Discusses Schedule for Submitting Updated SAR & Other Info to Support Final Design Approval & Design Certification Review,Per 941215 & 1221 Ltrs.Schedule for Submittal of Missing Portions of Candu 3U Will Be Prepared by 950208
ML20078S187
Person / Time
Site: 05200005
Issue date: 01/19/1995
From: Fletcher M
AECL TECHNOLOGIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9502240032
Download: ML20078S187 (2)


Text

-

n \

A* AECL Technologies Inc.

9210 Corporate Boulevard )

Suite 410 Rockville, Maryland 20850 ,

USA 1 1-800-USA-AECL (301) 417-0047 Fax (301) 417 0746 Telex 403-442 January 19,1995 )

l l

Docket No. STN-52-005 File No. 09000401 Control No. 950119001 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, DC 20555

Subject:

CANDU 3U Application for Final Design Approval and Design Certification

References:

1. NRC letter to AECLT (D. M. Crutchfield to A. D. Hink) dated December 15, 1994: Results of the Acceptance Review for AECL Technologies' Application for Final design Approval and Standard Design Certification for the CANDU 3U Design
2. AECLT letter to NRC, 941221001, dated December 21, 1994:

CANDU 3U Application for Final Design Approval and Design Certification Gentlemen:

Reference 1 requested that AECL Technologies Inc. (AECLT) provide a schedule for submitting of an updated CANDU 3U Safety Analysis Report (SAR) and other information required to support a Final Design Approval and Design Certification review. Reference 2 noted that a schedule was being prepared but was dependent upon completing work planning and scheduling for the CANDU 3 Standard Product Design during January 1995. At the present time, work planning and scheduling that impacts CANDU 3 plant design activities is in progress. Until these planning and scheduling efforts are completed, a schedule for submitting missing portions of the CANDU 3U SAR cannot be prepared. AECLT anticipates that the requested schedule will be available for submittal to the NRC by February 8,1995. If there are any changes to this date, AECLT will inform Mr. D. C. Scaletti, the NRC Project Manager for CANDU 3U.

)

9502240032 950119 k0 PDR ADOCK 05200005 CANDUin the USA A subsidiary of Atomic Energy oiCanada

. , \

l P

Document Control Desk Control No. 950119001 Page 2 Should you have any questions regarding this letter, please contact the undersigned.

Very truly yours,  !

h.

M. H. Fletcher Director Safety & Licensing, AECL Technologies Inc.

cc: D. C. Scaletti NRC l

t I

l l

l 1

! ._ J