reactor Reserve Shutdown Hours 0

0 14200

14. Hours Generator on Line 117 6523 79149
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Ganeration (MWh) 147270 20472461 229020061
17. Gross Electrical Generation (MWh) 39190 6809000 76016918
18. Net Electrical Generation (MWh) 31691 6636728 73881390
19. Unit Service Factor 16.3 81.4 65.2
20. Unit Availability Factor 16.3 81.4 65.2 1
21. Unit Capacity Factor (MDC Net) 4.1 77.7 57.2
22. Unit Capacity Factor (DER net) 4.1 77.7 57.2
23. Unit Forced Outage Rate 0.0 2.2 17.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup:

N/A Excludes hours under administrative hold (June 1, 1985 to May 24, 1991) l i

OPERATING DATA REPORT l

DOCKET:

50-296 UNIT:

BROWNS FERRY 3 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 l

i OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 3
2. Reporting Period NOVEMBER 1994
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

0 7.

Maximum Dependable Capacity (Net MWe):

0 8.

If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason:

N/A

9. Power Level To Which Restricted, If Any (Net MWe):

0

10. Reason For Restrictions, If Any Administrative Hold i

1 THIS MONTH YEAR TO DATE CUNULATIVE*

)

11. Hours in Reporting Period 0

0 73055

12. Hours Reactor Was Critical 0

0 45306

13. Reactor Reserve Shutdown Hours 0

0 5150 j

14. Hours Generator On Line 0

0 44195

15. Unit Reserve Shutdown Houre 0

0 0

l

16. Gross Thermal Generation (MWh) 0 0

131868267

17. Gross Electrical Generation (MWh) 0 0

43473760

18. Not Electrical Generation (MWh) 0 0

42114009

19. Unit Service Factor 0

0 60.5

20. Unit Availability Factor 0

0 60.5 I

21. Unit Capacity Factor (MDC Net) 0 0

54.2

22. Unit Capacity Factor (DER not) 0 0

54.2

23. Unit Forced Outage Rate 0

0 21.6

24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Reporting Period, Estimated Date of Startup To be determined Excludes hours under administrative hold (June 1, 1985 to present) l

.